Faisal Khan

Faisal Khan

FIELD ENGINEER

Followers of Faisal Khan864 followers
location of Faisal KhanBarmer, Rajasthan, India

Connect with Faisal Khan to Send Message

Connect

Connect with Faisal Khan to Send Message

Connect
  • Timeline

  • About me

    Construction Manager at Woodlands Energy Services (WoodServ)

  • Education

    • Banagalore University

      1995 - 2001
      Mechanical Mechanical Engineering
  • Experience

    • National Construction Co. Pvt. Ltd

      Oct 2001 - Jun 2002
      FIELD ENGINEER

      During employment of above Mention Company in India worked as Field Engineer and I was main responsible for all site construction activities. I have been done Manpower control and mobilization,Pipe, spool, valve erection, welding and inspection co ordinate to achieve daily production targets Job assigned and flow up juniors to get productions Arranged material and Inspect that whether that as per specification or not Piping, Equipment, Heavy lifting, structural and site safety also has to monitor and assist that group to achieve target.Ensure that welding, cutting jabs and arranged consumable material.Ensure that all site activities as per specification and approved drawing Prepare daily progress reports and monthly reports with percentage of compilation.Prepare 3 week look ahead schedule for site construction Inspect all kind of piping support installation and assist accordingly Checked the quality installation of piping insulation Show less

    • Stewart and Lloyds India Ltd (India)

      Sept 2002 - Aug 2004
      FIELD ENGINEER

      During employment of above Mention Company in India worked as Field Engineer and I was main responsible for all site construction activities. I have been done,Manpower control and mobilization,Pipe, spool, valve erection, welding and inspection co ordinate to achieve daily production targets Job assigned and flow up juniors to get productions,Arranged material and Inspect that whether that as per specification or not,Piping, Equipment, Heavy lifting, structural and site safety also has to monitor and assist that group to achieve target.Ensure that welding, cutting jabs and arranged consumable material.Ensure that all site activities as per specification and approved drawing,Prepare daily progress reports and monthly reports with percentage of compilation Prepare 3 week look ahead schedule for site construction,Inspect all kind of piping support installation and assist accordingly Checked the quality installation of piping insulation Show less

    • Chevron

      Aug 2005 - Oct 2007
      Piping Enginer

      Ensure that construction activities are carried out to the highest HSE standards. Coordinate, Plan and schedule day to day inspection related work activities and direction of existing plant process units. Monitors and coordinate piping fabrication ,Erection ,fit up welding inspection ,Installation of various valve ,Hydro testing ,Pneumatic testing ,Bolt Tensioning and torque as required Cleanliness check ,Air Blowing tightness test and pre commissioning of process piping for Module piping project .Committed for the implementation of a safe working environment for the contractor team without any incident and injury free culture. Supervised and overviewed the contractor to implement the requirement of the subcontractor including the drawing and specification. Reviewed the construction procedure and job safety analysis. Planned the Overall activities and coordinate with other discipline in the same area. Maintained the quality control records and work safety. Monitored the flow of all work with the objective of improving the contractor productivity, schedule performance and safety. Ensure all piping quality control records required are completed prior to final inspection. Supervised the implementation of approved commissioning procedure as applicable for the piping generated and managed the mechanical completion punch list for the piping prior to final acceptance. Attend the weekly progress and coordinate meeting as required. Report to the construction manager. Reviewed and signed the permit to work and monitored the activities. Achieved the mile stone of piping progress. Managed and supervised all piping fabrication ,Erection , Fit up welding inspection ,Hydro testing pneumatic testing bolts tensioning and torque as required cleanness check air blowing and tightness test .Supervised and inspected the erection / installation and pre commissioning of process piping for SRU/ARU/AWS Project. C Show less

    • KBR, Inc.

      Oct 2007 - Aug 2010
      Project Engineer (KBR)

      Project Engineer responsible for managing and executing complete package relating to the equipment section overseeing all construction activity, and ensuring all preservation schedule and ITP are followed relating to main Compressors Turbines HRSG, Air cooled condenser (A-Frame) Columns, Vessel, and Internal etc. Responsible for processing all Vendor pipe system documentation for test files, overseeing that the correct documentation has been complied Ensuring that all piping work and supports are installed to the correct specification and match the latest P+ID ,Punch out and inspect by ISO and sign off witness all pressure testing and re-instatement and sign off ensure all RFI are raised and signed off to ensure all NCR and PCR are closed as soon as possible sign off all documentations for hand over to commissioning Show less

