Ravi Chauhaan

Ravi Chauhaan

Sargent Mejor

Followers of Ravi Chauhaan24000 followers
location of Ravi ChauhaanBharuch, Gujarat, India

Connect with Ravi Chauhaan to Send Message

Connect

Connect with Ravi Chauhaan to Send Message

Connect
  • Timeline

  • About me

    Electrical Operation Department || Electrical Project & Commissioning Engineer || Visionary Leader || Engineering || Cathodic Protection CP-ll, CP-lll || DEE+BEE+M-Tech(EPS) Silver Medal🥈Uni lev.+Ph-D EPS UP-Coming..

  • Education

    • BhavaShihaji Technical HighSchool

      2008 - 2010
      SSC Technical Trend ENGINEERING

      Activities and Societies: 1. NCC Cadet / Sergeant Mejor in Army Wing 2. Gold Medal in Rifle Shooting in CATC Camp June 2008 1st Class with Distinction

    • Bhabha college of Engineering

      2018 - 2021
      Bachelor of Engineering B-Tech Electrical Engineering

      Activities and societies: horse rider & racer, debate, MIME, Technical event organiser (REALM OF CIRCUITS), decoration team, academic projects SPOURAL'18 Interdepartmental Horse Racing player league secured 3 position on the table HORSE PLNGE_ 2020 Debate MIME on Kerala floods COGNIZANCE'19 Organised a technical event named REALM OF CIRCUITS as a coordinator of the event, ideated the design of the event on circuit based treasure hunt and their hardware implementation and the decoration of the… Show more Activities and societies: horse rider & racer, debate, MIME, Technical event organiser (REALM OF CIRCUITS), decoration team, academic projects SPOURAL'18 Interdepartmental Horse Racing player league secured 3 position on the table HORSE PLNGE_ 2020 Debate MIME on Kerala floods COGNIZANCE'19 Organised a technical event named REALM OF CIRCUITS as a coordinator of the event, ideated the design of the event on circuit based treasure hunt and their hardware implementation and the decoration of the department. FINAL YEAR PROJECT CUSTOM MADE MHO RELAY AND DISTANCE PROTECTION SCHEME The project is based on the concept of MHO relay whose characteristics correspond to an ordinary mho relay where the ZONE wise fault detection scheme is implemented and the scheme operates of in zone faults and trips the breaker. 'description of minor projects in the resume' Show less

    • RKDF UNIVERSITY

      2021 - 2024
      Master of Technology M-Tech Electrical Power systems 78.90%🥈 Silver Medal with 2nd Rank in University Level

      Load flow studies for industrial, utility system and traction systems-Short circuit studies and hand calculation -Motor starting studies&hand calculation. -Relay co - ordination studies, unit protection, failure analysis, study on inter - tripping scheme. -Transient stability studies, load shedding and grid islanding studies -Transformer sizing calculations - Arc Flash studies -Softwares used : MiPower - 10.1

    • RK University

      2010 - 2014
      Diploma Electrical Engineering Electrical Engineering
  • Experience

    • NATIONAL CADET CORPS - India

      May 2007 - Jun 2010
      Sargent Mejor

      1. NCC Cadet / Sergeant Mejor in Army Wing 2. Gold Medal in Rifle Shooting in CATC Camp June 2008

    • UPL

      Mar 2013 - Mar 2015
      Junior Electrical Engineer

      I had worked as a junior engineer in United phosphorus limited 1 (Production of agrochemical product) and no. 5 (production of costic soda).working payroll in United Phosphorus Limited. company. Operation & maintenance of 11kv & 440v line panel, Total plant maintenance, electrical & equipment preventive maintenance,switchgear, sensor, PLC, VFD, Compressor maintenance, troubleshooting, Sizing, laying & routing of cable, comply with all standards of installation, operation & maintenance, Continous improvement in SOP'S (Standard operation & maintenance) new project handling, documentation etc. Show less

    • Gujarat Energy Transmission Corporation Limited (GETCO)

      Apr 2015 - May 2017
      Junior Engineer

      Working as Diploma Apprentice JE Electrical Maintenance of 220 MW Thermal Power Stations Sikka. Working with ESP,11 Kv, 220kv,400kv Switch yard.Maintenance of HT, LT motors, breakers. Overhauling & testing of transformer DoneAnnual Maintenance of 220 MW Thermal power station sikka. Erection & commissioning of 245kv SF6 circuit breaker.Trouble -Shootings of Electrical Fault.

    • Reliance Industries Limited

      May 2017 - May 2018
      Electrical Engineer

      My responsibility and all I learnt during job is described as belowJob Responsibility : ⚡Responsible for MIS of electrical work. Make monthly consumption report. ⚡Spares procurement & responsible for plant availability.⚡To attend safety committee meeting and compete all concern issues. ⚡Keep motivated team and improve skill of contractors and employee. ⚡Responsible for safe work and work place safety. ⚡Plan PSSR after readiness of equipment before charging.⚡Audit for contractor working area and plant electrical safety⚡Complete all work before target date for charging of equipment.⚡Coordinate with OEM & plan visit of them for commissioning of equipment.⚡Conditioning monitoring of running equipment. ⚡Responsible approval from Govt. Authority for different work such as charging of equipment, parallel operation of STG & Grid. ⚡Responsible for HOTO after final charging or completion of services.I learnt a lot about project & as well as maintenance of equipment .most important is team work of this company is very good.Equipment asset management system is very effective.Learn a lot of things...like a what is the meaning of job?and How to manage with people? and learn a lot of things which can to useful me in my future.Mainly focused on safety and production.Free to give any such a ideas for improving safety and production.Working as one team and ownership mind . Learnings various training and various plant start up and shutdown job. Handling various types of oil and gas products.Excellent experience of learning and development.Lot of initiatives to get going. Many opportunity to function in existing and new projects to get fully aligned.Electrical EngineerRavi Chauhan. Show less

