Muhammad Danish Abubaker

Muhammad Danish Abubaker

Internee

Followers of Muhammad Danish Abubaker2000 followers
location of Muhammad Danish AbubakerKarachi Division, Sindh, Pakistan

Connect with Muhammad Danish Abubaker to Send Message

Connect

Connect with Muhammad Danish Abubaker to Send Message

Connect
  • Timeline

  • About me

    Team Lead | I&C Specialist | Commissioning Engineer | K-Electric | xHUBCO | MBA (IBA) | BE (NED)

  • Education

    • Govt. Degree Science College Malir Cantt, Karachi

      2007 - 2009
      High School Pre-Engineering A+
    • Pakistan International School, Jeddah, K.S.A.

      2005 - 2007
      Matriculation Science A+
    • NED University of Engineering and Technology

      2010 - 2013
      Bachelor of Engineering (BE) Electronic Engineering A-1 (CGPA: 4) Merit Position: 6th

      Activities and Societies: Member of Institute of Electrical and Electronics Engineers (IEEE) '12 Member of Women in Engineering (WIE-IEEE) '12 Event Manager in at Science Quiz & Exhibition (SENTEC) with Society for Promotion of Science Engineering & Technology '12 Member of NED Electronics Volley Ball team '12 Attended Workshops on:- Industrial Control System from CCEE NED Academy.- FPGA based Digital System Designing using VHDL from PAF-KIETParticipated in competitions:- National Engineering Robotics Contest (NERC) by NUST EME, Rawalpindi '12.- Circuit Designing and Line Following Robot Competitions organized by FASTECH '12- SENTEC Quiz Competition '11

    • Institute of Business Administration

      2017 - 2023
      Master of Business Administration - MBA (Executive) Business Administration and Management, General 3.51

      Research Project: Digital Transformation of Pak-Arab Refinery (PARCO)Part of Dean's List for session Fall 2017, Spring 2018 and Fall 2018.

  • Experience

    • Clipsal Pakistan (Pvt) Ltd

      Dec 2012 - Dec 2012
      Internee

      Worked as Internee in departments including Wiring Accessories, Lighting Control Systems, Network Connectivity and Industrial Switches & Sockets.

    • K-Electric

      Jun 2014 - Jan 2022

      Assisted in Instrumentation & Control department at Korangi Power Complex, K-Electric comprises of 04 Gas Turbines, 02 HRSG and 02 Steam Turbines in (2x1x1)x2 configuration. Job responsibilities includes:- Liable for planning and safe execution of all maintenance activities which include preventive, corrective or predictive maintenance to meet performance targets, ensures maximum availability and reliability of equipment. Also ensures that all maintenance activities are appropriately carried out with quality, real spirit of work permit system and other standards of the plant.- Leads a team of subordinates and delegates work to them, performance management of team and ensures timely completion of the same as per defined objectives. Develop Learning Need Analysis for the department and ensures employee training.- Assists the supervisor in preparation of annual budget of I&C section by maintaining safety stock level of critical items and forecasting material consumption pattern. Also, initiates the purchase requisition request, continuous follow-up with supply chain department.- Provides engineering expertise in RCA, troubleshooting and resolution of persistent problems. Avoids rework and gives recommendations for improvement- Prepared procedural documentations and managed internal and external departmental communications.Work experience comprised of maintenance, troubleshooting and planning of:- Woodward MicroNet Plus - Honeywell’s Experion Control System having C200 and C300 controllers- Allen Bradley Guardlogix PLC for HRSG Boiler Protection System- Siemens S7-300 PLC- GE Fanuc RX3i- Woodward 505E ControllerMajor Projects included:- Commissioning of Black Start Capability at KPC- Commissioning of GE-LM6000 Gas Turbines on Liquid Fuel- Installation and commissioning of automated drain valves for gas duplex filters for GE-LM6000 Gas Turbines- Working on plant instruments and control system for Hazloc certification Show less Job responsibility includes:• Preparation of annual objectives for the department.• Supervision of Instrument jobs requiring high professional skills and competence.• Providing technical support for critical recurring problems, analyzing and monitoring corrective actions.• Comprehensive planning and scheduling for Preventive maintenance, short shutdowns and major turnarounds using SAP ERP.• Preparation of cost effective annual budget of the department.• Review available resource plans, availability of manpower, spares and tools.Work Experience for maintenance and Troubleshooting on Control System includes:• ABB Symphony Plus (S+ Operation & S+ Engineering)• ABB 800xA Safety AC 800-M High Integrity System• ABB Procontrol P14 and Process Operator Station (POS30)• Emerson Ovation 3.3.1 Control System • ABB Decontic-K Control System• Mannesmann Hartmann & Braun (H&B) Contronic 3 Control SystemMajor Projects include:• Replacment of Hardwired (Decontik) Control System with state-of-the-art Distributed Control System (ABB Symphony Plus) including Turbine and Boiler Protection Systems.• Installation and Commissioning of PLC based Alarm Annunciation System.• Up-gradation of Data Acquisition System based on M-System Digital Recorders.• Installation and Commissioning of Coriolis type Flow meter for Heavy Furnace Oil.• Installation of Continuous Temperature monitoring system for 6.6 KV motors. Show less

