RAMDIKA NUR HARIANTORO

RAMDIKA NUR HARIANTORO

DRAFTER

Followers of RAMDIKA NUR HARIANTORO304 followers
location of RAMDIKA NUR HARIANTOROBandung, West Java, Indonesia

Connect with RAMDIKA NUR HARIANTORO to Send Message

Connect

Connect with RAMDIKA NUR HARIANTORO to Send Message

Connect
  • Timeline

  • About me

    QA/QC Engineer | Welding Inspector (IIW) | NDT ASNT level II (RT, MT, PT) | Asset Integrity Engineer | Metallurgy & Material Engineer | Project Manager

  • Education

    • Universitas Jenderal Achmad Yani (Unjani)

      2009 - 2013
      Bachelor of Engineering (BEng) Metallurgical Engineering
  • Experience

    • PT.SURYA TARRA MANDIRI

      Feb 2011 - Apr 2011
      DRAFTER

      Handling project drawing

    • PT. PAL INDONESIA

      Jul 2012 - Sept 2012
      NDT INSPECTOR

      Radiograph Test Film Interpreting

    • Metal Laboratory

      Sept 2012 - Oct 2013
      Laboratory Assistant Coordinator

      Work as laboratory assistant coordinator managing test equipment, maintain metal testing equipment, making standard operating and procedures of metal testing.

    • PT. KAI (Persero) - Balai Yasa Jembatan

      Aug 2013 - Oct 2013
      Coating Inspector

      Coating inspection on metallic substrate while doing some final research project

    • PT. PARKER METAL TREATMENT INDONESIA

      Jan 2014 - Aug 2014
      Process Engineer

      - Handling New Trial Parts- Supervise Quality Inspection of Ater Process Parts- Analyze Abnormal Condition on Heat Treating Process- Prepare The Standard Operational Procedure & Report for Heat Treating Process

    • PT. Citra Teknika Utama

      Aug 2014 - Jan 2015
      Inspector

      - Perform maintenance and inspection on Power Plant facilities, Work for PT. Indonesia Power UBP Priok.- Performing RLA for HRSG, on In-site Metallography Examination.

    • PT. Tripatra Engineers and Constructors

      Apr 2015 - Dec 2015
      QA/QC Engineer

      - Coordinating with Piping & Welding Dept, Coating & Insulation Dept.- Handling DWR and DSR Related to Construction Department Target.- Manage The Welder Test to Meet The Project Requirement.- Coordinating with Exxon - Mobil Cepu.Ltd QC Department.- Performing Line Check as it Fit With The Drawing.

    • PT. SURYA TARRA MANDIRI

      Jan 2016 - Aug 2018
      QC Staff

      Client : PT. YAMAHA INDONESIA MOTOR Mfg, Jakarta- Performing QC Standard Check for Finished Goods as Per Client Specification.- Perform Product Measurement, Design & Material Selection For Client Needs.- Company Representative For Witness Vendor Progress.- Direct Production Dept, To Meet Client Target.Client : PT. TJ FORGE, Indonesia.- Performing QC Standard Check for Finished Goods as Per Client Specification.- Perform Product Measurement, Design & Material Selection For Client Needs.- Company Representative For Witness Vendor Progress.- Direct Production Dept, To Meet Client Target.Client : PT. YAMAHA INDONESIA MOTOR Mfg, West Java- Performing QC Standard Check for Finished Goods as Per Client Specification.- Perform Product Measurement, Design & Material Selection For Client Needs.- Company Representative For Witness Vendor Progress.- Direct Production Dept, To Meet Client Target.Client : PT. IHARA Mfg, Indonesia- Performing QC Standard Check for Finished Goods as Per Client Specification.- Perform Product Measurement, Design & Material Selection For Client Needs.- Company Representative For Witness Vendor Progress.- Direct Production Dept, To Meet Client Target.Client : PT. AF AOYAMA, Indonesia- Performing QC Standard Check for Finished Goods as Per Client Specification.- Perform Product Measurement, Design & Material Selection For Client Needs.- Company Representative For Witness Vendor Progress.- Direct Production Dept, To Meet Client Target. Show less

    • PT. ARANDRA CITRA MANDIRI

      Jan 2019 - Apr 2019
      QC Inspector

      Client : PT. Pertamina (Persero) S.O.W : - QC Welding Inspector & Performing Dye Penetrant Test. - Review All WPS & NDE Procedure related to on going project.- Fuel Oil Pipe Relocation on Purbaleunyi Highway. - Witnessed Welder Test. - Visual & NDE Inspection of Weld Joint C/S Pipe Casing w/ Auger Boring Method.

