Ervin Koh

Ervin Koh

Engineer

Followers of Ervin Koh361 followers
location of Ervin KohSingapore

Connect with Ervin Koh to Send Message

Connect

Connect with Ervin Koh to Send Message

Connect
  • Timeline

  • About me

    Operation and Logistic Manager at JSR Construction Pte Ltd

  • Education

    • Singapore Polytechnic - Electrical Engineering

      1988 - 1992
      Diploma Electrical Engineering
    • Manjusri Secondary School

      1983 - 1987
      GCE ‘O’ Level with 5 credits and a distinction in Mathematics

      Activities and Societies: NPCC

  • Experience

    • Taikisha Ltd, Singapore Branch

      Mar 2000 - Mar 2003
      Engineer

      Successfully tender and completed US$10 million project from New Focus Technology (Phase 1). Design and built, 4 numbers of class 100 cleanroom with a total floor area of approximately 3000m2. Other areas include 2 offices, a warehouse and a mechanical plant room with a total floor area of approximately 6000m2 at their manufacturing facility in Shenzhen, China. Project completed within 3 months exceeding industrial standards.- Successfully tender and completed US$8.5 million project from New Focus Technology (Phase 2). Design and built 4 numbers of class 100 cleanroom with a total floor area of approximately 3000m2. Other areas include 2 offices, a kitchen, an auditorium, 4 numbers of training rooms, a recreational room, an internet access room and a gymnasium with a total floor area of approximately 4000m2 at their manufacturing facility in Shenzhen, China. Project completed within 3 months exceeding industrial standards. - Successfully overseas the modification from cargo to passenger lifts c/w security card access system.- Successfully tender and completed US$2 million project from Excelstor Technology. Design and built a class 100 cleanroom with a total floor area of approximately 500m2 and 2 numbers of class 10K cleanroom with a total floor area of approximately 800m2. Other areas include production testing areas, training room, warehouse and warehouse office with a total floor area of approximately 2000m2 at their manufacturing facility in Shenzhen, China. Project completed within 3 months meeting client’s production schedule. Show less

    • BrightBeam Pte Ltd

      Jun 2003 - Feb 2004
      Project Executive

      Successfully manage and renovate SATS R&D Office, SATS Legal Office, SATS Kitchen Upgrading Work and SATS Flight Ops Office. - Participate in tender exercise for Singtel Comcentre upgrading work for HVAC, Electrical and Control System, Fire Protection System, PA system, etc.- Involves in Datacentre A&A upgrading work (HVAC, Electrical, Fire Protection System, etc) in Telepark & Comcentre.

    • Taikisha Singapore Pte Ltd

      Feb 2004 - Feb 2005
      Senior Engineer

      - Successfully complete US$700K project from Excelstor Technology. A&A work to existing cleanroom and production area with a total floor area of approximately 500m2 at their manufacturing facility in Shenzhen, China. Project completed within schedule, meeting client’s production schedule.

    • Hitachi Plant Technologies, Ltd

      Jun 2005 - Feb 2007
      Project Engineer

      Manage Electrical and Control System for Machine Hook-up and Maintenance Work inside HNS premises including cleanroom.- Perform site investigation and advise client accordingly- Design and draw P&ID drawings including quotation for submission and construction- Provide engineering advise and site supervision to ensure work is completed within budget and schedule- Conduct testing and commissioning before handing over to client- Ensure necessary documentations are submitted for record purposes- Program OMRON PLC for Centralised Monitoring System, when necessary- Program Fix Intellution - SCADA software, when necessary- Maintain and troubleshoot Johnson Control, BMS system- Maintain and schedule yearly sensors calibration work- Maintain and schedule yearly calibration of existing Room Ionizer System- Monitoring of existing HVAC system inside plant and recommends necessary upgrading and improvement work.- Involves in UPS Battery replacement work and switching of UPS Power source during shutdown period- Successful modification of existing air showers interlocking system to meet client’s new requirement- Successful modification of existing OAC system to Auto Standby Startup OAC System- Design & built new Server Room inside HNS- Successful upgrading of new Chiller system Show less

    • S& TECHS (Hong Kong Company)

