Sayed Shoeb, PMP®

Sayed Shoeb, PMP®

Installation Engineer

Followers of Sayed Shoeb, PMP®247 followers
location of Sayed Shoeb, PMP®Montreal, Quebec, Canada

Connect with Sayed Shoeb, PMP® to Send Message

Connect

Connect with Sayed Shoeb, PMP® to Send Message

Connect
  • Timeline

  • About me

    Elevator Professional | PMI-PMP| Project Management | Digital Marketing

  • Education

    • Tav College

      2021 - 2023
      Post Graduation Project Management & Internet Marketing A+
  • Experience

    • Mitsubishi Elevator India Pvt. Ltd.

      Jan 2015 - Jun 2018
      Installation Engineer

      Planning and design: Working closely with architects, builders, and developers to plan and design the installation of lifts in new buildings, and analyze building blueprints, identify potential installation challenges, and develop installation plans that meet safety standards.Equipment installation: I was responsible for the installation of lift equipment, including motors, cables, control systems, and safety features ensuring that all equipment is properly installed, calibrated, and tested before the lift is put into service.Maintenance and repairs: I was also responsible for the maintenance and repair of lift equipment, and performing routine maintenance to keep the equipment in good working order and troubleshoot and repair any malfunctions that may arise.Compliance with safety standards: I was responsible for ensuring that all equipment is installed and maintained in compliance with these standards to ensure the safety of building occupants.Customer service: Working closely with customers to ensure that their needs are met, answering questions, providing guidance, and ensuring that installations and repairs are completed to the customer's satisfaction.Project management: I was responsible for managing lift installation projects from start to finish. This includes coordinating with other contractors, managing schedules, and ensuring that the project is completed on time and within budget. Show less

    • Fujitec India Private Limited

      Jul 2018 - Dec 2018
      Sr.Engineer--Installation.

      *) Responsible for developing project plans, timelines, and budgets. *) Working closely with other members of the project team, such as project managers and contractors, to ensure that projects are completed on time, within budget, and to the required specifications.*) Responsible for designing and testing systems, analyzing data, and troubleshooting problems.*)Resource Management:- Responsible for managing resources such as personnel, equipment, and materials to ensure that projects are completed efficiently and within budget.*) Quality Control: Responsible for ensuring that the work done on a project meets the required quality standards which include inspection of work sites, review of engineering plans, and performing other quality control tasks.*) Communication: Responsible for working with a variety of stakeholders, including clients, contractors, and other engineers, and conveying technical information to non-technical stakeholders in a clear and concise manner.*) Risk Management: Responsible for identifying and mitigating risks associated with the project, and anticipating potential problems, and developing contingency plans to minimize the impact on the project.Overall, I was responsible for ensuring that projects are completed successfully, on time, and within budget. Show less

    • KONE ELEVATOR INDIA PRIVATE LIMITED

      Dec 2018 - May 2021
      Senior Engineer -Major Projects

      *)Implement customer and Company requirements for quality, performance reliability and passenger safety for each location under my supervision • *)Ensure exceptional quality standards, training and performance of field personnel •*) Manage hourly field employees through providing mentor ship, guidance and constructive feedback to promote employee development *)Make sound judgements as related to motivation, training and work assignments for all employees within their assigned responsibility, while at the same time, adjusting manpower to minimum level and meeting and or exceeding customer requirements •*) Coach hourly field employees Company’s methods of quality, productivity and safety • *)Monitor the work of all hourly field employees from both a quantitative and qualitative point of view • *)Review of time tickets for accuracy and maintain vacation schedules • *)Persuade field employees to follow practices and procedures that will foster teamwork and improve quality and productivity. Show less

    • Student

      Sept 2021 - Oct 2023
      Project Management Student

      Recently Graduated

  • Licenses & Certifications

    • Project Management Professional (PMP)®

      Project Management Institute
      Oct 2023
      View certificate certificate
    • Project Management Fundamentals (KONE ELEVATOR's)

      International Institute for Learning
      Jan 2020
    • Diplomate in ERP/PM tools (PrimaveraP6).

      CADD Centre Training Services Private Limited
      Oct 2015