Jonathan Baltazar

Jonathan Baltazar

Stock Controller

Followers of Jonathan Baltazar1 followers
location of Jonathan BaltazarPhilippines

Connect with Jonathan Baltazar to Send Message

Connect

Connect with Jonathan Baltazar to Send Message

Connect
  • Timeline

  • About me

    Process Engineering Manager at FUJI ELECTRIC PHILIPPINES, INC.

  • Education

    • PBMIT (BSU)

      1981 - 1987
      Bachelor’s Degree Mechanical Engineering CGPA 85/100

      Activities and Societies: PSME Member QBL chapter Loyalty Award at PBMIT during Graduation.

  • Experience

    • Shoemart Department Store

      Oct 1987 - Mar 1988
      Stock Controller

      • (Shoemart North Edsa) ( Year 1987– 1988) Assigned as Stock Controller who is responsible for the procurement and control of stock in Philippine Crafts & Warehouse Section.

    • Landmark Department Store

      Nov 1988 - Apr 1989
      Inventory Controller

      • (Landmark Makati) ( Year 1988 – 1989 ) Worked as Inventory Control Supervisor who is responsible for maintaining the manageable stock level in Children’s wear department..

    • Filipinas Micro Circuits Inc. (FMCI)

      Mar 1989 - Jul 1992
      Process Engineer

      • (Filipinas Micro-Circuits Inc / Far East Assembly Corp./ First Magnetic Components Corp.) ( Year 1989 – 1992 ) Worked as Process Technician who ensures that the Standard Operating Procedures being implemented in the line is strictly followed and clearly understood by the operators. Eventually promoted as Process Engineer who is responsible for the End of line Section and then later assigned as Acting Senior Process Engineer for both Front of Line and End of Line Section for Magnetic Head Assembly. Show less

    • Chicago Bridge & Iron Philippines Inc. (CBI)

      Aug 1992 - Oct 1995
      SR.QA Engineer

      Worked as QA Engineer for Welding and NDE /NDT Section responsible for all the review of (NDE) Nondestructive Examination Reports such as the Magnetic Particle Inspection (MPI), Penetrant Test ( PT ), Solution Film Test ( SFT ) and Visual Inspection ( VI ). Also responsible for the material traceability of 8 Oil Storage Tanks and its respective As-built Drawings. Act as the Authorized Customer Representative to interact with Third party inspectors from Lloyds Register of Shipping, ABS Verification, TUV, & SGS Testing & Inspection Company and then became QA Coordinator for the coordination & Supervision of Dossier packages of the 3 Projects. • ( Chicago Bridge & Iron Inc. – CBIEA ) ( Year 1992 – 1994 )(Kuwait Oil Co. Project)) Worked as QA /QC Paint Engineer in the fabrication shop of 12 Oil Storage Tanks for Kuwait Oil Co. Project and is responsible for maintaining the required blasting and painting standards of the Customer. Later assigned as the Authorized Customer Representative to interact with third party paint inspectors from Lloyds Register of Shipping, ABS Verification, & SGS Testing & Inspection Company. Show less

