Abanob Raouf

Abanob Raouf

Site Engineering

Followers of Abanob Raouf2000 followers
location of Abanob RaoufCairo, Egypt

Connect with Abanob Raouf to Send Message

Connect

Connect with Abanob Raouf to Send Message

Connect
  • Timeline

  • About me

    Senior Methods Engineer

  • Education

    • October High Institute for Engineering & Technology - OHI

      2012 - 2017
      Bachelor of Engineering - BE ENGINEERING
  • Experience

    • Besix-Orascom Jv

      Aug 2014 - Sept 2014
      Site Engineering

      Project: Mall of Egypt1– Plan concrete footing (P.C). 2– Reinforcement concrete footing (R.C) 3–Column (Scaffolding, Reinforcement, Casting) 4– Slaps (Scaffolding, Reinforcement, Casting)

    • Orascom Construction Ltd

      Aug 2016 - Sept 2016
      Technical Office Engineer

      Project: Air Force Hospital1– Shop drawing for concrete dimensions and reinforcement.2– Study and prepare requests for information (RFI).3– Finishing Painting.4– Finishing Tiles.

    • EL Tareek for development

      Aug 2017 - Nov 2017
      Site Engineer

      1– Finishing Painting 2–Finishing Tiles 3–Electrical works 4– Plumbing works 5- Blaster works 6-Wooden works7- Quantity Surveyor8-Surveying works

    • Inshaa for Development and Construction

      Dec 2017 - Nov 2019
      Technical Office Engineer

      1-Making shop drawing for all project elements as concrete dimensions and reinforcement (Reinforcement footing-Ground Beams-Columns-Slabs-tanks).2-Making pending bar schedule (BBS) after approving shop drawing.3-Making quantity surveying (Q.S) for all project elements as (plain concrete-reinforced concrete -Insulation-Back fill-Plaster-Masonry work-Tiles)4-Coordination works between Civil, Architecture and Electrical drawings5-Making request for information to ask the consultant about anything missing in drawing (R.F.I).6-Study the project contract B.O.Q.7-Following up with the site needing and Project schedule. Show less

    • VINCI Construction

      Dec 2019 - Nov 2021
      Methods Engineer

      Cairo metro line 31-Responsible for guiding the site to execute and overcoming different obstacles through sequence drawings2-Study construction equipment utilization approach and identifying type of equipment3-Make a Propose reliable technicality sequence of major construction activities4-Responsible for avoiding and mitigating different (risks/threats) that could take place during the execution5- Make optimization of using equipment and accuracy of execution deadlines6- Preparing calculation notes to be sure that the forces and loads which applied on temporary works are safe7- Visiting the Site regularly, to learn in detail the processes of construction and help to implement and improve the methods on the field. Show less

    • The Arab Contractors

      Dec 2021 - Jul 2023
      Methods Engineer

      Cairo metro line 4

    • Orascom Construction PLC

      Jul 2023 - now
      Senior Methods Engineer
  • Licenses & Certifications

    • Autocad

      نقابه المهندسن بالفيوم
      Sept 2015
    • Project Planning and Control Techniques (PRMG)

      The American University in Cairo
      Feb 2019