Vu Thi Hanh

Vu Thi Hanh

Bridge and Tunnel Engineer, Cost Estimator

Followers of Vu Thi Hanh381 followers
location of Vu Thi HanhVietnam

Connect with Vu Thi Hanh to Send Message

Connect

Connect with Vu Thi Hanh to Send Message

Connect
  • Timeline

  • About me

    Cost Control Engineer at SYSTRA S.A Consultant for the Hanoi Metro Project Line 3 (RICS- Foundation in QS)

  • Education

    • Hanoi University of Civil Engineering

      2000 - 2002
      Bachelor’s degree Bridge and Highway Engineer Excellent
    • Hanoi Architectural University

      1995 - 2000
      Bachelor’s degree Civil Engineering Excellent
  • Experience

    • BRITEC- TEDI

      Apr 2002 - Sept 2005
      Bridge and Tunnel Engineer, Cost Estimator

      Participate in all stages of the project from FS, Technical Design to Construction, responsibility for Calculation Structure, Technical Design Drawings, Shop Drawings, Establish BOQ, Calculate the Quantity, make the Cost Estimate for many Transport Projects in Viet Nam about Bridge, Road and Tunnel.

    • BRITEC-TEDI

      Sept 2005 - May 2010
      Cost Estimator/ Quantity Surveyor

      Joint Venture consultant: Japan Bridge & Structure Institute (JBSI - Japan) in association with the Luis Berger Group (LBG - American) & Bridge and Tunnel Engineering Consultants (BRITEC - TEDI) to implement The Transport Urban Infrastructure Development Project in Ha Noi City Phase 1 (ODA’s funded from Japan)- Establish and Adjust Cost Estimation in Technical Design Stage. Responsible for Interim Payment Certificate, Cost Estimation for Additional Works and Variation Order, Escalation, Final Payment for 3 Construction Packages: Construction and Improvement of: i) Nga Tu So Intersection (fly over extradosed bridge), ii) Kim Lien Intersection (Underpass tunnel), Nga Tu Vong Intersection (fly over bridge) Show less

    • SYSTRA

      May 2010 - now
      Cost Control Engineer / Quantity Surveyor

      Project Implementation Consultant for the Hanoi Metro Project Line 3:- Technical Design Stage: Establish the Cost Estimate, Tender Document, Bid Evaluation, Preparation of the contractual “Bill of Quantity” for all 5 Construction Packages for Project Hanoi Pilot Light Metro Line No.3 – Section Nhon – Hanoi railway station. Metro Line has 8,5km elevated section and 4km underground section, consist of 8 elevated stations and 4 underground stations and Depot.- Construction Stage: Participate in Interim Payment Certificates, Variation Request, Additional Cost, Price Adjustment, Contract Amendment for Construction Packages. Show less

  • Licenses & Certifications

    • Practicing Certificate on Cost Evaluation, Grade 1

      Ministry of Construction
    • Practicing Certificate on Design Execution

      Ha Noi Department of Construction
    • Practicing Certificate on Bid Execution

      Ministry of Planning and Investment, Vietnam
    • Certificate Foundation in Quantity Surveying

      RICS
      May 2020