José Augusto Caputo , MBA

José Augusto Caputo , MBA

Followers of José Augusto Caputo , MBA919 followers
location of José Augusto Caputo , MBADominican Republic

Connect with José Augusto Caputo , MBA to Send Message

Connect

Connect with José Augusto Caputo , MBA to Send Message

Connect
  • Timeline

  • About me

    Founder at DC Consultoría

  • Education

    • FIA - Fundação Instituto de Administração

      1997 - 1998
      Master of Business Administration - MBA Business Administration and Management, General 328 hours
    • FIA Business School

      2004 - 2005
      Project Manager Project Manager Capacitation 146 hs
    • Universidade Federal de Minas Gerais

      1979 - 1983
      Civil Engineer ENGINEERING
    • Fundação Getulio Vargas

      2007 - 2008
      Project Manager II Project Manager Capacitacion - Latin America 120 hs
    • Fundação Getulio Vargas

      1995 - 1995
      Contract Manager Law 8.666 - Licitacion Actualization 32 hrs
  • Experience

    • Andrade Gutierrez S.A.

      Aug 1981 - Apr 1986
      • Engineering department Assistant - Bids and Strategy

        Dec 1984 - Apr 1986
      • Engineering Strategy and Proposals Trainee

        Aug 1981 - Nov 1984
    • Andrade Gutierrez S.A.

      Jul 1988 - Jul 1997

      • US$ 39 MM Project Value• Irrigate Perimeter; 20.000.000 m2• Main Channels: 19.429 m• Distribute Channels: 69.000 m• Bridge Channel: 620 m • US$ 5,3 MM Project Value• Waste Distribution Line: 54.444 m• Domestic Conexions: 4.980m• Pump Lines: 4.980m• Pump Stations: 3 un • US$ 165MM Project Value: • Claim's Approved: US$ 200 MM• Main Structures & Services . Aparecida Bridge - Lgth 250m - - Contention Wall - Pier -Length 1.200 m - Hydraulic Sand Embankment - 708.321 m3 . Earthworks Convencional : 1.100.260 m3 . Paviment: 8.480 ton . Estructural Concrete 15.800 m3 • US$50,8 MM Project Value • Claim Approved: US$ 33,0 MM• Economic Engineer Responsable• Main Structures & Characteristics: . Water Treatment capacity: 3m3/seg (1a Fase ) . Water Capitation de agua capacity de 6 m3/seg ( 1a e 2a Fases) y 30 mca, manometric height .

      • Project Director - Russas Irrigation Channels (DNOCS)

        Jun 1995 - Jul 1997
      • Project Director - Manaus Waste Water System (COSAMA)

        May 1993 - May 1995
      • Project Director - Manaus Moderna Project

        Apr 1991 - May 1995
      • Junior Civil Engineer - Manaus Moderna Project

        May 1986 - Apr 1991
      • Senior Civil Engineer - COSAMA - ETA Ponta do Esmael - Water Treatment Estation

        Jul 1988 - Dec 1990
    • CCR S.A. (RODONORTE)

      Aug 1997 - Feb 1999
      Operations and Maintenance Manager

      Road Maintain Services Manager and Users Aid Services• 210 km single road-equivalent• 3 Tolls Finance Manager• 15.000 vehicules/dayUser help equipment : Winches, Ambulances, Trafic Control and help assistance

    • Arteris S.A. (INTERVIAS)

      Mar 1999 - Aug 2000
      Operations and Engineering Manager

      Road Maintain Services Manager and Users Aid Services• 240 km single road-equivalent• 3 Tolls Finance Manager• 38.000 vehicules/dayUser help equipment : Winches, Ambulances, Trafic Control and help assistance

    • OAS S.A.

      Sept 2000 - Jan 2006

      Business Conquists (Civil Projects) - Brazil• Moinho Pacifico - Wheat Silo and Construction of Auxiliary Structures -US$ 15 MM• Petrobras Centropol Pier- Santos,Sp - US$ 7MM• Vale (CVRD) - Brucutu Iron Mine - Minas Gerais - US$ 80 MM Strategic Proposal Leader from July 2005 to Jan 2006 • US$ 80 MM Hydro Project• Cap. 147 MW• 360.000 m3 Rolling Concrete

      • Director Of Business Development

        Jul 2002 - Jan 2006
      • Project and Partnership Director - Candonga Hydroelectric Dam

        Feb 2001 - Jul 2002
      • Director of Private Business Development

        Sept 2000 - Jan 2001
    • Andrade Gutierrez S.A.

