Ravi Singh

Ravi Singh

Engineer - Instrumentation and Control

Followers of Ravi Singh654 followers
location of Ravi Singh印度 马哈拉斯特拉邦 孟买

Connect with Ravi Singh to Send Message

Connect

Connect with Ravi Singh to Send Message

Connect
  • Timeline

  • About me

    Manager-Instrumentation || Green Field Project & Planning || Engineering & Procurement || Erection & Commissioning || Operation & Maintenance ||MBA(O&P),MTech(IC),BTech(EC) || Ex RIL,VOL,AIL||

  • Education

    • UP Board

      -
      Intermediate 10+2 Math, Physics and Chemistry 1st Division
    • Jaipur National University

      -
      Master of Business Administration - MBA Project Management 1st Division
    • University of Allahabad

      -
      Master of Technology - MTech Instrumentation Technology 1st Division
    • Dr. Ram Manohar Lohia Avadh University

      -
      Bachelor of Technology - BTech Electronics and Communications Engineering 1st Division
  • Experience

    • BHILOSA INDUSTRIES PRIVATE LIMITED

      Oct 2008 - Mar 2011
      Engineer - Instrumentation and Control

      Training Instrumentation Engineer at Petrochemical Section.Various instruments such as Pressure Tx, Flow Tx, Control Valve, On/Off Valve,Safety Valve, Rupture Disc,Temp Tx, level Tx, VFD, Mass Flow Tx, DCS, PLC, Powder Convening System, Heater etc.Routine Maintenance- Preventive, Predictive and Corrective, Shutdown, Shift Handling, Man Power Handling, Calibration etc.

    • Alok Industries Ltd

      Apr 2011 - Feb 2015
      Engineer- Instrumentation

      Worked as an Engineer -Project Instrumentation & Control at Petrochemical (CP & EG Recovery) Plant.Have commissioned 03 nos of Green field Project Petrochemical (Polymer) with 5000 no of IO's Yokogawa DCS Centum CS3000 for each. Project Documents referred for Cause & Effect, Logic Checking, Interlock list, Alarm Setting and Narrative. Created new logic & Graphics modification on DCS as process requirements.P&ID, PFD, IPDS and Isometric Drawing, Cable route layout etc has referred for Planning & Installations. loop checked as Cold loop & Hot loop and healthyness of instrument. Used HART 475/375 for re-range of field instrument.DCS panel’s Power charging. Communication of DCS with PLC over modbus. 收起

    • Reliance Industries Limited

      Mar 2015 - Jul 2017
      Manager - Instrumentation (Project)

      Worked as Manager Instrumentation & Control at Gas Cracker Unit. Gas Cracker feed line has taken on ethane tank, 700 IO’s Yokogawa DCS Centum VP installed and Commissioned.Upgradation of ESD system with Triconex PLC as well as field instrument Pressure switch to Pressure transmitter.Planning of man power, Prepared of schedule for installation, calibration and construction. Checked Narrative & logic, cause & effect, DCS SAT, indent of consumable item.

    • IOL Chemicals and Pharmaceuticals Limited

      Jul 2017 - Jul 2018
      Assistance Manager - Instrumentation (Project & Maintenance)

      Worked as Lead - Instrumentation at Chemical unit Iso Butyl Benzine, Ethyl Acetate, Aluminium Chloride, Mono Cloro Acetate, IBU etc.Ensuring reliability centric maintenance as like Preventative, Predictive & Correctives. Root cause analysis through why why analysis.IBB Plant Additional reactor installed for production enhancements- budgets prepared, IPDC, Logic Preparation and implementation on ABB DCS.Recruitment mentor for GET, Man Power handle, Spare Indent, Operation and Maintenance, PLC & DCS logic modification, Cost saving scheme. 收起

    • Vinati Organics Limited

      Aug 2018 - Aug 2024
      Dy Manager - Instrumentation (Project & Maintenance)

      Presently working as a lead Instrumentation for Green field project and maintenance. Had commissioned 4 no’s of Antioxidant Plants. Was Leading instrumentation team during Details Engineering of Project, instrument selection, Preparation of IPDS, P&ID, Cause & Effect, Enquiry Floating, TBA, Commercial Negotiation.Commissioned Yokogawa DCS (4000 no of IO’s) & Allen Bradly make PLC. Attend Kick of meeting, HDM, FAT. Have done communication between DCS & PLC over Mod Bus Protocol. Many type of instrument using as like that Mass flow, Temp, Pressure, Level, Control Valve, On/Off Valve, Speed, Safety Valve, Fire and Gas system, EPABX system.Engineering to enhance Production with Quality and optimise maintenance and operation. Preparing annual budget and tracking the approval vs actual budget consumption.Identify,Study,Propose and implement area for improvement in the field of instrumentation.Ensuring reliability centric maintenance practices follow- SOP, SMP, life cycle of instrumentation, maintain critical spare. Man power handling as scheduled, discussions with all HOD regarding instrumentation issue and improvements. 收起

    • Gharda Chemicals Limited

      Aug 2024 - now
      Manager- Project & Design (Instrumentation)

      Coordinates project execution activities to ensure that all Instrumentation and control projects are implemented within budget and schedule.Monitors project progress through project coordination meetings and other means, against project schedules and budgets; deploy resources as required to accomplish these goals.Responsible for managing a team of multi-disciplined team during construction and commissioning of Instrumentation and control type projects, ensuring the site is controlled and managed per the clients standardsMonitoring contractors and ensuring the control & instrumentation design intent is maintained for all systems and associated field equipmentEnsure works are engineered and constructed in compliance with all HSE requirementsTechnically astute with all aspects of control and instrumentation (design basis to P&ID developments, field instrumentation, control and safety systems, etc.)Develops overall plans, schedule of activities, budgets resource requirements and controls the project as per the project planObtain approvals from clients for all the material approvals, shop drawings and work execution schedulesReviews proposals, keeps track of project finance and costing, highlight deviationReviews and studies the scope of works described by the contract document, project specifications, contract drawings and BOQPrepares work execution schedule with start/finish dates for all project activities and submits to the client for approvalCoordinates with procurement department for order, approval and timely delivery of all instrumentation and control materialsCoordinate with vendors to perform Factory Acceptance Tests (FAT)Provide Senior Management with periodic status reports of site operation and construction activities 收起

  • Licenses & Certifications

    • ABB DCS Freelance

      ABB
      Jan 2017
    • DCS Microverse

      Microverse Automation Pvt. Ltd.
      Jan 2025
    • DCS Certified in Engineering, logics & Graphics (CEG)

      Emerson
      Nov 2023
    • PLC Programming

      Sofcon India Pvt.Ltd.
      May 2008
    • Industrial Tranning Certificate

      Bharat Pumps & Compressors Limited
      Oct 2007
    • Centum VP Engineering Programming

      Yokogawa India Limited
      Jul 2019
    • DCS CS3000 Engineering

      Yokogawa
      Sept 2011