Fayez Altalib

Fayez Altalib

Site Engineer

Followers of Fayez Altalib4000 followers
location of Fayez AltalibTabuk, Saudi Arabia

Connect with Fayez Altalib to Send Message

Connect

Connect with Fayez Altalib to Send Message

Connect
  • Timeline

  • About me

    Project manager at NEOM

  • Education

    • A&M university at hansville AL

      1996 - 2000
      Bahelor electrical engineer Electrical, Electronics and Communications Engineering 3.2 / 4
  • Experience

    • Baker Hughes Intec

      Jan 2000 - Jan 2001
      Site Engineer

      Drilling Oil wells

    • Schlumberger

      Jun 2001 - Nov 2001
      MWD/LWD Engineer

      • Oil Industry Production

    • AL JERAISY GROUP COMPANY

      Feb 2002 - Jul 2003
      Consultant for Aramco Company

      • CA/FAS (Facilities Services) Unit, Bldg-84ODuring my Six months with CA/Facilities Services Unit I was involve in doing the PM (Preventive Maintenance) for the rectifiers, inverters and other electrical equipments. Moreover, I was heavily involved in maintaining all Bldg 840 DH facilities, fire alarm disabling, AC conditioners maintenance, smoke detectors, inside/outside Bldg projects, tracing and labeling receptacles, and also writing maintenance reports.• CA/OSP (Out side Plant) Unit. B-3163, July 2002— Jan 2003 During my seven months with the Central Area OSP Unit, I was given different duties and responsibilities such as writing and reviewing technical writing reports, reviewing the OSP’s designs, coordinating the bi-monthly OSP M-job meeting, finalize the minutes report of the M-job meeting and following up on contractors’ workers on the field. In addition, helping on doing a Cut over sheets in preparation of cables pair’s transfer, keeping and tracking daily T.T. and S.O. for OSP Unit. Conducting a site surveys with OSP Engineers and contractors before starting and after completing any job, to insure that the job was implemented as it was planed. Show less

    • Al-Hugayet General Contracting Company

      Aug 2003 - Oct 2007
      Electrical Field Engineer

      UPGRADE SANITARY WASTEWATER TREATMENT FACILITIES, DH/ BI-10-00466 In this project I was evolved in the early design stage to work along with the designer contractor office in designing this project. However, this experience gave me the opportunity to gain more knowledge of a flow of a project, plan through out the project, estimate the total cost of the project. DH LAP R&D project/ BI-10-3313 I was involved with following up contractor’s weekly progress. Moreover, reviewing technical submittals, advising contractor, writing daily reports, plan through out the project, and estimating the cost of the project, conducting meetings with contractor, vendors, designer and assuring safe and successful works.ABQAIQ LAP/ BI-10-3420 I was working as Site Superintendent for Six months. Covering the place of Civil, Mechanical and Electrical Engineer. I gain the opportunity to deal with more electrical equipment such: 200KVA transformers, Stand-alone UPS’s, and testing/commissioning electrical cables. SUP (Security Upgrading Project) BI-10-00221 In this project, I was involved in providing Electrical power to the CCTV System, street lighting, Guard houses, and all associate (trenching, terminating, testing, and commissioning). Thus, install new Electrical devices such as: Fiber optic Mesh, and Security Cameras around communities. However, this project increased my knowledge in coordination with other Aramco departments. Show less

    • Fluor Arabia

      Oct 2007 - Apr 2009

      Sipchem (Saudi International Petrochemical Company)- I was hired as Instrumentation Engineer III. - Assigned to review submittals, -Coordinate with the design contractor, -Conduct technical meetings providing solutions to numerals work issues, -inspect the contractor work flow as the project progress,- review RFI’s, and preparing a leader work schedule procedure.

      • Instrument engineer III

        Apr 2007 - Apr 2009
      • Instrumentation Engineer II

        Oct 2007 - Mar 2009
    • I.T.M.

      Apr 2009 - Jun 2012
      Site Superintendent Engineer III

      - Loop Folders Shooting, -Functional Testing responsibility among Aramco Standers familiarity. -Loop Folders systematize, -Instrument Installations verify P&ID walkthroughs. -Contractor site construction follow ups.

    • Eaton

      Jul 2012 - Dec 2016
      Production Manager

      Assures product and process quality by designing testing methods-Provides manufacturing decision-making information by calculating production, labor, and material costs; reviewing production schedules to release for construction.-Maintains product and process data base by writing computer programs; entering data.-Completes design and development projects by training and guiding construction technicians.-Maintains professional and technical knowledge by attending educational workshops at site of construction.-Maintains staff by recruiting, selecting, orienting, and training employees; developing -personal growth opportunities-Maintains safe and clean work environment by educating and directing personnel on the use of all control points ( 5s) Show less

    • ADVANCED PRECISION SERVICES (APS)

      Dec 2017 - Apr 2018
      Production Manager

      Working as production manager and holding the production / manufacturing unit This opens the opportunity for me to gain the knowledge in Chemical Skid Manufacturing for Aramco. Thus, following the procurement and delivering the final product as planned to customer.

    • China Petroleum Pipeline Engineering Co.,Ltd.

      Nov 2018 - Nov 2020
      Construction Manager

      Working to construct a petroleum pipeline for Aramco from RT to YN; the challenge in this is the schedule, where we have to complete it in two years' period of time. This project involved me to open wised mind to accumulate engineering self-control of (Mechanical, Civil, instrumentation and electrical). It has also, involved me in public relation with Aramco and Government.

    • NEOM

      Jun 2021 - now
      Senior Project Engineer

      Managing several high profile projects at NEOM outer region sector. Consist on fast tack projects with high budget.

  • Licenses & Certifications

    • PMI Risk Management Professional (PMI-RMP)

      Project Management Institute
    • Project Management Professional (PMP)

      Project Management Institute