KASHIF MAHMOOD

KASHIF MAHMOOD

Assistant Manager Instrumentation

Followers of KASHIF MAHMOOD1000 followers
location of KASHIF MAHMOODDoha, Qatar

Connect with KASHIF MAHMOOD to Send Message

Connect

Connect with KASHIF MAHMOOD to Send Message

Connect
  • Timeline

  • About me

    Instrumentation / PLC / DCS / SCADA / ELV – Manager, C.Eng (UK), MME Qatar (Grade A), SEC ( Saudi Engg Council)

  • Education

    • The Boston College of Computer and Management Sciences

      1998 - 1999
      Computer Diploma Course Computer Science A
    • Mehran University of Engineering and Technology, Pakistan

      2001 - 2005
      Electronics and Telecommunication Engineering (2001–2005)
    • University of Peshawar

      1996 - 1998
      B.Sc (Computer Science) Maths, Computer, Physics
    • Mehran University of Engineering and Technology

      2001 - 2005
      Bachelor of Engineering - BE Electronics & Telecommunication First Class
  • Experience

    • Maple Leaf Limited

      Jan 2006 - Aug 2008
      Assistant Manager Instrumentation

      Assigned Projects:1. Design & Built of New Production Line (6300 tons per day (TPD)2. Daily maintenance and operation of plant instrumentation equipmentResponsibilities: I designed the plant IFC drawings as per project requirements, specifications, system integration for PLC, process control automation, and submitted to the Consultant for approval. I was responsible for reviewing and approving the contractor's submittals, technical queries, Field change documents and other technical documents including Drawings and As-Builts. I lead the testing and commissioning, and configuration of instruments as per ISA and BS standard for cables routing, cable terminations, cables Loop testing, instrument calibration PLC /DCS networking and programming and HMI system configuration. I managed the daily maintenance activities of the plant instrumentation and control equipment. I was responsible for programming of Siemens PLCs S7-300 and S7-200 as per plant requirements, implementing preventive maintenance/Plant Shutdown/Plant breakdown activities, Issuing Permit to work (PTW)/Closing Procedures, Safety Procedures, Preparation of Spare part lists & Performing Quality Control Procedures etc. I was always in Coordination with contractors, engineers, and other stakeholders involved in foundation works and automation installation. It was my responsibility to Ensure require permits and licenses are in place prior to the start of the specific work at site. I arranged the training plan for trainee engineers and technicians. I lead a team 2 Engineers, 4 Foreman and 10 Technicians. I reported to the Maintenance Manager. Sound knowledge of field instrumentation equipment and accessories required for process measurement such as PT, FT, LT, TT, JBs, control, and shutdown system. Sound knowledge of control systems such as PLC,RTU, SCADA, communication protocols as Mod bus ,Profibus, Profi Net, HART, Ethernet (TCP/IP), RS-485, RS-232,fiber optics, OLM etc. Show less

    • Askari Limited, Wah, Pakistan

      Aug 2007 - Apr 2009
      Assistant Manager Instrumentation

      Assigned Projects: Daily maintenance and operation of plant instrumentation equipment.Responsibilities: I reviewed the plant IFC drawings and made necessary technical amendments required based on the project requirements, specifications, system integration for PLC, process control (ISA106, BS 6739), Thermocouples (BS 4397), Quality (ISO 9000), and submitted to the Consultant for approval. I lead the testing and commissioning, and configuration of instruments as per ISA and BS standard for cables routing, cable terminations, cables Loop testing, instrument calibration PLC /DCS networking and programmingand HMI system configuration. I managed the daily maintenance activities of the plant instrumentation and control equipment. I was responsible for programming of Siemens PLCs S7-300 and S7-200 as per plant requirements, implementing preventive maintenance/Plant Shutdown/Plant breakdown activities, Issuing Permit to work (PTW)/Closing Procedures, Safety Procedures, Preparation of Spare part lists & Performing Quality Control Procedures etc. I arranged the training plan for trainee engineers and technicians. I lead a team 3 Engineers, 5 Foreman and 11 Technicians. Show less

    • Northern Region Company (NRCC)

