
- Timeline
- About me- Sarıyer Kilyos Tünel Projesi - IC ICTASConstruction - NATM Şefi 
- Education - Selçuk üniversitesi2001 - 2006Faculty of engineering geology/earth science, general
 
- Experience - Ado energy productionApr 2007 - Apr 2008Site engineer expert- KOZDERE HYDROPOWER PLANT PROJECT(DRILL AND BLAST) Energy Tunnels, Surge Chamber and gConstruction of Regulator (LONG;8300 mt - DIA;4,20) 
 - Fermanoglu construction engineeringApr 2008 - Sept 2009Tunnel shift engineer- ANKARA-SIVAS SPEED TRAIN PROJECT TUNNELS (NATM METHOD)Field Organization;Underground Excavation, Tunnel Fortification(Sprey Concrete- Ibo Bolt-Forepoling,Grouting) Reinforcement and Invert - Lining Concrete,Infrastructure and Drainage (TOTAL;4893 mt - DIA;12,5) 
 - Hitit construction & miningSept 2009 - Jun 2012Chief of tunnel- ARKUN HYDROPOWER PLANT PROJECT(DRILL AND BLAST)Energy Tunnels; (LONG;15100 mt - DIA;7,20) Shaft; (LONG; 80mt - DIA;8,0) 
 - Ekol koz maden i̇nşaat san. ve tic. ltd. şti.Jun 2012 - Sept 2014- Istanbul Metros III. Stage Levent station ladder tunnel L = 116m excavation and supporting. Isolation and coating with shotcrete. Business delivery.İstanbul Metrosu III. aşama Levent istasyonu merdiven tüneli L=116m kazı ve desteklemesi. İzalasyon ve shotcrete ile kaplanması. İşin teslimatı. Two pieces of paralel twin tube tunnel constuction has been in progress Kasımpaşa Tunnel (NATM METHOD) Two parallel tubes field organization Umbrella Arch Application of Kasımpaşa Tunnel (Total;1200 mt) Classes C2-C3 underground excavation and fortification ( ibo bolt – forepoling sprey concrete application) Membran application and testing, contact injection, foundation beam and invert and lining concrete, infrastructure and drainage - Construction EngineerJul 2014 - Sept 2014
- Field engineer/Geologial EngineerJun 2012 - Jul 2014
 
 - Emon yapı maden i̇nş.san.vetic.ltd.ştiSept 2014 - Feb 2018Construction engineer- Five pieces of paralel twin tube tunnel constuction has been in progress İstanbul-Şile-Ağva Tunnel (NATM) ten parallel tubes field organization Umbrella Arch Application of Şile-Ağva Tunnel (Total;5434 mt) Classes B3-C2-C3 underground excavation and fortification ( ibo bolt – forepoling sprey concrete application) Membran application and testing, contact injection, foundation beam and invert and lining concrete, infrastructure and drainage 
 - Ekol koz maden i̇nşaat san. ve tic. ltd. şti.Mar 2018 - Apr 2019Construction manager- Eyüp-Silahtarağa Road Tunnel ProjectOne pices L=96m NATMUmbrella archibo&pg bulon, enjection 
 - Makyol - ictas - kalyon - astur (mika)Oct 2019 - Jun 2020Chief of tunnel
 - Nuryol & bsm grupNov 2020 - Nov 2022Tunnel engineer- Gebze-Darıca Metro Projesi 
 - İstanbul üstyapı - i̇spa ortaklığıJan 2023 - Mar 2023Saha mühendisi- Dolmabahçe Levazım Tunelleri Fulya şantiyesi 
 - Ic i̇çtaş i̇nşaat / ic ictas constructionMar 2023 - nowNatm şefi
 
- Licenses & Certifications - C sınıfı i̇ş güvenliği ve sağlığı uzmanıT.c. çalışma ve sosyal güvenlik bakanlığıAug 2014
 
- Recommendations - Rekha sharmaanalyst@accenturePalwal, Haryana, India
 - Radha agarwalActuarial Analyst at Swiss ReIndia
 - Travis schultzLooking for a new career.Beloit, Wisconsin, United States
 - Ashish jainAnalytics Services | Solution ArchitectureNoida, Uttar Pradesh, India
 - Anol royAssociate UPI/URCS Design and DevelopmentHyderabad, Telangana, India
 - Obaruvbe jeremiah"Strategic Sales Specialist | Expert in Building Client Relationships & Exceeding Targets" Merchandi...Sokoto, Sokoto State, Nigeria
 - Cynthia kathlene williamsTerminal Manager, LSI TransportationDallas-Fort Worth Metroplex
 - Cindy .Product & Category Development Lead at Kopi KenanganJakarta, Jakarta, Indonesia
 - Bas bouwmanLeerkracht Stichting Eduquaat, schrijverWeert, Limburg, Netherlands
 - Filip todosovSkopje, Skopje Statistical Region, North Macedonia
 ...