Wayne Mbhalati

Wayne mbhalati

bookmark on deepenrich
location of Wayne MbhalatiLydenburg, Mpumalanga, South Africa
Followers of Wayne Mbhalati2000 followers
  • Timeline

  • About me

    Acting Mining Manager at Dwarsrivier Chrome Mine

  • Education

    • Department of mineral resources

      2019 - 2019
      Mine managers' certificate of competency - metalliferous mining and mineral engineering
    • University of cape town

      2024 - 2024
      Programme in advanced project management: driving organisational success project management cum laude
    • University of the witwatersrand

      2011 - 2014
      Bachelor of science (bsc) in mining engineering mining and mineral engineering

      I have been on the Deans List for the years 2012 to 2014 and received several academic awards for my academic performance whilst studying for my degree.

  • Experience

    • Samancor chrome

      Jan 2015 - Feb 2020

      My current role is a MHSAct Reg 2.15.1 appointee at Doornbosch Mine.I hold the record of achieving the longest ever monthly broken square meters target equating to 18 consecutive months from July 2017 till December 2018. My current role is a MHSAct Reg 2.14.1 read together with MHSAct Reg 2.13.12 appointee at Tweefontein Mine.I demonstrated an achievement in production by achieving the hoisted target tonnes in my section of appointment (Mooigenoeg Section) after only the first month whilst on acting. Currently appointed under Regulation 4.4 of the MHSA (Miner)

      • Shift Supervisor Mining

        Apr 2017 - Feb 2020
      • Acting Mine Overseer

        Jul 2019 - Sept 2019
      • Mining Engineering Graduate in Training

        Jan 2015 - Mar 2017
    • Northam platinum

      Feb 2020 - Sept 2021

      My current role is a MHSAct Reg 2.14.1 read together with MHSAct Reg 2.13.12 appointee at BSU-01 Development Section in charge of decline development including excavating and installation of inline tips and chairlift extensions.Noteworthy achievements:~ 1566 LTI free shifts in Aug 2021 (free since inception) for BSU-01 Development Section~ Achieved a total of 1 743m of primary development vs business plan of 1 310m for FY2021 ended June 2021.~ Achieved record primary development meters of 165.5m vs business plan of 96m for May/June 2021 measuring month.~ Installed and commissioned the very first Chairlift Installation at Booysensdal South Mine in September 2021. Show less

      • Mine Overseer

        Dec 2020 - Sept 2021
      • Acting Mine Overseer

        Jun 2020 - Dec 2020
      • Shift Supervisor

        Feb 2020 - Dec 2020
    • Harmony gold mining company limited

      Sept 2021 - Jul 2022
      Mining manager - target 1 mine

      Currently appointed under MAR 2.6.1 read together with MHSA Section 7(4)Roles & Responsibilities:Managing the Trackless Development and Narrow Reef Mining Sections of the Target 1 Mine value chain which exist to support the Massive Stoping and Sub-Level Open Stoping footprint.1. Narrow Reef Mining distresses on the upper levels of the mine to reduce vertical stresses from +80MPA to below 50MPA for the Trackless Development.2. Trackless Development develops accesses, reef drives and slot cubbies for the Massive Stopes to get into production. - Currently developing the Block 12 Footprint which will give rise to the Sub-Level Open Stoping mining method in September 2022Noteworthy achievements: ~ 8 months FOG / Seismic injury free.~ 206 injury free days on Trackless Development.~ Construction of R242m Man-riding conveyor belt extension to minimize dump truck trammingdistance from 2.5km to 600m.~ Implemented Business Improvement Project in October 2021 which involved the introduction of support using a fully mechanised bolter as opposed to the drill rig.~ Successfully implemented a new support strategy which involves areal coverage at the face resulting in reduction of FOG incidents and a reduction in number of support units required.~ Successfully excavated the Crusher Chamber Excavation & Travelling Way at 291 Level for Crusherand Crusher Dam installation in December 2021. Show less

    • Northam platinum

      Aug 2022 - Jan 2024
      Section manager

      Noteworthy achievements:• Achieved multiple record hoisted tonnes of +267 000t in May, July & Aug 2023 (16 Crews)• Reduced shaft average stoping tramming distances to below 100m - Infrastructure Management• Introduced a Shaft Logistics Role which led to improved underground physical conditions• 2 Million FFS for South Mine in February 2023• 8 Million FFS in November 2022• Saw a ramp up on the new shift system to attain record 236 000t in October 2022• Successfully implemented a new 5x5x5 shift cycle system in September 2022 Show less

    • Dwarsrivier chrome mine

      Mar 2024 - now
      • Acting Mining Manager

        Aug 2024 - now
      • Section Manager

        Mar 2024 - now
  • Licenses & Certifications

    • Mine overseers' certificate of competency - metalliferous

      Department of mineral resources
      Oct 2019
    • Mine managers' certificate of competency - metalliferous

      Department of mineral resources
      Jun 2019
    • Rock breaking underground hard rock: mechanised mining

      Mining qualifications authority
      Dec 2015
  • Honors & Awards

    • Awarded to Wayne Mbhalati
      Supervisory Excellence Samancor Chrome Jun 2019 Achieving monthly square meters call for 18 consecutive months from July 2017 to December 2018
    • Awarded to Wayne Mbhalati
      Dean's List University of the Witwatersrand Nov 2014 The Dean's List recognises the top 10% of students in each degree programme, provided that a minimum average mark of at least 70% is obtained.
    • Awarded to Wayne Mbhalati
      Dean's List University of the Witwatersrand Nov 2013 The Dean's List recognises the top 10% of students in each degree programme, provided that a minimum average mark of at least 70% is obtained.
    • Awarded to Wayne Mbhalati
      Dean's List University of the Witwatersrand Nov 2012 The Dean's List recognises the top 10% of students in each degree programme, provided that a minimum average mark of at least 70% is obtained.