Bimantara Satriyo

Bimantara Satriyo

Student Internship

Followers of Bimantara Satriyo540 followers
location of Bimantara SatriyoCilegon, Banten, Indonesia

Connect with Bimantara Satriyo to Send Message

Connect

Connect with Bimantara Satriyo to Send Message

Connect
  • Timeline

  • About me

    Performance Engineer at Supercritical Coal-Fired Power Plant 1x660 MW | Optimizer of Plant Performance and Energy Commercialization

  • Education

    • SMA Negeri 1 Blitar

      -
      Mathematics and Natural Science
    • Politeknik Elektronika Negeri Surabaya

      2013 - 2017
      Bachelor of Applied Science (BASc) Power Plant Engineering (Energy Conversion)

      Activities and Societies: Chairman of Student's Union of Power Plant Engineering Power Plant Engineering (Sistem Pembangkit Energi) is my study program name. Learn about energy science which supported by mechanical and electrical subject such as thermodynamics, heat and mass transfer, fluid mechanics, heating and air conditioning, turbine, compressor, pump, power converter, control system, P&ID, renewable energy concept, and thermal power plant design.

  • Experience

    • PT PLN NUSANTARA POWER

      Jul 2016 - Sept 2016
      Student Internship

      Student internship in PT PJB UP Paiton (now called as PLN Nusantara Power). Occupy Machine 1 Maintenance Division which covering boiler and turbine side area.

    • PT Merak Energi Indonesia

      Feb 2018 - Apr 2021

      Role Overview:• Supported Performance Head and undertake any relevant duties and responsibilities within self capability as directed and defined by the superior• Coordinated with Operation Section to monitor the plant operation to meet management and business plan objectives• Monitored and evaluating electricity production, steam production, and plant efficiency• Monitored, evaluated, and provided performance report which covers the performances of boiler, condenser, feedwater heater, turbine, and electro-chlorination-plant• Performed regular test of the main equipment (e.g., boiler efficiency)• As a data centre and a provider of comprehensive reports regarding productivity, efficiency, performance of main equipment, fuel consumption, and emission (e.g., SOx and NOx) Show less PT Merak Energi Indonesia is classified as a private power utility (PPU) with coal-fired as a resource of power plant (2×60MW). It produces steam and power for PT Sulfindo Adiusaha as the main company which produces chemical products. PT Merak Energi Indonesia uses CFB (Circulating Fluidized Bed) Boiler to produce steam. The steam enters the turbine through a pipe, and it is used to rotate the blades of a turbine which consist of a high-pressure turbine and low-pressure turbine only to create mechanical or rotational energy. Role Overview:• Supported Operation or Performance Supervisor and undertake any relevant duties and responsibilities within self capability as directed and defined by the superior• Assisted Performance Supervisor for compiling Monthly Performance Report of Plant• Downloaded data from DCS for performance monitoring• Downloaded, collected & input data from SOS's (Senior Operation Supervisor) report for inventory and availability monitoring• Compiled daily performance reports which covering performances of boiler, condenser, pre-heater, turbine, and electro-chlorination-plant Show less

      • Performance Supervisor

        Feb 2019 - Apr 2021
      • Management Trainee

        Feb 2018 - Jan 2019
    • Genting Energy

      May 2021 - now

      Role Overview:• Manage and optimize the performance of generation assets• Examine and evaluate energy production, plant availability, and operational efficiency to meet management targets and business plan objectives• Supervise energy transaction processes between the company and PT PLN (Persero) in compliance with the Power Purchase Agreement (PPA) and its supplementary agreements• Ensure compliance with the PPA and supplementary agreements across all operational activities, capability testing, and energy meter maintenance• Provide comprehensive analysis to troubleshoot and resolve or improve any issues related to plant efficiency• Manage regular plant testing to monitor performance, reliability, and efficiency• Maintain awareness of interdepartmental activities that affect plant efficiency• Maintain and update operational and performance database to support business plan monitoring Show less As member of the Genting Berhad, PT Lestari Banten Energi (also known as LBE) operates supercritical coal-fired power plant 1x660 MW named PLTU Banten. It has succesfully achieved COD and supplying the energy to PT PLN (Persero) under Power Purchase Agreement.Role Overview:• Assisted Engineer and carried out relevant duties within own capabilities as directed by superiors• Monitored and evaluated energy production, plant availability, and operational efficiency to meet management targets and business plan objectives• Supported Engineer in supervising energy transaction activities between the company and PT PLN (Persero), in accordance with the Power Purchase Agreement (PPA) and supplementary agreements• Supported Engineer in ensuring plant capability and the accuracy of energy transaction devices, including NDC Tests and meter calibration, as stipulated in the PPA and related agreements• Prepared Plant Capability Declarations to support PT PLN (Persero) in its role as the primary electricity distributor in Indonesia• Conducted regular testing of main and auxiliary plant systems to monitor performance, reliability, and efficiency (e.g., boiler efficiency, furnace exit gas temperature [FEGT], overall plant heat rate, air heater leakage, coal fineness, etc.)• Acted as a data center and report provider, delivering comprehensive analysis with clear recommendations to improve plant efficiency and address performance deviations• Monitored plant emissions and fuel inventory, and provided recommendations to related departments for operational improvements Show less

      • Performance Engineer

        May 2025 - now
      • Assistant Performance Engineer

        May 2021 - Apr 2025
  • Licenses & Certifications

    • Planning Performance and Efficiency of Thermal Power Plant - Level 4

      Ministry of Energy and Mineral Resources (ESDM)
      Jun 2025