Narayan Pradhan

Narayan Pradhan

Plant Manager

Followers of Narayan Pradhan384 followers
location of Narayan PradhanKathmandu, Bāgmatī, Nepal

Connect with Narayan Pradhan to Send Message

Connect

Connect with Narayan Pradhan to Send Message

Connect
  • Timeline

  • About me

    Mechanical Engineer, Runs Digital Marketing Agency & Training Institute, Trainer and Mentor.

  • Education

    • Training & Placement Cell NIT Silchar

      1988 - 1992
      BE Mechanical Engineering
  • Experience

    • Himal Oxygen Pvt Ltd

      Apr 1995 - Jun 1999
      Plant Manager
    • Hial Oxygen (P) Ltd

      Apr 1995 - Jun 1999
      Plant Manager

      Leaded a workforce of 33 men producing industrial and medical gas. Responsible for recruitment, training and the establishment and fulfillment of production goals, cost reducing techniques. During this period the production rose by 18% As compared to previous rise of 2%. Responsible for Production/Quality/Maintenance/Dispatch.Achievements1) Have been able to increase the overall profitability of the company by around 15% during the last year of association.2) Had initiated the implementation of Cylinder hydraulic testing system.3) Had successfully ran the newly commissioned 80 cubic meter oxygen plant of Sanghi make.4) Had successfully implemented the computerized cylinder tracking system.5) Had Developed training modules and plant operating procedures. Show less

    • Alcoa CSI Nepal (P) Ltd

      Feb 2002 - Dec 2004
      Production Manager

      Responsible for providing leadership for Manufacturing along with necessary support and leadership for the maintenance. Acted as an MR for the implementation of ISO9001:2000, Acted as Team Leader for the implementation of ABS (Alcoa Business system). Acted as steering committee member of ISO 14001 Implementation team and trained internal auditor for both QMS and EMS. Leaded the Tag out/Lockout verification program with cross functional team. Supported the customization of electrical system to Alcoa requirements. Served as the Trainer designing / implementing training programs. Responsible for implementing the best practices of other plant. Responsible for recruiting of the required staffs.Achievements1) Have leaded a fresh technical team in new processes and brought them to worldwide Alcoa standard within a short span of 2 years achieving metrics Such as PSY/MPI comparable to very experienced and old plant.2) Have developed 4 Team Leads from technicians within a span of 1 year.3) Developed and implemented various system for production monitoring as regard to productivity improvement such as 5S , visual controls, trigger points for improvement.4) Have successfully completed the erecting and commissioning of machineries .5) Have implemented a part of Lean manufacturing such as communication board etc.6) Have been actively involved in devising/coordinating/ implementing training activities.7) Developed Quality Manual/ Quality System Procedure/ Work instructions /Quality standards for the ISO 9001:2000 for the organization.8) Developed Knowledge requirement/Knowledge session plan/training modules/Skill matrix for all the functions right from Production /Quality/Maintenance/Sales/Planning /Stores/Purchase/HRM/QMS.9) Studied/analyzed/developed Preventive action for persistent Quality Problem,Resulting in quality cost reductions and improvements. Show less

    • Almuftah Service Center

      Dec 2004 - Dec 2008
      HVAC Engineer

      Responsible for Air conditioning and Home Appliances Service center operations, Responsible for Maintenance of all type of Air-conditioning and refrigeration equipments such as Window / Split /Package /Chillers for AMC contracts taken. Responsible for New project works as regard to Designing/ Installation and commissioning and. Leading a workforce consisted of 52 personsAchievements1) Have modified the complaint logging system and created system for analysis of complaints.2) Introduced the work monitoring system for repair works carried out in the workshop.3) Designed Quality plan and procedure for maintenance activities for .4) Developed EHS Manual and Safety Programs such as Tag out lockout and Verification, Fall control, Electrical safety, Machine Guarding, Hazardous Material Management.5) Have designed / erected new MVP panel of 170 KW with load balancing.6) Have designed/Installed/Commissioned 380 TR chilled water plant for MOE (Ministry of Education), State of Qatar. Show less

    • First American Capital V LLC

      Jun 2007 - Jun 2009
      General Manager
    • Nikhil Multi Services (P) Ltd

      Aug 2009 - now
      Managing Director
  • Licenses & Certifications