John Thomas Panicker

John Thomas Panicker

Intern

Followers of John Thomas Panicker338 followers
location of John Thomas PanickerAustralia

Connect with John Thomas Panicker to Send Message

Connect

Connect with John Thomas Panicker to Send Message

Connect
  • Timeline

  • About me

    Master in Engineering Management || Project Coordinator || Technical Office Engineer || High Voltage UG & OH Transmission Line Projects

  • Education

    • Good Shepherd Public School

      2013 - 2015
      Computer Engineering
    • INTERNATIONAL INDIAN SCHOOL RIYADH

      2000 - 2013
    • University of Wollongong

      2023 - 2024
      Master's degree Master in Engineering Management
    • Rajagiri School of Engineering and Technology, Rajagiri Valley P.O, Kakkanad, Kochi- 682 039

      2015 - 2019
      Bachelor of Technology (B.Tech.) Electrical and Electronics Engineering
  • Experience

    • Traco Cable Company Limited - Kerala Government Company

      May 2018 - May 2018
      Intern

      Traco cable company is a manufacturer of Overhead Conductor & Underground Power cable. Being an Intern there helped me understand the manufacturing process of Cable, Quality Test and packaging process of each type of cables.

    • Power Grid Corporation of India Limited

      Jul 2018 - Jul 2018
      Intern

      PGCL has one of India's largest power transmission grids. Being an intern in this 400/220kv substation helped me understand the basic knowledge about power transmission, protection & communication part of a EHV S/S. Also, this internship taught me the importance of Safety measures required when dealing with HV / EV live equipment’s.

    • TRITECH CORPORATION

      Jun 2019 - Jul 2019
      Intern

      Completed 7days training on REVIT electrical

    • Al-Nasser and Sons Company

      Dec 2019 - Sept 2020
      Electrical Site Supervisor

      Supervising Electrical installation in residential properties.

    • Trading and Development Partnership

      Oct 2020 - Jan 2023
      Technical Office Engineer

      TDP is the main contractor for Saudi Electricity Company, TDP has years of experience in EHV & HV Transmission Line Project across Saudi Arabia. As a Technical Office Engineer, I was working in multiple project with different responsibilities. Below are the few project I have worked on. >Construction of OHTL for Substation 8720, Riyadh KSA (Turnkey Project)Construction of new proposed Substation 8720 to Existing 132kv transmission line using 1km Underground line and 1.5 Km Overhead transmission line. Roles: Project Design Coordinator, Material Coordination, Document Control, Time Scheduling Client : Saudi Electricity CompanyContract Duration : 22 Months>Construction of Double Circuit OHTL from Uraidh Substation 8374 up to BSP 9048, KSA (Turnkey Project)132KV Connection of Existing BSP 9048 to Proposed S/S 8374 using 10 Km UG line and 12 Km OHTL. Roles: Project Design Coordinator, Material Coordination, Document Control, Time Scheduling Client : Saudi Electricity CompanyContract Duration : 22 Months>Replacement of Portion of the Existing 132kv DC OHTL 8078-8051 in conflict with Misk City Project Riyadh City Roles: Document ControlClient : Misk City Foundation Contract Duration : 8 Months Show less

  • Licenses & Certifications

    • Solar Engineering: Photovoltaic energy conversion

      EdX
      Aug 2020
      View certificate certificate
    • Universal Principles of Design

      LinkedIn
      May 2023
      View certificate certificate
    • Saudi Council Of Engineers

      Saudi Council of Engineers
      Feb 2020
    • Autodesk AutoCAD User Certification

      Autodesk
      May 2019
      View certificate certificate
  • Honors & Awards

    • Awarded to John Thomas Panicker
      Akshayapaathram KETCON Feb 2018 Bagged first prize in KETCON paper publication.