Julia Dawson

Julia Dawson

Principal Engineer

Followers of Julia Dawson208 followers
location of Julia DawsonBatavia, Illinois, United States

Connect with Julia Dawson to Send Message

Connect

Connect with Julia Dawson to Send Message

Connect
  • Timeline

  • About me

    Associate Project Director at The Joint Commission

  • Education

    • University of Illinois at Urbana-Champaign

      2019 - 2023
      Masters Certificate in Data Science Mathematics and Computer Science

      GPA: 3.83 (Note: Certificate is identical to MCS DS degree)

    • DePaul University

      1985 - 1988
      Master’s Degree Computer Science
    • University of Illinois Urbana-Champaign

      1978 - 1983
      Bachelor of Science (B.S.) Electrical and Electronics Engineering and Physiology
    • Northern Illinois University

      2005 - 2008
      Bachelor’s Degree Mathematics
  • Experience

    • ComEd

      Jul 1983 - Feb 2003
      Principal Engineer

      Electrical Monitor System to accept remote control of generating unit output by regional power company.Developed and maintained software to: Schedule maintenance of substation equipment; Determine switch status and connectivity of power system; Monitor substation equipment for overload conditions.

    • Health Care Services Corporation

      Jan 2012 - Oct 2016
      Systems Analyst - Mainframe Capacity and Performance

      VBA, DBConnect).Maintain and monitor the Workload Manager Policy: The prioritization of workloads is monitored and adjusted as workloads change. New or unclassified work is assigned an importance level and added to the policy. This prioritization involves collaboration with many other groups such as DBAs, CICs, z/OS and application SMAs. Developed a report to detect unclassified DDF (distributed data facility) workload which are often a source of problems in performance. Developed drill down workload reports useful for investigating changes in resource use. Monitor workloads and report on resource consumption to management and other groups. Project an plan Mainframe Capacity requirements: The workload growth and use patterns are monitored and reported to management; project resources needs based upon this growth. Timely detection of changes in resource use aid in identification of performance problems or new capacity requirements. Support: attend Technical Bridges and investigate/troubleshoot incidents.Project lead on Batch Resource Routing project: Many batch jobs are routed to only one LPAR. Added Scheduling Environments which indicate the resources available on each LPAR. Revised job classes and initiator mapping. These changes will allow jobs to run on any LPAR that has the necessary resources and will reduce job wait times. Show less

    • Evolent

      Oct 2016 - Nov 2017
      Data Analyst
    • The Joint Commission

      Dec 2017 - now
      Associate Project Director
  • Licenses & Certifications