Tyler Deng, P.Eng

Tyler Deng, P.Eng

Engineering Technician Co-op Student

Followers of Tyler Deng, P.Eng485 followers
location of Tyler Deng, P.EngCalgary, Alberta, Canada

Connect with Tyler Deng, P.Eng to Send Message

Connect

Connect with Tyler Deng, P.Eng to Send Message

Connect
  • Timeline

  • About me

    Mining Engineer, P.Eng at WSP in Canada

  • Education

    • University of Alberta

      2013 - 2018
      Bachelor of Applied Science - BASc Mining and Mineral Engineering 3.6

      Activities and Societies: U of A Intramural basketball team Jason Lang Scholarship Award Min E 402/403 Capstone Project: Completed pre-feasibility and feasibility study of Nickel Laterite Deposit in Brazil

  • Experience

    • Almor Testing Service

      May 2015 - Dec 2015
      Engineering Technician Co-op Student

      • Conducted Field and Laboratory testing of soils, concrete, and asphalt used for Infrastructure Projects• Performed and assisted in proctor and gradation analysis of various soil samples used for infrastructure to determine the optimum density and ensure the gradation of soil sample is within the client and city regulation.• Conducted daily testing of cured concrete cylinders to determine the optimum strength of the concrete and ensure it is within city regulations.• On site field testing of soil through use of nuclear density gauge to determine the dry density and moisture content of soil, ensuring it meets the city regulations.• On-site concrete testing through use of air meter, and slump cone, to ensure the air and slump of concrete meets with the client’s demands.• Site/Construction monitoring on Infrastructure Projects.• Worked with various clients and construction workers and communicated with them regularly about test results of soil and concrete, progress of the projects and potential problems that needed to be addressed. Show less

    • Mineral Geologia

      Jun 2016 - Sept 2016
      Intern

      • Assisted in on-site mine and operational inspections of various different mines nearby the city.• Assisted in designing and developing a mine plan through use of AUTOCAD and ArcGis.• Geo-referenced and geo-processed scanned photos onto its satellite image using ArcGis.• Conducted gradation analysis and geological descriptions of various different soils samples retrieved from the field• Organized folders of various mining documents using Microsoft Excel, and Word

    • Syncrude Canada Ltd.

      Jan 2017 - Sept 2017

      -Scheduled daily and weekly dumps and contracts plans that regarded for placement priorities of overburden, inter-burden material and contractual projects to support operations to follow while meeting the company's interim and long-term milestones.-Daily monitoring of the waste dump, tailings dyke and contractual projects to ensure the daily plan was being followed by operations-Designed multiple structures such as ramps and haul roads that followed in compliance with geotechnical, dewatering sumps and reclamation limits to minimize cycle times and increase productivity for haul trucks around the mine.-Created a scorecard sheet using Microsoft Excel and VBA which provided monthly volumes of each projected material type being sent to its proper location.-Analyzed and Presented 24 hour production updates on structure & waste dumps and provided suggestions for dumps plans moving forward during daily mine planning meetings.-Provided Business Team Leader and Production Day Supervisors economic evaluations on future reclamation or earthwork projects in alignment with Aurora's Business Development Plans Show less

      • Short Range Mine Planner

        Apr 2017 - Sept 2017
      • Heavy Equipment Operator

        Jan 2017 - Apr 2017
    • Golder

      Sept 2018 - Jan 2023
      Mining EIT

      Currently a Mining EIT at Golder Associates. Focused on mine planning, design and simulation for Oil Sands clients in Calgary. -Designing waste and tailings structures-Mine scheduling using Deswik, Spry, Minescape-Tailings modeling and staging-Developing Material Balance Schedule including waste and tailings placement plans-Creating year by year status maps showcasing mine progression and milestones-Calculating required primary (trucks and shovels) and support equipment (dozers, graders, etc)-Cost and Risk Analysis for alternative mine plans and key decisions-Resource Estimation-Pit Design-Reclamation Planning, soil salvage placement, closure planning and design Show less

    • WSP in Canada

      Jan 2023 - now
      • Mining Engineer

        Jan 2024 - now
      • Junior Mining Engineer

        Jan 2023 - Jan 2024
  • Licenses & Certifications

    • CSTS Safety Course

      CSTS
    • Professional Engineer

      The Association of Professional Engineers and Geoscientists of Alberta (APEGA)
      Oct 2023
  • Volunteer Experience

    • Private Tutor

      Issued by Tutor Doctor on May 2018
      Tutor DoctorAssociated with Tyler Deng, P.Eng