    • Fuji Electric Philippines

      Dec 1995 - Dec 2009

      - To continually enhance and improve the Quality & Environmental Management System applied to Fuji Electric Phils. Inc. (FEPI) as referenced to ISO9001/ISO14001 Standards. - Manage QA Reliability and Test Eng’g.Section for the assurance of products quality, reliability and its warranty.Handles Customer complaints, Nonconformance Reports (NCR) and Corrective Action Reports (CAR) being issued by the customer and the organization. - Manage and maintain compliance to Customer Requirements such as Sony Green Partnership and RoHS Compliance requirement of Customer.- Act as Coordinator /Liaison officer for 3rd Party Certification Body such as TUV SUD, Lloyds Register, etc. - Plan and execute Management Review Meetings as coordinated with QA Director and President. - Plan and do an Internal Audit ( IA ) and act as the Over-all Lead Auditor in the actual implementation of Internal Audits (QMS and EMS). - Plan and do Supplier Audits Local & Overseas and act as the Lead Auditor during the render of actual audit and review.- Do Budget Planning for QA Department that includes manpower, investments, maintenance and other necessary resources. - Manage the Quality Systems Document Control Center for effective Implementation and Control of documents and records. - Manage Stock Assurance (SA) Section for Quality Assurance Sampling Inspection and Testing process of Transistor, Diodes & M-Power 2 Products. - Manage QA Incoming Receiving Inspection Section for the Incoming Inspection of Direct/Raw Materials in conformance with SONY and RoHS requirements. - Manage QA Receiving Incoming Inspection and Quality Assurance inspection and testing of Subcontracted Products from China & Korea. - Act as Radiation Safety Officer (RSO) and Pollution Control Officer (PCO) of Fuji Electric Phils Inc. - Coordinate with all Sections/Department for the Planning and Conduct of Companywide Training related to Quality and Productivity. Show less - To enhance, maintain, and improve the Quality Management System applied to Fuji Electric Phils. Inc. (FEPI) as referenced to ISO9000 Standards. - Manage and maintain Environmental Management System of Fuji Electric Phils. Inc. as referenced to ISO14001: 2004 - Plan and do Management Review Meeting as coordinated with QA Director and President - Make Plan and do an Internal Audit ( IA ) and act as the Over-all Lead Auditor in the actual implementation Internal Audit. - Plan and do Supplier Audits Local & Overseas and act as the Lead Auditor during the render of actual audit and review. - Do Budget Planning for QA Department that includes manpower, investments, maintenance and other necessary resources. - Manage the Quality Systems Document Control Center for effective Implementation and Control of documents and records. - Manage QA Reliability Section for the assurance of products quality, reliability and its warranty. Handles Customer complaints,Nonconformance Reports (NCR) and Corrective Action Reports (CAR) being issued by the customer and the organization. - Manage Stock Assurance (SA) Section for Quality Assurance Sampling Inspection and Testing Process of Transistor, Diodes & M-Power 2 Products. - Manage QA Incoming Receiving Inspection Section for the Incoming Inspection of Direct/Raw Materials in conformance with SONY and RoHS requirements. - Manage QA Receiving Incoming Inspection and Quality Assurance inspection and testing of Subcontracted Products from China & Korea. - Act as one of the Pollution Control Officer (PCO) of Fuji Electric Philippines Inc. - Coordinate with all Sections/Department for the Planning and Conduct of Companywide Training related to Quality and Productivity. - Act as Liason officer for Certification Body such as TUV. Show less

      • QA Manager & Environmental Sr. Deputy Mngr./ QM/EM Manager

        Jun 2003 - Dec 2009
      • QA Asst. Manager / Deputy QMR

        Dec 1995 - May 2003
    • Fuji Electric Phils. Inc.

      Jan 2010 - Apr 2012
      QA Manager & Production Test Manager

      For QA Manager: - Manage and maintain the Quality & Environmental Management System applied to Fuji Electric Phils.Inc.(FEPI) as referenced to the latest version of ISO9001 & ISO14001 Standards. -Manage QA Receiving Incoming Inspection and QA inspection and testing of Subcontracted Products from China & Korea. - Plan and do Supplier Audits Local & Overseas and act as the Lead Auditor during the render of actual Audit and review. - Do Budget Planning for QA Dept that includes manpower, investments, Maint. and other necessary resources.- Act as Coordinator /Liaison officer for 3rd Party Certification Body such as TUV SUD, SGS, etc. - Plan and do an Internal Audit ( IA ) and act as the Over-all Lead Auditor in the actual implementation of Internal Audits (QMS and EMS). - Manage QA Incoming Receiving Inspection Section for the Incoming Inspn. of Direct/Raw Materials in conformance with SONY and RoHS requirements. - Act as Radiation Safety Ofcr. (RSO) and Pollution Control Ofcr. (PCO) of Fuji Electric Phils Inc .For Production Test Manager: - Manage, lead and control the Testing and Final Visual Inspection of production department with more than 350 workforce. - Work closely with the operation teams, utilize resources to ensure that product testing and 100% visual insptn schedules are met. - Responsible for the planning of each employees qualification & trng. relative to Testing & FVI. - Responsible for the provision of action on Customer complaints related to Test /FVI concern and do appropriate trainings, tools, and strategy devt to prevent recurrence of it. - Do periodical appraisal of all workforce under Test/FVI section which includes prod. test/fvi optr. prod. maintenance technicians, Process Engrs. & technicians as well as supv. and up. - Do Budget allocation for necessary Eqmt, spare parts & consumables and also manpower. - Manage Maintenance /Equipment personnel and Process Eng'g. Personnel assigned in Testing and FVI section. Show less

