
Mohamed Attia

Connect with Mohamed Attia to Send Message
Connect
Connect with Mohamed Attia to Send Message
ConnectTimeline
About me
Integration Project Manager at Schlumberger
Education

Cairo University
2002 - 2007Bachelor of Science (B.Sc.) Petroleum Engineering Goodالأنشطة والجمعيات:Society of Petroleum Engineers (SPE) Steps Towards Progress (STP) SPE Member 2004 till now I was president of Cairo U. Student chapter in 2006, and 2007. Till now, I'm still participating in the SPE Egyptian Section meetings.STP is the first Engineering students conference held at Cairo University aiming to reduce the gap between education sector and working sector through teaching the participants some basics of non-engineering science and basic interpersonal skills, and giving them the chance to apply the acquired skills throgh annual… عرض المزيد SPE Member 2004 till now I was president of Cairo U. Student chapter in 2006, and 2007. Till now, I'm still participating in the SPE Egyptian Section meetings.STP is the first Engineering students conference held at Cairo University aiming to reduce the gap between education sector and working sector through teaching the participants some basics of non-engineering science and basic interpersonal skills, and giving them the chance to apply the acquired skills throgh annual conference. عرض أقل
Experience

Schlumberger
Aug 2007 - nowBased in Schlumberger Middle East and Asia Learning Centre (MLC) in Abu DhabiDelivering and Designing Training Material and Assessments for Drilling Engineering and Drilling Operations:- Five week Quartz fast-track school for Wellsite Leaders (field personnel)- IWCF level 2, 3, 4 (accredited instructor and assessor)- Seven weeks drilling essentials schools for engineering personnel- Stuck pipe prevention- Preventative well control and well integrity- Project management and risk management- All Schlumberger IPM well engineering schools عرض أقل Assigned to Well Engineering Group, Russia and Central Asia (RCA)Developed Madachagskaya Arctic exploration offshore drilling programWorked on the evaluation (conceptual design, drilling feasibility, and cost and time estimates) of three assets. 1. Kazakhstan (Moldabek Field - EmbaMunay Gaz): Including 5 different types of wells for the FDP of a shallow unconsolidated heavy oil reservoir. These wells are vertical producers; water injectors; steam injectors; vertical appraisals; and shallow horizontal wells (~ 200 - 250 m TvD)2. Uzbekistan (Gazli Field - Uzbekneftegaz): Horizontal oil producers wells to be drilled through ~ 300 - 500 m gas storage layers3. Azerbaijan (Sangachal Field - SOCAR): The FDP included evaluating different types of wells land and offshore. The wells are Vertical wells ~ 3000 m; S-shape at 3000 - 5300 m; Horizontal wells 5600 - 9000 m. Very challenging geology and field. عرض أقل Managing the internal and external training (4000+ training man-days per year) as well as teaching SLB-IPM training courses for IPM Iraq population as well as the IPM/drilling part for external courses. SLB committed to high numers of external training to ROO (BP jv) that can exceed 2500 training man-days per calander year.Internal training includes: Stuck Pipe Prevention (SPP); Preventative Well Control (PWC); Well Integrity II; Rig Training...etc.External Training Includes: Fast Track Drilling Course (FTDC); Fast Track Subsurface Course (FTSSC); Advanced Cementing; Advanced DD/MWD/LWD;Others (geological; hole problems; soft skills...etc.) عرض أقل This project has HP exploration/appraisal/development/workover wells to ~ 5000 m. 1. Badra Project is one of the most challenging projects for IPM in the world at the time it is being implemented. I was part of the team during the early stages of the project during which I participated in the DWOP exercise done with the Client as well as the Project's Readiness Review (PRR) and Project's kick off meeting. The 26" surface hole section was drilled deeper than 2100 m [~ 7000 ft.] to run and cement the 18 5/8" surface casing. I was in charge of well BD4, the fastest well for IPM to be drilled through these formations in Badra filed in 382 days. My role is a well engineer. At the time of assignment, we are at the startup phase which is considered challenging. I'm working on drilling program, design, risk assessment for the project and operations, required documents, EOWR, TvD curves, and all other necessary work required in the DEE cycle. It's very important as well to identify the risks ahead and working on preventing occurrence that could be very expensive.I was also holding some training sessions for one of Schlumberger Clients - ROO (BP JV). This training sessions were part of the Fast Track drilling Program, and included topics that I taught such as: rig sizing; rig systems; drillstring design; basic hydraulics; casing design; wellheads; BOP equipment. عرض أقل FOD Project, Basra, Iraq. FOD is a lumpusm project with ExxonMobil.The scope is to drill 10 wells in West Qurna Field, 3 different well types. The scope of the contract is extendable upon agreement with both parties. The main responsibilities are designing wells, preparing drilling program, follow up operations, evaluate and keep the continuous improvement.I was the only well engineer during the start-up of this project (first assignment t Iraq). It was really challenging, but the results were fruitful. We achieved a record in the field drilling the first well which made the client to send us a recognition letter. My efforts were recognized by the line management, and I received an IPM pro-award in return.I was asked to move to a more challenging project that is - at this time - in the start-up phase. عرض أقل Neftrack (sidetrack) Project, NNG Operations. A lumpsum project in Western Siberia, Russia with 6 RMG rigs where IPM is responsible for well engineering, well site supervision, and evaluation. NefTrak scope was mainly drilling re-entry sidetrack wells with different profiles (S-shape, deepening, horizontal, and horizontal with pilot hole). The siderack is done from Cased Hole (CH) using a one-trip whipstock system, then the different well profiles are drilled in slim hole to Total Depth (TD) ~ 3500 m Measured Depth (MD). For the horizontal wells, they were drilled with ~ 300 m horizontal section, logged using Tough Logging Conditions (TLC), and then completed using a slotted liner, External Casing Packer (ECP), solid liner, and a liner hanger with top packer. It is very challenging to lay down the horizontal wells in very tight reservoir (some times less than 0.5 m) while drilling these slim holes under extreme weather conditions. I was working as a Well Engineer both in the field and at the office. عرض أقل PICO-Amapetco Project consisted of drilling 5 deviated producion wells in the Amal field offshore Gulf of Suez with one jackup rig. Reponsibilities included operations support & services coordination, well engineering, and offshore rig exposure. Also helping in some projects in business development phase. The wells were drilled through mostly a salt dome structure that extends from the top of the reservoir to 200 m below the sea bed and reached 40 deg at 3100 m (MD) after kicking off shallow at 400 m. عرض أقل
Integration Project Manager
Nov 2020 - nowDrilling Technology Integration Centre (dTIC) Manager
Jun 2017 - Nov 2020Instructor and Assessor (IPM)
May 2015 - May 2017IPM Senior Well Engineer
Nov 2014 - Apr 2015IPM Senior Well Engineer
Jul 2014 - Oct 2014IPM Iraq Training Manager
Apr 2013 - Jun 2014Well Engineer III
Nov 2011 - Mar 2013Well Engineer III
Mar 2011 - Nov 2011Well Engineer II
May 2010 - Feb 2011Well Engineer I & II
Oct 2008 - Apr 2010Well Engineer
Jun 2008 - Oct 2008Well Engineer
Feb 2008 - Jun 2008Junior Well Engineer
Aug 2007 - Feb 2008
Licenses & Certifications