    • Saudi Aramco

      Aug 2010 - Sept 2012
      Offshore / Onshore Construction Superintendent

      To instruct the contractor to carry out and execute timely activities to meet the mechanical completion dates as set by the project planning program. Assisting, observing safety supplying drawing, answering TQ overseeing hydro/pneumatic testing and re-instatement for sign off test pack walk down and status close out of punch items by priority from list. Provided by TOSTR (Turn over systems tracking system) encourage closure of package for RFT signing permit compiling reports. Reports on project progress to inputs into the QTRAX system and to attend the meeting. Assist with pre-commissioning activities where needed to oversee that the safety precaution are adhered. Assisting with startup boiler introduce FG&BFW to boiler to produce steam for start of pre commissioning ,steam blow air blow lube oil flushing and chemical cleaning of piping system. Configuration of attemperation spool and knock out pots for steam blowing of system ,Removal of control valves and other equipment to initiate air blowing of system. Assembly of temporary spool for chemical flushing of lube oil and fuel gas system. Oversee UG Piping activities and system, CWS, CWR 24”to 102” carbon steel FW 30” FRP to 6”carbon steel riser, BS SS & OWS system also in my scope, making sure to follow up all QC Activity and clarify that all test packs are signed off with all the thrust blocks and riser in place and completed before back filling and release for paving. Lock out /Tag out responsible person monitoring the lock out and tag out of all piping systems for the nightshift liaison with U/O at the battery limits and client keeping a records tracking in the log book of all lock numbers, pipe code system and location, supervise all Qa/Qc personnel on the nightshift and collect reports giving supports and direction when needed. Total Manpower handle . Show less

    • Valentine Maritime Gulf L.L.C

      Oct 2012 - Jan 2014
      Lead Offshore / Onshore Construction Superintendent

      Ensure that construction activities are carried out to the highest HSE standards,Supervised and overviewed the contractor to implement the requirement of the subcontractor including the drawing and specification.,Project ‘ Activity planning , Manpower planning and distribution , progress monitoring and reporting on regular basis to the management , provide recovery plans and remedial solutions if the project is moving out of schedule / out of late curve.,Plan, Develop, Co-ordinate, Expedite and manage plant construction activities for large and extensive projects,Monitors and coordinate piping fabrication ,Erection ,fit up welding inspection ,Installation of various valve ,Hydro testing ,Pneumatic testing ,Bolt Tensioning and torque as required Cleanliness check ,Air Blowing tightness test and pre commissioning of process piping for Module piping project,•Supervised and overviewed the contractor to implement the requirement of the subcontractor including the drawing and specification,Analyze sequence of construction – Building construction plan for each structure and coordinate with planning department to develop baseline schedule and manpower planning.,Responsible to act as a focal point for overall coordination of activities between contractor and sub-contractor and between department to ensure progress and construction production output with proper planning and execution of each project.,Follows – up and enforce strict compliance of deadlines, API, ASME, fabrication Standard Specification and Drawing, Ensure projects are executed safety under set budget and time schedule. Show less

    • Qatar Foundation (Qatar Solar Techonology )

      Apr 2014 - May 2020
      Construction Manager

      To instruct the contractor to carry out and execute timely activities to meet the mechanical completion dates as set by the project planning program. Assisting, observing safety supplying drawing, answering TQ overseeing hydro/pneumatic testing and re-instatement for sign off test pack walk down and status close out of punch items by priority from list. Provided by TOSTR (Turn over systems tracking system) encourage closure of package for RFT signing permit compiling reports. Reports on project progress to inputs into the QTRAX system and to attend the meeting. Assist with pre-commissioning activities where needed to oversee that the safety precaution are adhered. Assisting with startup boiler introduce FG&BFW to boiler to produce steam for start of pre commissioning ,steam blow air blow lube oil flushing and chemical cleaning of piping system. Configuration of attemperation spool and knock out pots for steam blowing of system ,Removal of control valves and other equipment to initiate air blowing of system. Assembly of temporary spool for chemical flushing of lube oil and fuel gas system. Oversee UG Piping activities and system, CWS, CWR 24”to 102” carbon steel FW 30” FRP to 6”carbon steel riser, BS SS & OWS system also in my scope, making sure to follow up all QC Activity and clarify that all test packs are signed off with all the thrust blocks and riser in place and completed before back filling and release for paving. Lock out /Tag out responsible person monitoring the lock out and tag out of all piping systems for the nightshift liaison with U/O at the battery limits and client keeping a records tracking in the log book of all lock numbers, pipe code system and location, supervise all Qa/Qc personnel on the nightshift and collect reports giving supports and direction when needed. Total Manpower handle 9500 Show less

    • Woodlands Energy Services (WoodServ)

      May 2020 - now
      Construction Manager
  • Licenses & Certifications

    • Modern safety management

    • PROJECT PLANING MANAGEMENT

      CADD Centre Training Services Pvt Ltd.