    • PT. INDOCIPTA GEMILANG

      Apr 2019 - Sept 2020
      QA/QC Engineer

      Client : Petrochina International Jabung. Ltd. S.O.W :QA / QC Engineer for Piping & Mechanical works EPCC New Installation GTG (Gas Turbine Generator) & WHRU (Waste Heat Recovery Unit) at Petrochina International Jabung. Ltd. - Perform Welding Inspection for Piping Works on Gas Plant Shut Down Activity. - Witnessed & Inspect Piping Works,- Review NDT Document & Report, - Witnessed & Inspect Hydrostatic Test - Witnessed & Inspect Instrument Testing Installation for Flowline at New Oil and Gas Wellpad West Betara. Show less

    • PT. LAPI ITB

      Sept 2020 - Jul 2022
      Inspection Specialist

      - Perform inspection on FPU Offshore Platform Facilities, Work for ENI Muara Bakau B.V.- Perform inspection on NH3 (Ammonia) Storage Tank , Work for PT. Petrokimia Gresik.- Perform inspection on Turbine & Generator, Work for PT. GLP.- Performing RLA for HRSG, on In-site Metallography Examination.

    • PT. Dago Energi Nusantara

      Jul 2022 - now
      Asset Integrity Engineer & Project Manager

      Project of FFS & in-situ metallography at Booster Station km 77 OCSA of PERTAMINA GAS.Feb 2024 - RecentProject Manager.- Coordinator for project, coordinate project team & end user to achieve objective & project goals.- Guide In-SItu Metallography Team & Technician to perform safely on site, on schedule & on time which aim the best quality result of In-Situ Metallography Replicas, Portable Hardness Test & UT Thickness Measurement.- Coordinate & performing in-depth analysis with practicioner & expertise (professor in material & mechanical engineering). Enhancement & Utilization Asset Integrity Management System - PeatricePertamina SHU Project.Apr 2023 - Mar 2024-Coordinator utilization team for Enhancement & Utilization AIMS - PeatricePertamina SHU Project, coordinate utilization team for National Region 1 -4 & International region 5. collect enhancement advice from user &comunicate with IT Developer team to solve, fixing bug and enhancefeature.-PIC for floating module of Peatrice application, perform internal studies andassessment related to floating integrity management system (hull,mooring & mooring buoy integrity). and make sure each elementfrom FIMS module works properly before roll-out to production server sothat it can then be utilized by users properly.FEED Converter Unit C4 Polymer - PT. Kilang Pertamina Internasional - RUIII Plaju Project.Feb 2023 - Apr 2023-Advisor for piping & static equipment (Heat Exchanger) material selectionfor FEED Converter Unit C4 Polymer - PT. Kilang Pertamina Internasional -RU III Plaju Project.Asset Integrity for Pertamina Hulu Rokan Project.Jul 2022 - Jan 2023- Perform review WPS, Mock up vessel preparation, Inspection before-duringand after for In Service Welding for Static Equipment, and witnessing weldjoint macro & micro structure examination.- Perform technical studies for minimum thickness pipe requirement for inservice welding activities at PHR pipeline facilities. Show less

  • Licenses & Certifications

    • T-BOSIET

      OPITO
      Sept 2020
    • Certified Radiographic Interpreter (CRI)

      Ministry of Industry
      Aug 2018
    • ASNT NDT Level II Certification - Liquid Penetrant Testing (PT) (ASNT-NDT2-PT)

      Ministry of Industry
      Oct 2018
    • ASNT Central Certification Program Level II - Magnetic Particle Testing (ACCP-MT)

      Ministry of Industry
      Oct 2018
    • International Welding Inspector Personnel

      International Institute of Welding
      Dec 2014