Joy Puno

Joy puno

bookmark on deepenrich
location of Joy PunoMetro Manila, National Capital Region, Philippines
Phone number of Joy Puno+91 xxxx xxxxx
Followers of Joy Puno227 followers
  • Timeline

    Apr 1998 - Jul 2004

    Landscape Architect/ Sr. Autocadd Specialist/Drafstman and Autocad Operator

    MANILA INTERNATIONAL AIRPORT AUTHORITY
    Aug 2004 - Oct 2005

    Architect

    ZABAT BUILDERS INC.
    Oct 2005 - Jul 2007

    Project Architect/Assistant Project Manager

    B & C GLOBAL CONSTRUCTION GROUP INC.
    Jul 2007 - Jul 2008

    Architect

    SPECIALIZED PROFESSIONAL CONTRACTOR WLL
    Sept 2008 - Jul 2009

    Project Architect

    MULTI DEVELOPMENT AND CONSTRUCTION CORP
    Jan 2010 - Jul 2012

    Architect

    AL FAYHAA MARBLE
    Sept 2012 - Nov 2015

    Architecture/Civil QAQC

    Hyundai Engineering Co. Ltd.
    Bangladesh
    Jun 2016 - Nov 2016

    Architect

    ITB Construction
    Dec 2016 - May 2017

    Architect

    Freelance Architect
    Jun 2017 - Jun 2019

    Architectural Engineer

    S.K. Engineering
    Current Company
    Jan 2023 - now

    QA/QC Architect

    D.M. CONSUNJI, INC. (DMCI)
  • About me

    Architectural Engineer at S.K. Engineering

  • Education

    • University of saint louis

      1993 - 1998
      Bachelor's degree architecture
  • Experience

    • Manila international airport authority

      Apr 1998 - Jul 2004
      Landscape architect/ sr. autocadd specialist/drafstman and autocad operator

      General Services Division - January 2003 – July 2004Landscape Architect Developed and produced design, bill of materials and cost estimates of landscape improvement and rehabilitation projects. Utilized multiple design software packages for preparation of architectural drawings including 2D and 3D modeling. Conducted research on indoor and outdoor plants and its characteristics. Designed proposals and assist the management for the improvement and beautification of airport terminals of: NAIA Centennial Terminal 2 arrival garden patio NAIA Terminal 3, MIAA Complex and Plant NurseryCivil Works Department - March 2001 – December 2002Sr. AutoCAD Operator Specialist Produced auto CAD profiles and details. Performed an array of administrative duties related to architectural construction projects, reviewing drawings and other submittals and coordinating with other departments. Conducted Site Surveys, research and civil works. Involved in the repair and overlay of Runway 06/24 and Taxiways 13/31 and MIAA Lot InventoryDesign and Planning Division - April 1998 – March 2001 Draftsman/AutoCAD Operator Coordinated with other agencies, data gathering and survey works. Created physical architecture models such as interior and structural design, detailing and material specification for presentation purposes. Organized drawing sets of electrical, mechanical and other documentations. Building Maintenance of Manila Domestic Airport, NAIA International Terminal 1 and 2 Involved in the design and construction of: EPABX Building, Airport Police Department Building; perimeter fences, guardhouses, roads and pavement, drainage system, pedestrian and vehicular shed, sport facilities, carpentry, steel shop drawing, signage. Show less

    • Zabat builders inc.

      Aug 2004 - Oct 2005
      Architect

       Performed residential designs for high-end homes and commercial design projects with AutoCAD and 3D presentations. Provided necessary coordination and planning with the management. Conducted studies and special projects on space planning, and other related architectural engineering issues.

    • B & c global construction group inc.

      Oct 2005 - Jul 2007
      Project architect/assistant project manager

      Project Assistant Manager – November 1, 2006 – July 15, 2007 Promoted to Project Assistant Manager position due to dedication and strong work ethic,  Designed, built and managed two major Police Station projects at Naguilian Isabela and Piat Cagayan with 2 Million Pesos budget respectively. Proven eye for detail in documentation - from design development through to construction Managed manpower resources, operational costs, equipment, material procurement, and delivery. Monitored compliance with all safety guidelines and policies. Tracked project progression using project management tools. Successfully implemented and completed the project ahead of schedule under projected budget estimates. Involved in selection process of project team members.Project Architect – October 15, 2005 – October 31, 2006 Developed designs and presentations for residential and commercial buildings. Carried out budget preparation, estimation and bids along with producing various proposals, planning, necessary contracts and scheduling of work for implementation. Made daily decisions about construction activities.  Successfully established and implemented work schedules to meet project deadlines. Ensured all site personnel used quality workmanship in accordance with plans and client needs. Show less

    • Specialized professional contractor wll

      Jul 2007 - Jul 2008
      Architect

       Designed and modified CAD drawings of architectural composite reflected ceiling plan and wall partition lay-out. Completed schematics, CAD drawings and 3D design works for implementation.  Coordinated with structural, mechanical and electrical departments with their features such as lighting, fan, smoke and heat detectors, speakers, sprinkler system, exhaust and AC diffuser.Project Handled:  The PEARL Qatar – High-rise Condominiums, Townhouses, Retail Shops, Arcades

    • Multi development and construction corp

      Sept 2008 - Jul 2009
      Project architect

       Worked in a team of Engineers, Architects and 200 workers. Involved in site supervision of interior designs and Fit-Outs for Shangri-la Hotel in Boracay Resort, Philippines and 10-Storey Picasso Suites Building. Planned and executed scheduling of work to meet client deadlines. Attended project coordination meetings and recorded minutes of the meeting. Created and produced technical writings and documentation and actual quantity take-off and material purchase requests. Conducted quality assurance and quality control. Reviewed bill of quantities for implementation of actual scope of work. Successfully monitored of project status and its compliance to contract provisions. Designed and modified CAD and 3D drawings, proposals and modifications for consultant's approval. Initiated and provided project staff and management technical support to Designs, Logistics, Engineering and Operations in addressing any variation order in resolving problems encountered during implementation. Show less