    • Gujarat State Petronet Limited

      May 2018 - May 2019
      Electrical Project Engineer

      Project Installation,supervision,testing and commissioning of new cathodic protection system for underground facilities and storage tank, gas transmission pipe line, gas processing plant, submerged pipelines and marine jetty. •Investigation of corrosion problem and failures, perform root cause failure analysis and suggest solutions for corrosion control and prevention.•Conduct field survey, site specific field test, analyze field data and generated recommendations.•Perform engineering design, specification preparation, corrosion mitigation implementation, testing and trouble-shooting, design and test CP and AC grounding system including galvanic and impressed current CP system.•Work closely with clients, contractors and sub-contractors, vendors and inspects quality on project specifications.Perform cathodic protection monitoring of gas transmission pipelines, distribution pipelines, chemical plant, power plant storage tank, submerged pipelines, marine jetty.•Responsible for conducting annual survey, repair projects, troubleshooting and adjustment of transformer rectifier.•Investigate the effects of stray current and install facilities to mitigate AC corrosion and DC interference.•Install and test rectifiers including troubleshooting and identifying component failure.•Perform anode ground beds installation for impressed current and sacrificial anode system.•Conduct for soil investigation test, current requirement test, electrical isolation test, pipe to shorted casing test, IR drop test, closed interval potential survey, direct current voltage gradient survey.•Install buried coupons in the vicinity of the structure to replicate a coating holiday.Ravi Chauhan (GSPL)Project Engineer Show less

    • Deepak Group Co

      May 2019 - Sept 2021
      Electrical Supervisor

      I have DEE+ BEE total 08+ years of experience in Oil & Gas/Petrochemical, Chemical refinery complex. Mainly worked for mega EPC project by handling the project from engineering phase to commissioning, Played a lead role in various functions such as Core engineering, Proposal & estimation, Procurement, Project Execution by planning & control, Field construction&commissioning. Played a Lead role in Reliable operation of plant, Managing Integrity of equipment, Technical solutions on troubleshooting, Expertise in reliability of electrical equipment. Skills: EPC Project Co-Ordination • Project Planning & Execution • Resources management skills. CAPEX & OPEX Budget Preparation • Procurement & Contracts • Inventory Management & Controls Certificates : • Project Management Professional (PMP) • Microsoft Project 2019 for progress review • Project Management Procurement • Operational Management Systems OMS • SAP material management • CFA & CSM course by DUPONT Show less

    • Aarti Industries Ltd.

      Sept 2021 - now
      Electrical Engineer

      M-Tech(EPS)+B.E Electrical+DEE with almost 10+ years of my diverse experience in Operations & Maintenance, Reliability engineering, Installation & Commissioning, Project Execution & Management, Safety Management and Cross-functional Coordination. Presently associated with Aarti Industries Ltd., Jhagadia, Gujarat as Engineering -Electrical, Chemical Division & Plant Gold,Ruby, Central team's Plant. Summary of my experience and key accomplishments across my career : 💡 Skilled in maintenance & testing of transformers, LT/HT motors, HV/LV circuit-breakers and Protection and control philosophy of motors & transformers. 💡Conversant in AC UPS system, Battery chargers and VRLA type Battery bank, No load & Load trail of DG set, Siemens make 7SJ series in fault data downloading, change/ read CFC logic & testing. 💡Preparation of HITRA (Hazard Identification & Task Risk Assessment) for all Operational & Maintenance activities and execution by strict adherence to Cow (control of work) & PTW (permit to work) procedures, all safety policies, precautionary measures, rules and regulations laid down by the management are implemented & followed. 💡Contribution in MOCs (management of change) to be carried out for change in existing system for improve reliability, safety, increase revenue of organization and Creation of maintenance plans and task lists for excellent data processing and reliability improvements as well as defining and monitoring KPIs. 💡Having knowledge of SAP maintenance module, planning, scheduling and permit systems. Show less

  • Licenses & Certifications

    • Energy & Petrochemical Department Gujarat State board

      Electrical Supervisor licencing Board
      Jun 2014
    • Electrical Supervisor Licences

      Government of Gujarat
      Apr 2014
    • COASTAL SECURITY AWARENESS CAMP

      NATIONAL CADET CORPS - India
      Jun 2010
    • ACHIVE 'A' CERTIFICATIONS IN NCC ARMY WING

      NATIONAL CADET CORPS - India
      Aug 2009
    • Army wing Annual Training Camp

      NATIONAL CADET CORPS - India
      Dec 2008
  • Volunteer Experience

    • Sarjeant Major (SGM)

      Issued by NATIONAL CADET CORPS - India on May 2007
      NATIONAL CADET CORPS - IndiaAssociated with Ravi Chauhaan