    Nov 2009 - Aug 2017

    Foreman grade 1(Electrical, Instrument and Control)

    No.1 Steel Mill Myingyan
    Aug 2017 - now

    Senior Instrument Technician

    Sembcorp Myingyan Power Plant
    Current Company
    Apr 2023 - now

    Maintenance Engineer (Instrumentation)

    Sembcorp Industries Ltd
  • About me

    Maintenance Engineer (instrumentation)at Sembcorp Myingyan Power Plant

  • Education

    • Technological university (meiktila)

      -
      Bachelor of engineering - be electronics and communication q
  • Experience

    • No.1 steel mill myingyan

      Nov 2009 - Aug 2017
      Foreman grade 1(electrical, instrument and control)

      Supervisor for problem solving field instruments to PLC/MCC Control/Automation /PCC panel/LVD Panel/ Medium Voltage and Low Voltage online diagram in our industry by using PLC signal- Digital Input /Digital Output cards (position switch, limit switch, solenoid valve etc) and Analog Input /Output Cards for analogue instrument such as Control Valve, RTD, Thermocouple and Transmitters, etc. in DP/DP or DP/PA circuit.• Supervisor for cable way installation, cable pulling, panels installation, switchgear & transformer installation and all electrical equipment, sensors, and transmitter installation. • Carried out day-day duties accurately and efficiently. • Managed quality assurance program, including on-site evaluations, internal audits, and customer surveys. • Performed in-depth electrical acceptance testing of completed hardware, including continuity and high potentialisolation testing. • Administered both energized and de-energized testing on Created, aligned, and optimized electrical instrumentation and testing equipment. • Completed in-depth performance tests of parts and systems undergoing design optimization in simulated environments. • Calibration, Testing and Commissioning all types of Field instrumentation including Temperature, Flow, Level, Pressure Transmitters, Pneumatic and mechanical control equipment, Switches, Actuated valves, and Fire Detection System • Preparing all the test reports and documentation Show less

    • Sembcorp myingyan power plant

      Aug 2017 - now
      Senior instrument technician

      GE Frame 6F.03 Gas Turbine Installation, Testing & Commissioning together with GE Team in Myingyan, Myanmar Project • BHGE Steam Turbine ST/TU SNC 1-5 (HP) & SC4-31 (LP) Installation, Testing & Commissioning together with BH Team in Myingyan, Myanmar Project • Responsible for reliability and availability of the instrumentation and control system (GE Mark Vie, ABB S Plus DCS, Siemens S7-400/1200 PLC and U-Tah UCS SCADA, All Instruments and Analyzers)• Performed duties in accordance with all applicable standards, policies, and regulatory guidelines to promote a safe working environment. • Prepare MS,RA,PPMS and(QCP) as per O&M Manual.• Prepare plan for BI outages, HGPI outageactivities and spare parts.• Prepare and perform smoothly and timely execution of all the shutdown/schedule maintenance activities. • Maintain and record all maintenance activities. • Conduct daily and routine maintenance tasks. • Troubleshoot and improve all the instrumentation and control system (GE Mark VIe. ABB S Plus DCS, Siemens S7-400/1200 PLC and U-Tah UCS SCADA) • Prepare plant trip matrix and perform protection sequence tests. • Performing preventive, predictive, and corrective maintenance at all Instruments as Transmitters (PT/TT/FT/LT), Valves (CV/AOV), Analyzers.(PH/Conductivity/Chlorine/Turbidity/Sodium/Silica/ Gas Chromatograph/CEMS) and control equipment specification, safety, and quality requirement .• Reviewed and support to Engineer for spare part list • Record spare part withdraw in monthly Show less

    • Sembcorp industries ltd

      Apr 2023 - now
      Maintenance engineer (instrumentation)

      GE Frame 6F.03 Gas Turbine Installation, Testing & Commissioning together with GE Team in Myingyan, Myanmar Project • BHGE Steam Turbine ST/TU SNC 1-5 (HP) & SC4-31 (LP) Installation, Testing & Commissioning together with BH Team in Myingyan, Myanmar Project • Responsible for reliability and availability of the instrumentation and control system (GE Mark Vie, ABB S Plus DCS, Siemens S7-400/1200 PLC and U-Tah UCS SCADA, All Instruments and Analyzers)• Performed duties in accordance with all applicable standards, policies, and regulatory guidelines to promote a safe working environment. • Prepare for Maintenance Philosophy Yearly• Prepare MS,RA,PPMS and(QCP) as per O&M Manual.• Prepare plan for BI outages, HGPI outage and MI outage activities and spare parts.• Prepare and perform smoothly and timely execution of all the shutdown/schedule maintenance activities. • Maintain and record all maintenance activities. • Conduct daily and routine maintenance tasks. • Troubleshoot and improve all the instrumentation and control system (GE Mark VIe. ABB S Plus DCS, Siemens S7-400/1200 PLC and U-Tah UCS SCADA) • Prepare plant trip matrix and perform protection sequence tests. • Performing preventive, predictive, and corrective maintenance at all Instruments as Transmitters (PT/TT/FT/LT), Valves (CV/AOV), Analyzers.(PH/Conductivity/Chlorine/Turbidity/Sodium/Silica/ Gas Chromatograph/CEMS) and control. equipment.• Spare Parts Managements and Liaising with purchasing department for ordering spare part and consumable as well as maintenance contract. (PR/PO Process and Technical review)• Record spare part withdraw in monthly.• Control the Department Budget and updated recordsMonthly.• Marking the department KPI• Supervise the team for daily maintenance tasks.To conduct root cause failure analysis (RCA) for failure• Demonstration and high performance of make competent decisions in emergency situations. Show less