Avni Haznedaroglu

Avni Haznedaroglu

Instrumentation and Control Engineer

Followers of Avni Haznedaroglu3000 followers
location of Avni HaznedarogluAl Jubayl, Saudi Arabia

Connect with Avni Haznedaroglu to Send Message

Connect

Connect with Avni Haznedaroglu to Send Message

Connect
  • Timeline

  • About me

    Project Manager - Jubail Riyadh Water Transmission System Project (JRWTS)

  • Education

    • Yildiz Technical University

      1987 - 1993
      Bachelor of Engineering - BE Electrical, Electronics and Communications Engineering
  • Experience

    • Gazioglu Alüminyum

      Jun 1995 - Oct 1996
      Instrumentation and Control Engineer

      In the factory where aluminum profile was produced, two new press units, two old press units that were disabled, anodizing baths, heating furnaces, polishing units were modernized and put into operation with the developed PLC infrastructure and programs. Project Development and Maintenance processes were managed.

    • Solventas Teknik Depolama A.S.

      Oct 1996 - Oct 2020

      The Tank Terminal is a Type A General Customs Warehouse with a storage volume of 333,000 m3. Bulk liquid chemicals and petroleum products are stored in 217 tanks and operations continue through 51 pipelines.• Tank Terminal and Pipeline Automation and Management• Operational Technology and Information Technology Management• PLC/DCS & HMI Systems Design, Development and Modernization• Power Transformer, Generator and UPS Installation• Energy Monitoring and Efficiency System Installation• Petroleum Bunker Metering Project• Process Safety, ATEX, Instrumentation, Process Control, IT/OT, Software,• ISO27001, ISO22301, ISO50001• Fire Fighting Foam Monitor Control System and Fire Detection System Installation Show less Mechanical, Civil, Electrical and ICT System Development and Commissioning• Storage Tank Construction (Petroleum and Chemical) Total storage capacity increased to 280,000 m3 by the addition of 14 new internal floating roof tanks. OHSAS 18001 certificate has been received.• Pipe Line Construction (Stainless Steel and Carbon Steel) 51 new pipe line constructed• Fully automated tanker truck loading stations construction in order to provide better services existing tanker loading platforms are upgraded with latest technology products and redesigned to enable loading on scales.• Complete renovation of filling platforms has been completed. Weighbridges have been installed in order to be able to load existing filling platforms on the scale, so all fillings are carried out on the scale. In order to increase bunker services, more threshing units and pipelines were built.• Energy Systems Extension• Process Control, PLC/DCS, Scada, IT/OT, MES, ERP Systems• ERP / SAP Developments were completed and commissioned. SAP integration with the in house developed Terminal Management system was completed. Show less Instrumentation, PLC, Process Control, SCADA, IT and OT Management• Tank Gauging Radar System installed in more tanks and additional fully automated drum filling units installed. Communication with all tanks through the main computer. Completed of the tank monitoring systems so all the tanks now communicate with the main computer. Upgraded of the Terminal emergency alarm system.• National Marker Injection Automation System for petroleum products completed. The jetty operations have been fully automated. Firefighting systems have been automated by the addition of new diesel pumps. Wastewater system is completely renewed and have been automated. Show less