      Feb 2007 - Oct 2007
      MEP Manager

      Design and built a Class 100K cleanroom in Hai Duong, Vietnam. Fully in charge of the installation work which includes the architectural, HVAC, electrical and plumbing system. Supporting rooms includes 3nos of production area, kitchen, canteen, warehouse, offices, server room, etc. - Check and ensure all construction drawings are correct - Engineers performed their duties correctly and diligently - Sub-contractors construct according to our design drawings - Budgeting, negotiation and issuing of PO - Logistic matters for delivery of material from china to Vietnam - Testing and commissioning of HVAC, Electrical system and Cleanroom protocol, including air balancing, leaked test for piping and ducting, HVAC control simulation, air borne particle test, etc. Show less

    • CYCLECT ELECTRICAL ENGINEERING PTE LTD

      Oct 2007 - Mar 2010
      Manager

      MARINA BAY SAND CASINO BACK OF HOUSE RETROFITTING WORK (JAN 2010)Successfully won the tendered of 1 year term contract for Marina Bay Sand (MBS) Back of House (BOH) Retrofitting work. We will be responsible for the whole MBS retrofitting work consists of Hotel block, Conventional Hall, Exhibition Hall, Casino, etc.To co-ordinate with system furniture supplier, end user and facility member on their new power and data requirement. Mobilize and ensure all works are carrying out within the tight schedule and submit quotation based on agreed SOR for client’s approval. F1 NIGHT RACE (YEAR 2008~2010) I have successfully completed Singapore’s first F1 night race, in which Cyclect are responsible for the design and built of electrical power for the Racing Teams and also the necessary power needed for all the supporting services like F&B stall, First Aid facility, Super-screens for showing the race, etc. I had to oversee the whole operation, inclusive of the design of about 300 electrical panels to be used throughout the whole circuit of 5.2Km. Responsible for the dismantling and storage of material to the respective storage area designated by client after the race event. WOODLAND TECH SEMICONDUCTOR (OCT 2007 ~ JUN 2008)This project has a lot of challenge as there are a lot of services already in the FAB and limited space for cable ladder routing, thus proper planning and design needs to be done, in-order to accomplish the work within budget and schedule. First design and built of outdoor lightning protection system on a steel bridge to prevent induced voltage from lightning, traveling thru electrical cables to the Main Switch Board(MSB), which will in turn caused it to trip or damaged the MSB/panels. Installed a total of 113nos of panels, 8nos of bus-ducts, 2nos of 300KVA UPS, 1no of DYSC system and Fibre-glass lightning protection system within 7months for phase II and III. Show less

    • CONFLUENCE PM

      Apr 2010 - Oct 2011
      Power Supervisor

      I have successfully completed F1 2010 & 2011 as a consultant. My main scope of work is to handle the power aspect of this job which includes power supply to all facilities, generators deployment, diesel refueling, public lighting, decorative lighting and UPS system for essential equipments.Provide technical knowledge to help my client to decide on the engineering aspect of this project in terms of power requirement. Recommended infrastructure upgrading work to help save cost and reduce the risk of failure.I overseas and ensure all other contractors working within this project, submit their power requirements correctly in order for the electrical contractor to design and built the power network.Held weekly meeting with the contractors and record the minutes of meeting to ensure everything is in order for the smooth delivery of this project. Ensure the contractors have a correct inventory list, with the material belonging to the client, and all materials deliver to storage is in good condition and accounted for. Show less

    • MUSIM MAS GROUP (Indonesia)

      May 2012 - Jun 2012
      Chief Engineer

      Lead a team of engineering staff to conduct preventive maintenance for a 4star hotel in berastagi, Indonesia.Review M&E design for A&A project by contractors and ensure smooth construction and delivery of work.The work area is in a mountain with volcanoes nearby. The air is polluted with sulphur and it’s thin. The road leading to this resort hotel was dangerous and just the 3weeks that I’m here, there are already 2 landslides. Due to health and safety reason, I decided to resign and look for another job. Show less

    • Faithful+Gould

      Mar 2013 - Oct 2020
      Power and Comms Manager

      Join as a permanent staff in Confluence PM as Asst Power and Comms Manager.Managed F1 Singapore project in terms of power requirements using permanent power from Powergrid sources and also from power generated thru power generators deployed on site.Promoted to Power and Comms Manager in April 2014 till now.Additional scope of work for race related requirement and the communication part of this project.

    • JSR Construction Pte Ltd

      Oct 2020 - now
      Operation and Logistic Manager
  • Licenses & Certifications

    • Construction Safety Course for Project Manager

      BCA
      May 2009
    • Risk Management

      NTUC Learning Centre
      Dec 2006