Victor Amala

Victor Amala

Student trainee & Industrial Attachment

Followers of Victor Amala420 followers
location of Victor AmalaLagos State, Nigeria

Connect with Victor Amala to Send Message

Connect

Connect with Victor Amala to Send Message

Connect
  • Timeline

  • About me

    MECH ENG || PMEC || PMP || Six SIGMA || (MNSE)

  • Education

    • University of Port Harcourt

      -
      Bachelor of Engineering - BE Mechanical Engineering
  • Experience

    • Expro

      Jun 2012 - Jan 2013
      Student trainee & Industrial Attachment

      I conducted preventive and corrective maintenance on plug valves, butterfly valves, Wilden pumps, and various mechanical components. I diligently repaired and oiled all equipment parts and components. I also skillfully stripped back faulty components, meticulously checked for any faults, and accurately logged them into the database. I took responsibility for plant evacuation and efficiently replaced worn-out parts to ensure continuous operations. I played a key role in data logging for pressure testing of lines and valves, ensuring accurate records for performance assessment.I collaborated with other service sections for breakdown/routine maintenance work in facilities and plant. My coordination, reporting, and planning skills contributed to the successful execution of maintenance and repair activities. Show less

    • Hale Energy and logistics limited

      Jan 2015 - Oct 2015
      Procurement and logistics personnel

      - Skillfully estimated and established cost parameters and budgets for purchases, resulting in an average cost savings of 15% across procurement processes.- Fostered strong relationships with vendors and suppliers, leading to a 20% increase in collaboration and improved supplier reliability.- Expertly negotiated pricing and supply contracts for equipment and services, achieving a 12% reduction in overall procurement costs.- Ensured the acquisition of high-quality products and supplies, contributing to a 25% decrease in defects and non-conformance.- Collaborated seamlessly with team members and procurement managers to achieve objectives, enhancing overall procurement efficiency by 30% and meeting project deadlines consistently. Show less

    • ROZDON

      Jan 2016 - Feb 2017
      Roustabout

      - Demonstrated proficiency in making and breaking up drill strings and connecting drill bits, contributing to a 10% reduction in downtime during drilling operations.- Successfully operated manifolds and supported mud chemist with mud weights, resulting in improved drilling efficiency and a 15% increase in overall productivity.- Maintained equipment on the rig floor, performing regular greasing of main block and manifold systems, leading to a 20% decrease in equipment breakdowns.- Facilitated smooth rig moves and efficient dismantling and erection of rig floor components, achieving an average downtime reduction of 25% during rig relocations.- Provided valuable support to the mud engineer in the mud room, ensuring accurate mud preparation and contributing to enhanced drilling performance. Show less

    • Rozdon ISL

      Jan 2017 - Jan 2020
      Field Engineer

      - Strategically planned and executed scheduled maintenance tasks for production machinery, resulting in a 20% reduction in unplanned downtime and a 15% increase in equipment lifespan.- Demonstrated expertise in diagnosing, repairing, and replacing worn-out parts and equipment, leading to a 25% decrease in maintenance-related delays and a 30% improvement in overall machinery performance.- Ensured full compliance with health and safety legislation, achieving zero safety incidents and maintaining a 100% safety record throughout the maintenance operations.- Meticulously managed budget and financial records, optimizing expenditure by 10% and ensuring cost-effective maintenance practices.- Diligently maintained comprehensive statistical and financial records, allowing for data-driven decisions, and efficiently managed stocks of supplies and equipment, leading to a 20% reduction in inventory cost - Conducted workload assessments and devised new operational processes that led to a 40% increase in productivity.- Managed a process re-engineering project to improve and consolidate end-to-end service processes; restructured communication flow among 10 departments and cut down paperwork by 75%. Show less

    • Buraja Century Limited

      May 2023 - now
      Engineering Project Manager

      I defined the project scope, goals, and deliverables to ensure clear objectives I developed detailed project plans with timelines, milestones, and resource allocation to streamline execution. I created and manage project schedules to ensure timely task completion, maintain an on-time task completion rate of 90%.I assembled and lead a project team of engineers, technicians, and other professionals. I assigned tasks and responsibilities, ensuring team members understand their rolesI provided guidance, support, and motivation to the project teamI developed and manage project budgets, controlling costs within limits. staying within 5% of the budget.I monitored project expenses and financial performance ,conducting budget reviews.I identified and address any budgetary issues or discrepancies, resolve discrepanciesI communicated project status, progress, and updates to stakeholders, including clients, senior management, and team members. send bi-weekly status reports.I prepared and present project reports and documentation. complete quarterly project presentations.I facilitated effective communication and collaboration among project stakeholdersI allocated and manage project resources, including personnel, equipment and materials achieving 95% resource utilization.I ensured optimal utilization of resources to achieve project objectives reducing wastage by 10%.I identified and resolve project-related issues and challenges and maintaining an issue resolution rate of 90%.I took decisions and provide solutions to keep the project on track and implement solutions.I adapted to changing project requirements and constraints, adjusted project plans within requestI maintained comprehensive project documentation, including plans, reports, and records I ensured accurate and up-to-date documentation for project tracking and auditing why achieving 95% documentation accuracy.I archived project documents for future reference ,archive documents within project completion Show less

    • Otis Elevator Co.

      May 2024 - now
      Sales Engineering Manager

      • Sourcing leads and cold calling potential customers• Developing business opportunities by arranging meetings and making sales pitches• Presenting technical plans and detailed schematics of products to customers• Providing detailed analytics to show customers why a product will help their business• Answering customer queries on scientific or technical issues • Providing a point of communication between the client and Account Managers or service providers• Arranging follow-up meetings with clients to retain their business and make further sales• Maintaining an up-to-date knowledge of their industry and the products or services they sell Show less

  • Licenses & Certifications

    • Rescue and Fire-Fighting Level I

      KAY-GRILLServices Nigeria limited
      Jul 2019
    • CPR/AED and First Aid Combo Course

      KAY-GRILL Services Nigeria limited
      Jun 2019
    • Oil and Gas safety Management

      OSHAcademy Safety and Health Training
      Nov 2019
    • IWCF certification level 1

      International Well Control Forum
      Mar 2019
    • Iwcf certification level 2

      International Well Control Forum
      Aug 2019
    • Lean Six Sigma Yellow Belt Certification

      TUM School of Management
      Jan 2020
    • Well site preparation and drilling safety

      OSHAcademy Safety and Health Training
      Nov 2019
    • Well Completion and Servicing Safety

      OSHA Safety Training Institute
    • Diploma in project management

      Alison
      Dec 2019
    • Well operation crew resource management

      International Well Control Forum
      Dec 2019