      • Senior Manager of Operational Technologies and Energy Management

        Oct 2017 - Oct 2020
      • Project Manager

        Oct 2010 - Sept 2017
      • ICT Manager

        Apr 1997 - Sept 2010
      • Instrumentation and Control Engineer

        Oct 1996 - Nov 2000
    • Limak Group of Companies

      Nov 2020 - now

      JUBAIL – RIYADH WTS PACKAGE C PUMP STATIONS3. Package C: Construction of Stations• This Package includes hydraulic design, control and communication system for the complete system• Pumping Station PS1 (near Jubail Plant) o 2 x 600.000 m3/d design capacity o 2 x 4 booster pumps (provisions for 1 additional spare per line) o Variable speed drivers for main pumps o 7 x 170.00 m3 tanks o Total Pump head: ~455 mlc• Pumping Station PS2 (near existing PS2 of RRWTS) o 2 x 600.000 m3/d design capacity o 2 x 4 main pumps (provisions for 1 additional spare per line) o Variable speed drivers for main pumps o Total Pump head: ~364 mlc• Pumping Station PS3 (near existing PS3 of RRWTS) o 2 x 600.000 m3/d design capacity o 2 x 4 main pumps (provisions for 1 additional spare per line) o Variable speed drivers for main pumps o Total Pump head: ~277 mlc• New Tank Farm at HPT (near Strategic Reservoirs) o 7 x 170.00 m3 tanks o Tank outlet piping with connection to Riyadh City Feeder Lines and HPT-A/B• Tie-in stations for Link line at HPT-A/B and HPT-C• Modification of PS1 at Ras Al Khair to allow emergency backflow operation from HPT to Ras Al Khair• Contract duration: 36 months + warranty period Show less JUBAIL – RIYADH WTS PACKAGE C PUMP STATIONSJubail Riyadh Water Transmission System (JRWTS) Project for SWCC under consultancy of JACOBSZATE. Project scope is to design, procurement and construction of 3 pump stations (capacity 1,200,000 m3/day) with 2 steel tank farms each one having 7x170.000 m3 storage capacity. Project is distributed to 4 main locations and 4 sub locations.• Pumping Station PS1 (near Jubail Plant)• Pumping Station PS2 (near existing PS2 of RRWTS)• Pumping Station PS3 (near existing PS3 of RRWTS)• New Tank Farm at HPT (near Strategic Reservoirs)Responsibilities and Achievements• Electrical Workso Design and Construction Management of Power Supply Systemso High Power Transformerso Medium Voltage Switchgearso Electrical Motorso Medium Voltage Variable Speed DriversManager ProfileManager Profile Manager Profile Manager ProfileManager Profile Manager ProfileManager ProfileExperienceExperience ExperienceExperienceExperienceo Medium Voltage Reactive Power Compensationo Low Voltage Switchboardso Emergency Diesel Generatorso UPS Equipmento Earthing and Lightning Protectiono Electrical Installation of Buildingso Cathodic Protection• ICT Workso Design and Construction of I&C Systemso Field Instrumentationo Installation and Start-up of Field Instrumentationo Distributed Control Systemo Central Control Hardware and Standard Softwareo SCADA and Plant Softwareo Fiber Optic Cable for Pipelineso Fiber Optic Cable Conduit and FOC Installationo Communication System Show less JUBAIL – RIYADH WTS PACKAGE C PUMP STATIONSThe Jubail-Riyadh water transmission system, owned by the state-run Saline Water Conversion Corporation (SWCC), will transport water from desalination plants near Jubail on the Persian Gulf coast to Riyadh, the growing capital city of the Kingdom of Saudi Arabia. It will be one of the largest water transmission systems in the world, capable of transporting 1.2 million m3 of potable water per day. The system consists of a 412 km twin pipeline, one pumping station in Jubail, two intermediate pumping stations, and two tank farms.Responsibilities and Achievements:• Managing the Instrumentation installation and commissioning activities• Managing the PLC/DCS/SCADA Automation systems site activities and contractor side• Managing the redundant Process Network• Managing the peripheral system integration via industrial protocol• Managing the Leakage Detection / Fiber Optic Based Distributed Acoustic Sensing (DAS) systems• Managing the Vibration Monitoring System for Pump Protection• Managing the Pump Optimization System• Planning, Scheduling and Management of site activities Show less

      • Project Manager

        May 2023 - now
      • Construction Manager, Electrical

        Dec 2022 - May 2023
      • Principal Electrical / I&C Engineer

        Nov 2020 - Nov 2022
  • Licenses & Certifications

    • Functional Safety in The Process Industry (SIL)

      KROHNE ACADEMY
      Feb 2016
    • Functional Safety Engineer

      TÜV Rheinland
      Dec 2015
      View certificate certificate
    • EN 60079-17 Electrical Devices Used in Explosive Gas Atmospheres - Part 17: Inspection and Maintenance of Electrical Installations in Hazardous Areas

      IEP Enerji Petrol Enstitüsü
      Nov 2015
    • EN 60079-19 Electrical Equipment Used in Explosive Gas Atmospheres - Part 19: Repair, major maintenance and commissioning and installation of electrical equipment

      IEP Enerji Petrol Enstitüsü
      Nov 2015
    • Energy Manager Certificate

      Ministry of Energy and Natural Resources General Directorate of Renewable Energy
      Jul 2014
    • Energy Manager Certificate

      Ministry of Energy and Natural Resources Electrical Works Survey Administration General Directorate
      Oct 2011
    • Meter Systems and Mid (Measurement Instruments Directive) Regulation

      Emerson
      Dec 2016
    • Risk Based Control – RBI API RP 580 – 581

      ReliaSoft Software
      May 2016
    • IEC 60300 Reliability Centered Maintenance – RCM

      ReliaSoft Software
      May 2016
    • Process Safety Management Internal Auditor Training

      ProSCon
      Nov 2016