
Rizwan Baig
Junior Engineer Electrical

Connect with Rizwan Baig to Send Message
Connect
Connect with Rizwan Baig to Send Message
ConnectTimeline
About me
Procurement and Contracts Management Expert
Education

Govt College of Sciences Lahore
2003 - 2005F.Sc Pre-Engineering
Garrison Boys High School Lahore
2001 - 2003Matric Sciences
University of the Punjab
2006 - 2009B.sc Electrical Engineering AActivities and Societies: Student member Of IEEE
Experience

MIRZA ASSOCIATES ENGINEERING SERVICES (PVT) LTD
Jan 2010 - May 2011Junior Engineer ElectricalFEASIBILITY STUDY OF EVACUATION OF POWER FROM HYDROPOWER PROJECTS ON RIVER INDUS AND ITS TRIBUTARIES IN NORTHERN AREAS.A JOINT VENTURE OF PB (UK), MAES (PAK), PPI (UK) Responsibilities:Define the Corridor Right of way.Satellite Survey of Transmission Line using Google Earth, SOP GT Sheets and SUPARCO Images.Tower Spotting & horizontal alignment of Transmission Line using Google Earth and AutoCAD.Making the surface profile through optimal tower cad.Preparation of Survey Reports by using MS-Office. Show less
%20Ltd.%20Lahore..webp)
EnMasse (Pvt.) Ltd. Lahore.
Jun 2011 - Nov 2011Project EngineerSupervision of erection, commissioning and testing of 220 kV GIS substationElectrification of Housing SchemesELR and Feeder Analysis

National Development Consultants
Dec 2011 - Feb 2012Junior EngineerDASU Hydro Power Project (JV NK,DOLSAR, DMC, NDC, PES)Review feasibility study report,Load flow studies. To collect data and prices of power equipment, auxiliary switchgear and accessories for AIS and GIS substations.Design of GIB Power transmission line between main transformers in the underground power station to the outdoor switch yard, line and substation equipment BOQs. To collect prices from relevant Wapda contracts/projects and multinational manufacturers of power house, 500 kV transmission lines and substations for cost estimation.Short circuit and load flow studies of power house.General & Particular technical specifications, technical data sheets and drawings, preparation of bid documents. To assist for formatting of documents and drawings. Show less

INMA UTILITES CONTRACTING Co. / Arabian Bemco Contracting Co
Feb 2012 - Jun 2014Electrical EngineerWorking as Electrical Engineer for the implementation of Electrical Works on Load Center which controls and provide Electricity to KING ABDUL AZIZ INTERNATIONAL AIRPORT, JEDDAH.Study of Design Drawings and Shop Drawings.Study the Electrical standards of the project from the client i.e. NEC, IEC etc. Study the quality and safety standards of work.Study the catalogs of the materials.Calculate BOM and take off of material from shop drawingsExecution and completion of electrical work according to civil work and latest shop drawingsMake list of materials required everyday and make a request to issue material from the storeAfter completion of work, if there are any changes make as build drawingsAfter completion of work request QC Department for inspection and to raise request for inspection of work to the consultant.Coordinate with civil and mechanical engineers and prepare coordination drawings.Coordinate with low current engineers for electrical works.Coordinate with QC and safety department for the safe and quality work.Make execution and completion plans for completion of work.Handle more than 100 electricians and electrical helpers and make groups to complete the work on time. Assign the task daily to every group to complete the work.Make daily and weekly progress report of the work done.Guide and train the electricians to do good and quality work.Installation of PVC,EMT, RGS conduits, power sockets, lighting switches, lighting fixtures, panel boards, cable tray/ladder, cables and wiring of devices.Installation of MV/LV Switch Gears and TransformersInstallation of Battery system, battery racks Show less