      Feb 2006 - Mar 2018

      • Project Value : US$ 27 MM• Prosamin IDB contribute to the solution of the environmental, urban and social problems affecting the city of Manaus, in particular the resident population below the level of 30 meters in the basin of the Igarapé del Sao Raimundo (CISR), providing them with better living conditions.• Mains features in São Raimundo Drainage-basin: . Urbanization; , Micro Drainage; . Vial WorksMain Challenges:: ● Resettlement of families ( 100 families) ● Flooding Areas - São Raimundo River ● Large Rain Period - 6 months Show less • Project Value: $98 MM• Rehabilitation of the Hydroelectric Plant and Dam, with the construction of new Service and Auxiliary Spillways ; the Regrowth of the Dam , the rehabilitation of the B and C Bottom Gates; bridge and Entrance Channel to the service Landfill.• Features: . Reservoir Capacity: 415 MM m3 . Service Spillway: Excavation:1,200,000 m3; Concrete: 48,500 m3 . Auxiliary Spillway: Excavation: 42,400 m3; Concrete: 76,000 m3 . Dam Regrowth: H-6,00 m; Landfill : 175,000 m3Montegrande Dam : Concepts and Proyects Development Show less • Viablity Studies of Civil Engineer Concesions and Hydroeletric Bids.The main ones are:Viability . Tribugá -Arquimedes Port (Medellin Pacific Exit) - Value Project US$ 290.0 MMBidding . UHE Sogamoso - Hydroeletric Plant 800 MW - Value Project: US$ 638 MM . UHE Ituango - Hydro Plant 1a - Fase Deviation 2,400 MW - Value Project US$ 200 MM . UHE Ituango - Hydro Plant 2a - Main Fase 2,400 MW Value Project US$ 900,0 MM . Via Barrancabermeja - 30,1 km Road 16 Bridges - Value Project US$ 124,8 MM Show less

      • Project Director Manaus Igarapes Urbanization and Paving IDB Prosamin

        Jul 2016 - Mar 2018
      • Project Director Montegrande/Sabana Yegua Project

        Jul 2011 - Jun 2016
      • Director of Studies and Project Development Colombian Market

        May 2009 - Jun 2011
      • Director of Studies and Project Development Ecuatorian Marker

        Feb 2008 - Apr 2009
      • Director of Studies and Project Development Peruvian Market

        Sept 2006 - Jan 2008
      • AG-Olmos Partnership Negociation Representative

        Feb 2006 - Aug 2006
    • DC Consultoría SRL

      Oct 2018 - Mar 2024
      Founding Partner

      Increase project results, simplifying complex management tools with a simple methodology using PMI and Lean project management techniques, developing monitoring models to reach all levels of organizations, seeking constructive alternatives through alternative methods and technological innovations.

    • CERCONS RD

      Aug 2021 - now
      Managing Director

      Guayubin Dam -

  • Licenses & Certifications

    • Concrete Especial Structures -

      Universidade Federal de Minas Gerais Fundação Christiano Ottoni
      Jan 1985
    • Contract Manager Program - Andrade Gutierrez

      Andrade Gutierrez S.A. University
      Sept 2017
    • Executive Negociation

      AMANA-KEY
      Aug 1992
    • Setting Up a PMO

      LinkedIn
      Jan 2020
    • Creating and Giving Business Presentations

      LinkedIn
      Sept 2019
    • Risk Analisis for Investment Projects

      Instituto de Engenharia
      Oct 2003
    • Visual Communication for Business: The Marketer's Secret Weapon

      LinkedIn
      Aug 2019
    • Civil Engineer Budget

      Instituto de Engenharia
      Aug 2005
    • Civil Engineer Quality Management - TQC (Total Quality Control - (Discipline & Outspread)

      Universidade Federal de Minas Gerais - Fundação Christiano Otoni
      Nov 1993
    • CBCR 99 Road Concesions Congress

      Associação Brasileira de Concessionárias de Rodovias - ABCR
      Oct 1999
  • Honors & Awards

    • Awarded to José Augusto Caputo , MBA
      CEMEX Award for Infrastructure and Urbanism 2015 - 1st Place CEMEX Nov 2015 XXIV PREMIO OBRAS CEMEX - Reabilitacion Presa Saban Yegua
    • Awarded to José Augusto Caputo , MBA
      Premio CNI 1998 - 3er lugar Confederação Nacional da Industria - Brasil 1998 Quality & Productivity Incentive - Big and Middle Industry – Russas Project -AG