    • FUJI ELECTRIC PHILIPPINES, INC.

      May 2012 - now

      - Responsible for the Yield Improvement/ Defect Rate minimization of the entire Production assembly line of IPM (Front of line to Final Product inspection Process).- Responsible for the Innovation and Process Improvement of all processes involving IPM Production assembly line (From Material Receiving to Final Product inspection Process). - Responsible for the Qualification of New Products, New Materials, New Equipment/Machines, New Methods and New personnel related to Prod. Assembly Line (IPM). - Responsible for the Planning and Implementation of each employees qualification and development training relative to Production Assembly line of IPM.- Do Customer Audit preparation and readiness of IPM Production Assembly Line and act as one of the Representative Auditee of the organization during the course of the Audit.- Make Plan and implement Process Audit (PA) and act as the Over-all Lead Auditor in the actual implementation of Process Audit.- Monitors all issued Non Conformance Report (NCR) from Production Assembly Line of IPM and ensure that those NCR’s were given Corrective / Preventive actions on time.- Coordinate and Collaborate with all concerned departments such as QA, Production, Planning etc. to improve the QCD (Quality, Cost & Delivery) of the IPM products.- Coordinate and Communicate with Fuji Electric Japan Technical Development group for the production of Newly developed product devices of IPM..- Do Budget Planning for Process Eng’g. department that includes manpower, investments, maintenance, expenditures and other necessary resources.- Prepares, Implements and monitors Annual Action Plan in accordance with the Company Wide objective/goal towards its achievement.- Prepares and Reports Process Engineering Monthly Management Review Meeting Report. - Maintain and Control the Departments allocated budget ensuring the financial budget are followed & controlled. Show less - Manage, lead and control the 4M's involving Inteligent Power Module- (IPM) production department - Work closely with the operation teams, utilize resources to ensure that product's assembly target are met with minimum wastage and with maximum Yield. - Responsible for the planning of each employees qualification and skill-up training relative to IPM production assy. - Do periodical Performance appraisal of all workforce under IPM section which includes Prod. IPM optr. up to Asst. Manager. - Do Budget allocation and review for necessary Equipment, spare parts and consumables, Indirect Materials and Manpower. - Do Budget Planning for IPM Production Dept that includes manpower, investments, Maintenance and other necessary resources. - Do Supplier coordination and bargaining in dealing with new orders and cost down activities. - Review and Approve submitted reports for Qualification of new Products, new equipment, new processes and SOP’s. - Review and approves the Monthly production and shipment plan in accordance to manpower distribution, machine capacity/allocation and material availability. - Prepares, Implements and monitors Annual Action Plan in accordance with the Company Wide objective/goal. -Prepares and Reports IPM Production’s Monthly Management Review Meeting Report . - Assists in the management of complaints, serious and untoward incidents and ensure the immediate remedial action is taken and recommendations made are put into place. - Maintain and Control the Departments allocated budget ensuring the financial budget are followed & controlled. - Ensures that the company initiated activities (QMS, EMS, 5S, iQi, ISO Audits Quality and Safety Patrol, Q-Hiyari, etc.) are carried out according to set standards and schedules. - Do Periodical Audit on Suppliers and Companies Internal Audit Activities. Show less

      • Process Engineering Manager

        Aug 2015 - now
      • Production Manager

        May 2012 - now
  • Licenses & Certifications

    • Certified IRCA Lead Auditor for QMS / EMS

      IRCA Global