Khaled Hamza

Khaled Hamza

Junior Electrical Engineer

Followers of Khaled Hamza1000 followers
location of Khaled HamzaMakkah, Saudi Arabia

Connect with Khaled Hamza to Send Message

Connect

Connect with Khaled Hamza to Send Message

Connect
  • Timeline

  • About me

    Sr. Electrical Engineer, MSc, PMP®

  • Education

    • High School (Thanawiyah)

      2000 - 2002
      High School Mathematics and Computer Science 96%
    • Cairo University

      2003 - 2007
      Bachelor’s Degree Faculty of Engineering - Electrical Engineering 72%
    • Cairo University

      2012 - 2016
      Master's degree Renewable Power Generation - Wind Energy Conversion System (WECS) GPA (3.7)

      الأنشطة والجمعيات:Doubly Fed Induction Generator (DFIG), power generation control, unbalance grid voltage conditions, vector control, Wind Energy Conversion System (WECS) With increasing global great concern over greenhouse gas emissions and their harmful effects on environment, huge number of wind turbines are recently connected to electrical grids. Nowadays, Egypt has continuous development of wind energy projects; it makes a great effort at Gulf of Suez area especially in Al-Zafarana district. This study focuses on studying the dynamic performance of the 5th phase of Al-Zafarana wind farm, which is made of 100 Gamesa G52/850kW Doubly Fed Induction Generator… عرض المزيد With increasing global great concern over greenhouse gas emissions and their harmful effects on environment, huge number of wind turbines are recently connected to electrical grids. Nowadays, Egypt has continuous development of wind energy projects; it makes a great effort at Gulf of Suez area especially in Al-Zafarana district. This study focuses on studying the dynamic performance of the 5th phase of Al-Zafarana wind farm, which is made of 100 Gamesa G52/850kW Doubly Fed Induction Generator (DFIG) machines, using Digsilent/PowerFactory simulation tool as an advanced simulation package. As DFIG is currently one of the most common types employed for Wind Energy Conversion System (WECS), the study also implements a dynamic model for 850kW DFIG machine based WECS in Matlab/Simulink environment. A dual reference frame control strategy is applied here to improve the dynamic system performance during balanced and unbalanced grid voltage conditions. عرض أقل

  • Experience

    • PETROKIMA Engineering and Contracting

      Dec 2007 - Apr 2010
      Junior Electrical Engineer

      PETROKIMA is a privately-owned company specified in producing Electrical Distribution & control Panels ,Distribution panels for motor control center MCC , and control panels LCP for Building Automation technology for HVAC - Security - monitoring systems ( BMS TECHNOLOGY in building and Factories ) ., Duties included:- Design motor control center equipments ( CB, Contactors, Relays, timers ..) for MCC Panels.- Provide wiring schematic diagrams for motor starting method ( DOL , Star -Delta ,..).- Design local control panels equipments.- Provide the detailed DWGs' for MCC and LCP. عرض أقل

    • Cairo Electricity Production Company

      Apr 2010 - May 2014
      Operation Commissioning Engineer

      CEPC is a governmental facility for Electricity Generation. Cairo West is a Thermal Steam Power Station. Its capacity is about 1.4 GW. My Own responsibility includes two units (2*350 MW); It is controlled & operated by YOKOGAWA Systems DCS. Gas & Oil fire boilers make HITACHI BABCOCK COMPANY LTD @ 1024 TPH, 192 kg/cm2 & 5400C. Multi stages condensing Turbine Generator set make MITSUBISHI Heavy Industries Co.I participated in the construction and commissioning phases of the two new units. Key Responsibilities include;1. Adjust controls to generate specified electrical power, or to regulate the flow of power between generating stations and substations.2. Control and maintain auxiliary equipment, such as pumps, fans, compressors, condensers, feedwater heaters, filters, to supply water, fuel, lubricants, air, and auxiliary power.3. Start or stop generators, auxiliary pumping equipment, turbines, and other power plant equipment, and connect or disconnect equipment from circuits. عرض أقل

    • Advanced Hi-Tech for Contracting

      Apr 2014 - Jun 2016
      Sr. Electrical Coordinator

      HiTech Contracting Co. is working for Saudi Binladin Group (SBG) to coordinate and manage special packages of Holy Haram Expansion Mega projects, such as (Prayer areas LED Lighting, Laser System, PV Covers, Haram Façade Doors, and Sliding Domes). Key Responsibilities include;1. Provide overall coordination and technical management for the MEP works packages from development through installation, testing, commissioning, and final acceptance by client.2. Recommend alternative engineering solutions to management to meet the project needs.3. Design, develop, modify and evaluate systems, processes, or facilities to support improving projects objectives.4. Review material submittals' specifications to ensure they adhere to the standards.5. Conduct site inspections to ensure adherence to engineering standards and specifications.6. Review and comment on all MEP engineering related work performed by engineering consultants7. Review all project MEP field reports on a monthly basis.8. Coordinate with office staff, consultants, contractors and other personnel through scheduled meetings. عرض أقل

    • Atom Holding

      Jun 2016 - now
      Sr. Electrical Engineer

      Atom Holding Solutions is specialized in electromechanical works for mega projects such as Mecca Clock Tower, and Shamiyah Holy Haram Expansion project. Atom Solutions is currently managing the MEP works for special projects in Holy Haram for high profile companies including RIVA GmbH, PCT, STRP GmbH.Key Responsibilities include;1. Review, Coordination and administration of MEP related materials, systems and shop drawings submittals.2. Validate design issues related to MEP and suggest alternative solutions.3. Day-to-day management of the site, including supervising and monitoring the site labour force and the work of any subcontractors.4. Inspect work sites, monitor project schedule and check project plans and drawings to verify authenticity of office plans.5. Perform inspection with the project consultant and prepare documents for entire contract work projects.6. Log and post all MEP changes and as-built information on field drawings.7. Assist in the testing and commissioning of MEP equipment.8. Provide assistance to project manager and supervise office engineering construction.9. Prepare project records with details such as field progress, field conditions, equipment use and corrective actions. عرض أقل

  • Licenses & Certifications

    • Project Management Professional (PMP)®

      Project Management Institute
      Jan 2018
      View certificate certificate