SCAN Electromechanical Cont. Co. LLC
Jun 2014 - Nov 2015Project:Al Zahia Development Phase 2 MV & LV WorksKey Role:•Manage project execution to ensure adherence to budget, schedule, and scope and to monitor or track project milestones and deliverables•Overall strategic planning of the project to ensure timely delivery of the project•Oversee the project performance with regards to time, cost, HSE and ensure timely delivery of project by meeting quality standards•Direct or coordinate design, commissioning, installation, support or testing activities to ensure compliance with specifications or customer requirements.•Supervise and assign duties to site engineer/supervisors/technicians engaged in technical installation and commissioning of the project•Prepare estimates used by management for purposes such as planning, organizing, and scheduling work•Generate and update project progress reports, planned value, invoice projection and cash flow projection and follow up on the same•Tracking of the project schedule and preparation and submission of weekly Progress reports to client and the internal teams•Plan and schedule meetings with vendors, design team, site team, sub-contractors and attend client monthly progress meetings, consultant/management meetings•Inspect workplace environments, equipment, or practices to ensure compliance with safety standards and government regulations Show less PROJECT:E34/2013 132kV Cabling Works in Northern EmiratesKey Role: As per FEWA Technical specification, prepared and reviewed the following Plan & Drawings and submitted to FEWA: Detailed design drawings and construction drawings of the Cable Routes and the joints locations Details of Road crossing types & locations Proposed sheath earth bonding schematic diagramProposed method of cable laying and calculate cable pulling tension and side wall pressure of the each section of the cable route ROWPROJECT: SHARJAH INTERNATIONAL AIRPORT NEW RUNWAY 250 m SEPARATION AIR SIDEKey Role: Apply the SLD on ETAP and study load studies, short circuit analysis and propose relay settings Cable ampacity , size calculations , cable laying and pulling tension calculations for LV and MV cable laying Study and prepare of Single Line Diagram of 11 kV Substation and Distribution system as per consultant specificationInstallation of 4 numbers 1000 kVA and 8 numbers 50 kVA step-down transformersInstallation of 4 numbers 100 kVA step-up transformerInstallation of 11 kV RMU of Schneider ElectricInstallation of 4 numbers LV 780 kW backup generatorsInstallation of 4 numbers UPS ( UBT Piller make) 368 kW for backupInstallation of FO, LV and HV cablesTesting of RMU, LVAC panels, CT,PT, Relays Show less
Project Manager
Feb 2015 - Nov 2015Project Engineer Electrical
Jun 2014 - Nov 2015

Saudi Electricity Company
Nov 2015 - Jan 2018Project EngineerWorked for Saudi Electricity Company(Al Othman Consultants)/ National Grid Project Departments Al Hassa on multiple Projects of 380/115/13.8 kV substations.• Overall Project/Contract Management• Preparation of Tender Documents• Evaluation of Bids• Contract Awards• Negotiations with clients and contractors• Initiate the project by arranging the kick of meeting with the stakeholders and contractor• Review the submitted project schedule, safety, Quality, testing and commissioning plan of each project submitted by the contractor as per tenure of the project and give approval to the contractor and follow up with contractor to achieve the mile stone dates of the project• Review the project design and take approval from NG engineering department. After approval stamped the drawings issue for construction (IFC)• Review the material delivery schedule and FAT schedule of the major equipment submitted my contractor and give approval accordingly• Daily site visit for monitoring the execution of work as per approved drawings & for control the project progress• Material Inspections (MIR) of the project & request for inspection (RFIs) of site works raised by contractor as per Project Technical Standards (PTS) & SEC standards• Review the invoice claim raise by the contractor and given approval for invoices• Review daily progress reports and Bi-weekly progress reports and arrange meetings with contractor for smoothly running of project • Prepare the outage schedule and take approval of the outage schedule from SEC/NG internal departments and process in the SEC/NG SAP system• Prepare and submit daily and monthly progress report of site to our hire management• Arrange and lead the meetings between stakeholders and contractors to remove the bottle necks of the project• After completely energization of the project, handed over the substation to the SEC/NG operations department. • Claims management including the EOT cases of the contractors Show less