    • Al fayhaa marble

      Jan 2010 - Jul 2012
      Architect

       Developed construction autoCAD drawings and 3D renderings and presentation for design proposal and modification of floor wall cladding, marble, granite and other requirements for the clients. Produced bill of quantities and quotation for client approval. Conducted actual site inspection, measurements for final cutting list. Successfully established and implemented work schedules to meet project deadline. Coordinated with owners, engineers or representatives.  Directed and supervised details of showroom and building expansion projects.Projects Handled: Ministry of Higher Education Building, Riyadh, Saudi Arabia Princess Noura University, Riyadh, Saudi Arabia Ajlan Palace, Riyadh, Saudi Arabia Khaled Al Salem Villa Al Fayhaa Marble Showroom Show less

    • Hyundai engineering co. ltd.

      Sept 2012 - Nov 2015

       Quickly promoted to Quality Control position due to strong leadership, organizational abilities and strong work ethic. Review plans and latest drawing; Checked and approved Request for Inspection (RFI) and Inspection Test Report (ITR); Contract and specification; Method of statement; Surveys and coordination, elevation and alignment; Material approval and receiving reports. Implemented quality goal and objectives. Successfully implemented testing, measurement and inspection of the following: concrete slump and compressive strength test; Pile integrity test; Soil compaction test; Bolt torque test; Paint thickness gauge test; Basic welding visual and fit-ups; Dye penetrant test; Hydro and Pneumatic pressure test; AC Duct and refrigerant leak test; Waterproofing leak test, equipment calibration Created detailed weekly and monthly reports for all QA/QC and engineering documents and log; Non-conformance Report (NCR) and Preventive Action Report (PAR); punch lists; Mechanical completion package (MCC) and handover documents. Conducted regular site inspections to minimize construction site error, revisions to ensure project milestone and compliance of building and safety standards. Assessed and addressed site issues with site personnel/sub-trades and provided solutions.Projects Handled: BAPP - Ashuganj 225 MW Combined Cycle Power Plant, Central Control and Electrical Building, Steam Turbine Building, Water Treatment Building, Gas Turbine Building,  HRSG and Bypass Stack Foundation, Equipment, Pumps and Transformer Foundations, Intake Tower and Pump Station, Roads and Drainage. Show less  Provided and produced bill of quantities, daily progress report; survey report and RFI Successfully performed test, measurement and inspection of soil compaction test, slump and compressive strength test. Created and produced CADD works and modification; field change notice and punch lists, Conducted regular site inspections to ensure site conditions and. construction progress is in compliance with building and safety standards and quality control procedures. Planned, assessed and successfully addressed site issues and work with site personnel/sub-trades to provide resolutions. Cultivated strong inter-personal skills with site personnel, engineers and management.Projects Handled: BCSP – CNG Compressor Station Project, Elenga and Ashuganj Bangladesh.  Control Building; Sub-Station Building; Workshop and Warehouse; Generator Building Compressor Foundations and Shelter; Fire water pond; Pump Foundations and Shelter; Equipment and pipe support foundation; Road and Drainage Show less

      • Architecture/Civil QAQC

        Feb 2014 - Nov 2015
      • Architectural Engineer

        Sept 2012 - Feb 2014
    • Itb construction

      Jun 2016 - Nov 2016
      Architect

       Created and produced cadd designs and modification of details and shop drawings, landscaping, roads, drainage, manholes and as built plans. Created detailed weekly and monthly reports for building and fit-up punch listing works. Provided support to various teams to ensure timely project completion. Identified and addressed any issues and problems encountered during construction. Consistently adhered to quality expectations and standards. Project Handled: EKO Tower 2 - 25 Storey Office and Residential Building Show less

    • Freelance architect

      Dec 2016 - May 2017
      Architect

       Produces plans and 3D designs of residential buildings for clients’ approval. Prepares bill of materials, cost estimates, and specification. Prepares complete set of working drawings needed for building permit and project implementation using Autocad and 3D Max software.Projects Handled: 3 Storey Residential Building, Laguna, Philippines 2 Storey Residential Building, Bulacan, Philippines

    • S.k. engineering

      Jun 2017 - Jun 2019
      Architectural engineer

       Construction and supervision of all residential buildings, guesthouse and VIP houses, administration, hospital, market, school, indoor sports building, and outdoor sports facilities. Construction and supervision of potable and fire waterline system, plumbing and waste water treatment system. Supervision of civil works such as drainage system, manhole, land development, roads, switch yards and fences. Review, check and coordinate interface work with electrical and mechanical department for proper work sequence and scheduling at operation village and powerhouse. Review, design and modify drawing for submittal and approval. Advise subcontractor in site for execution, planning and material delivery. Field quality assurance and quality control; process documents and RFI for inspection and approval. Conducts punchlist and clearing; process building hand-over and client acceptance. Show less

    • D.m. consunji, inc. (dmci)

      Jan 2023 - now
      Qa/qc architect
  • Licenses & Certifications

    • Trade and evaluation test

      Tesda
      Jan 2010
    • Professional board of architecture june 23-25, 2000 rating: 78.80% licensed #: 16229

      Philippine regulatory commission
      Jun 2000
  • Honors & Awards

    • Awarded to Joy Puno
      Commendation of Service Excellence Award HYUNDAI ENGINEERING CONSTRUCTION CO. LTD. Dec 2014