Iwcf
Languages
- arArabic
- enEnglish
- ruRussian
- frFrench
Recommendations

Wahid ullah
Works Officer (Civil) at Pakistan International AirlinesPeshawar District, Khyber Pakhtunkhwa, Pakistan
Teddy alemu
Computer Science Student | Software Engineer | Full Stack Developer (C#, JavaScript, SQL, Python)Meridian, Idaho, United States
Dr. marcien ndagijimana
Agricultural EconomistNetherlands
Bri monroe
Plano, Texas, United States
Srinivas amla
MS CS Student at University of Massachusetts Boston | Ex Software Engineer @Wings International Grou...Boston, Massachusetts, United States
Saurabh menon
Senior Manager - DS @ GenpactBengaluru, Karnataka, India
Himani pandey
Senior Analyst at SitusAMC | US Mortgage | Commercial Real EstateDelhi, India
Danutė vaitekūnaitė
Visual Artist / MFA student at NYU Abu DhabiAbu Dhabi, Abu Dhabi Emirate, United Arab Emirates
Ieva pociunaite
UX/UI designerDanmark
Milos gorunovic
National Sales Manager @ EUROWAG | Sales ManagementPančevo, Vojvodina, Serbia
Eleonora guido
Campaigns Project ManagerZurich, Switzerland
Tariq khan
Software Architect (UI) at WiproDelhi, India
Abdullah m. al-mudayris
Computer Science Student @ CCSIT KFU | UI/UX Designer | Interested in Mobile App Development..Riyadh, Saudi Arabia
Vinay kalambe
Consulting Solution Director @ Oracle | Solution Design | TOGAF | AWS | Cloud | Core Banking Transfo...Bungarribee, New South Wales, Australia
Julia soyer
Key Account Manager @Evisco AGMunich, Bavaria, Germany
Celine caddy
Marketing Manager with a banking background, focused on strategic partnerships.Stevenage, England, United Kingdom
Ulrich thiessen, dr. habil.
Programme Advisor - Private Sector Development at European CommissionKleinmachnow, Brandenburg, Germany
Ammar musmar
Site Engineer at Al-Haj Taher Al-Massri Co. شركة الحاج طاهر المصريPalestinian Authority
박지수
단비교육 윙크 Frontend DeveloperCheonan, South Chungcheong, South Korea
Mark howell
President at Mark Howell painting Inc.St Augustine, Florida, United States
...