      Apr 2009 - Jun 2022
      Chief Automation Engineer

      Assigned Projects: 1. Design & Built of new Production Line # 2 (3000 tons per day (TPD)2. Design & Built of Office buildings, and School buildings.3. Design & Built of Residential housing Villas4. Design & Built of new Sand Mill for Raw Mill5. Design & Built of new Palletizer Machine for Packing plant6. Setup of integrated SCADA WinCC OA in Plant for combined utility7. Design & Built of Oil well cement test equipmentResponsibilities: I was the Subject Matter Expert (SME) on Instrumentation engineering PLC/DCS/ ELV systems. I designed Instrumentation engineering control drawings such as Process Flow Drawing, Network Architecture, Schematic Diagram (SD), Control Panels Drawing, Logic Diagram, Cable Scheduling , Input/output (I/O) List Drawing, interlock drawing for control equipment and specifications. Reviewing the ICA design including system architectures, control philosophy, specifications, FDS, reports, data sheets, SCADA/PLC IO’s, P&ID, Layouts and schematics, block diagram according to project specifications as per ISA and BS Construction Standard. Interface with key stakeholders and consultants for technical support in the design development. I handled the procurement, techno-commercial evaluation of the quotations received from the suppliers and approve orders to the purchase department. Reviewing submittals, materials, designs, calculations, installation methods and recommend action required by the Contractor. I was responsible for the SCADA system that controlled and monitored MV switch gears, LV incoming feeder, PLCs, RTUs, IO Modules, MCC and Controllers and trip units’ mechanism. I managed the planning of modifications, installation, and programming to facilitate efficient and smooth plant activities. Coordinate with other disciplines, consultants, and attend project meetings from time to time. I was responsible for personal safety safe working practices both field activities and design . Show less

    • Parsons Corporation

      Jul 2022 - now
      ELV/ Instrumentation/ SCADA Manager, Lusail City Development, Qatar

      Assigned Projects: 1. Commercial Boulevard District2. Lusail Plaza Towers3. Marina District4. FoxHills District5. Huzoom Residential Villas District6. Lusail Overall Smart City system7. Lusail Overall MOI Security systemResponsibilities: I am responsible for design development in compliance with Client requirements, local and international standards of following disciplines - Instrumentation and SCADA (ISA106), Intelligent Transport System (QHDM Vol.3 Part 17), Telecom (TIA 942, IEEE 802, Qatar Telecom), Security Surveillance Department (BS EN 62075, Qatar MOI SSD), Extra LowVoltage System such as Fire Alarm (NFPA 72), Smart city management (ISA RP60), and Broadcasting components inside Media hydrants (BS EN 60793). I coordinate and manage the design review of the design consultant’s hazard and risk logs. I engage in design development beginning from project feasibility studies, Concept design, Schematic design, Detailed design, instrument hook-up drawing ,Tender and Issued for Construction. Design submissions include scope of works (SoW), specifications, drawings, and bill of quantities (BoQ). I am responsible for technical review and evaluation of Tender submissions. I review shop-drawings, material submittals, as-built drawings submitted by the Contractor against the Contract drawings, and applicable local and international standards, and best practices. I attend weekly meetings with the Project Contractor and Design Consultants, to discuss progress, compliance with Client requirements, Contracts, safety standards, and quality. I prepare response to Request for Information (RFIs) from the Contractor, monthly progress reports, minutes of meetings etc. I review and validate design calculations and analysis such as voltage drop calculations for cable sizing, electrical single line diagrams, transformer sizing and electrical network architecture. I lead a team 2 Engineers and 3 CAD Technicians. I report to Technical Design Director. Show less

  • Licenses & Certifications

    • Registered Electronics Engineering

      Saudi Council of Engineers | الهيئة السعودية للمهندسين
      Apr 2011
    • Registered Electronics Engineer

      Pakistan Engineering Council
      Oct 2006
    • Chartered Engineer (UK)

      Institution of Engineering and Technology (IET)
      Jul 2024
    • Grade A Engineer - Qatar MME

      Ministry of Municipality and Environment, Qatar
      Dec 2022