      • Deputy Manager

        Apr 2019 - Jan 2022
      • Assistant Manager

        Jun 2014 - Apr 2019
    • The Hub Power Company Limited (HUBCO)

      Feb 2022 - Mar 2023
      Instrumentation and Control Engineer - Projects & Planning

      - Responsible for providing engineering support for long term and day to day maintenance activities of I&C equipment and providing technical assistance to production team for operations management.- Supervision and planning of corrective, preventive and contractual activities. Developed and co-ordinated plant activity plans related to I&C projects, outages and business plans.- Assisted in inventory management, procurement, availability of critical spares and supported in vendor management.- Planned and implemented change initiatives and supports innovative and creativity.- Ensured safety compliances within I&C department, promotes safety culture, make coordination with HSE department for implementation and continual improvement of HSE system.- User of Maximo ERP (IBM) for management of maintenance activities, procurement, inventory and documentations. Show less

    • K-Electric

      Mar 2023 - now

      - Safe, reliable, efficient and quality oriented maintenance of plant equipment. - Plans, schedules and executes maintenance activities, prepares budget, carries out procurement and arrange services to achieve targets.- Responsible for employee engagement, development of subordinates, recognize and evaluate skills of potential employees. Provides guidance and coaching to help strengthen subordinate's abilities.- Trains and develop I&C team and promotes the culture of Health, Safety and Environment.- Develops strategic plans, organizational structures and systems to fulfil mission driven organizational goals.- Analyzing the root cause of plant chronic problems by applying engineering techniques and data analysis and formulates the engineering solutions and bringing process improvement. Show less - Safe, reliable, efficient and quality oriented maintenance of plant equipment. - Plans, schedules and executes maintenance activities, prepares budget, carries out procurement and arrange services to achieve targets.- Responsible for employee engagement, development of subordinates, recognize and evaluate skills of potential employees. Provides guidance and coaching to help strengthen subordinate's abilities.- Trains and develop I&C team and promotes the culture of Health, Safety and Environment.- Develops strategic plans, organizational structures and systems to fulfil mission driven organizational goals.- Analyzing the root cause of plant chronic problems by applying engineering techniques and data analysis and formulates the engineering solutions and bringing process improvement. Show less

      • Manager

        Jul 2023 - now
      • Manager

        Mar 2023 - Jul 2023
  • Licenses & Certifications

    • Registered Engineer

      Pakistan Engineering Council
      May 2014
    • MENSA Member

      Mensa International
      Jan 2020
  • Honors & Awards

    • Awarded to Muhammad Danish Abubaker
      Got recognition from K-Electric management for successful commissioning of black start project K-Electric Oct 2021
    • Awarded to Muhammad Danish Abubaker
      Won best “Safety Promotional Activity” award across K-Electric for the month of July 2021 K-Electric Jul 2021
    • Awarded to Muhammad Danish Abubaker
      Part of K-Electric talent pool and identified as “Future Potential” in LEAD program K-Electric Apr 2019
    • Awarded to Muhammad Danish Abubaker
      Part of Dean's List for session Fall 2017, Spring 2018 and Fall 2018 Institute of Business Administration, Karachi Dec 2018