Decon international GmbH
Feb 2018 - Jun 2024Deputy Project ManagerNTDC Modernization Project-I (NTMP-I) Funded by World Bank consisting of preparation of bidding document for 27 Augmentation/extension Substations, 4 AIS to GIS Conversion Substation, one new 500kV Nowshera Substation with associated transmission line and two new 220kV Substations Zero Point and Mastung with associated transmission line•Perform preliminary site survey and collect necessary data to define the scope of work(sow). Send data to technical experts’ team corresponding scoping and engineering design works•Perform preliminary site survey and collect necessary data to define the scope of work(sow). Send data to technical experts’ team corresponding scoping and engineering design works•Prepare the inception report as per the site survey and submit to NTDC/World Bank for review/approval•Prepare the design report for each project package as per the site survey in which the scope of work, cost estimate is defined and submit to NTDC/World Bank for review/approval•Prepare the corresponding bidding documents for each project package, which include technical specifications/SOW for each project package and submit to NTDC/World Bank for review/approval•After issuing specific procurement notice and publishing request of bids of each project package, perform necessary site visit with bidders to explain them scope of work •Give necessary presentations in Pre-Bid Conference for each project package to explain the bidders about important aspects to comply with bidding document and reply on the bidders pre-bid queries about the bidding document•Perform Technical and Financial Evaluation of each project package and prepare necessary Technical Evaluation Report (TER) and Bid Evaluation Report (BER).•Participate in contract award negotiation meetings and prepare contract documents•Managing, coordinating and monitoring the Detail Design review/approval activities and overall correspondence with NTDC, JV consultant, World Bank, Contractors and associated stakeholders Show less

Intec GOPA - International Energy Consultants , ROENG T.E.C.
Jul 2024 - nowProcurement and Contracts Management Expert
Licenses & Certifications

Saudi Council Of Engineers
Saudi Council of EngineersApr 2014
Languages
- urUrdu
- enEnglish
- arArabic
Recommendations

Atanas angelov
Electrical Engineer | Diploma of Higher Education in AutomationCounty Kerry, Ireland
Timothy jin
Senior Software Engineer at GEICODallas-Fort Worth Metroplex
Johan kemppi
Saab Dynamics ABÖrebro, Örebro County, Sweden
Maram alsakharni
Data Analyst @ Whyise | Business Intelligence | SQL | Python | Power BI | SSRS | Data Visualization ...ヨルダン アンマン
Yan shi
Manager at ScotiabankWaterloo, Ontario, Canada
Vincent wolfe
Security Analyst for SysGen SolutionsBlackfalds, Alberta, Canada
Amanda j.
Operations Analyst/HRManassas, Virginia, United States
Leandro ribeiro
Oscar CalçadosRibeirão Preto, São Paulo, Brazil
Richard andrews
Retired Central Office Network Technician at Verizon CommunicationsSicklerville, New Jersey, United States
Sudhir kumar
Sr. MERN Developer || Industrial trainer || Full stack developer || DevOps engineerPunjab, India
Vishwaraj singh
Genpact (Process Associate) MBA (Finance) Ex Core Coordinator of Placement & Career Development Ce...Lucknow, Uttar Pradesh, India
Çağrı i̇lhami aka
Vice President at ATINÇ A.Ş / Co-Founder of YAYLA A.ŞTürkiye
Joe faraca
Operations & Supply Chain Management / Data Analysis / SalesBoise, Idaho, United States
Mohamed hassan, pmp, assocrics, aciarb
Resident Engineer @ ILF Consulting Engineers in Saudi Arabiaالرياض السعودية_(PMP)_(MBA).webp)
Abimbola adefulu (acipm) (pmp) (mba)
Operations Management|Human Resources| Project ManagementLagos Mainland, Lagos State, Nigeria
Gertie mantuano
Consultant at InforCalabarzon, Philippines
Marcus rettig
USAF Retired Senior Manager, MSM, Active TS/SCI, Problem Solver, Motivator, Team Builder, Program Ma...Bonaire, Georgia, United States
Idris odusanya
Creative Director | Football Coach | Experienced ManagerLondon, England, United Kingdom
Behzat gören
Hilti Turkey şirketinde Product ManagerŞişli, İstanbul, Türkiye
Sasha ucrós
Logistic Engineering | Data AnalysisPanama City, Panamá, Panama
...