Mahmoud El Dakak

Mahmoud El Dakak

Followers of Mahmoud El Dakak1000 followers
location of Mahmoud El Dakak6th of October, Al Jizah, Egypt

Connect with Mahmoud El Dakak to Send Message

Connect

Connect with Mahmoud El Dakak to Send Message

Connect
  • Timeline

  • About me

    Mechanical Engineer @ bp | Process Safety & Reliability

  • Education

    • Faculty of Mechanical Engineering Alexandria University

      2005 - 2009
      Bachelor of Science (B.Sc.) Mechanical Engineering (Major: Power)

      Activities and Societies: Basketball - Graduation Project:- “Design of selected units of third generation oil refinery” supervised by Dr. Hassan Warda, the project included:-- Feed pipeline design-- Storage tanks design-- Design of atmospheric distillation,vacuum distillation and delayed Coker equipment-- Design of heat transfer equipments-- Delayed Coker modernization-- Process simulation using Hysys software-- Process control using LabView software- Project Grade: Excellent and was… Show more - Graduation Project:- “Design of selected units of third generation oil refinery” supervised by Dr. Hassan Warda, the project included:-- Feed pipeline design-- Storage tanks design-- Design of atmospheric distillation,vacuum distillation and delayed Coker equipment-- Design of heat transfer equipments-- Delayed Coker modernization-- Process simulation using Hysys software-- Process control using LabView software- Project Grade: Excellent and was ranked the 3rd best project among 11 total. Show less

    • Riyada Language School, Alexandria, Egypt

      1991 - 2004
      Egyptian High School Certificate of Education
  • Experience

    • Savola Group

      Dec 2009 - Mar 2014

      In charge of Utilities plant from the Construction Phase till the commissioning phase ,then working as a senior supervisor (O&M) during production phase . Project phase:- Follow up the Manufacturing process for two package boilers in india (Thermax Babcock & Wilcox) MCR: 80t/hr each, Follow up the Manufacturing process for steam turbine (14 MW) in Italy (Fincanteri) + FAT test, then supervising the construction and Mechanical erection of equipment on site. (Project management from equipment manufacturing to commissioning phase is performed by using Microsoft Project)- Supervise the civil construction and Mechanical installation for Waste water treatment plant (Anaerobic Biobed ESGB and Aerobic treatment) supplied by Biothane Veolia.-Supervise installation and commissioning of Raw water treatment plant (Reverse Osmosis and Deionization plant) supplied Veolia.- Improve water mass balance in the design phase. - Monitors the activities of assigned contractors performing work in coordination with the contracts administration group. - Review and inspect all erection documents, drawings & specifications.Production Phase :- Supervise the Operation and Maintenance of All Utilities units. - Participating in risk and value management in regards to cost and schedule control.- Coordinate with the head of departments and other engineers to ensure timeliness and efficiency of work and suggest improvement to processes to improve equipment effectiveness. Show less - Conducts diagnostic surveys and evaluation using vibration analyzer (CSI 2130 device),Infra-Red thermograph devices .- Provision of first principles condition monitoring and system health management through a reliability centered process (including vibration monitoring, thermographic surveys, spectroscopy etc).- Management for governance, oversight and system health for key activities during normal operations and outage work - Management of the fleet rotating plant condition based monitoring program.- Promote predictive maintenance and execute predictive failure mode analysis. Manage on line and off line monitoring equipment and upgrades.- Determine and set standards for condition based monitoring routines and intervals.- Practice all condition based monitoring techniques for electrical, mechanical and instrumentation related to plant and equipment, supporting maintenance.- Leads a team of technicians engaged in the collection of vibration measurement and other critical parameters associated with major rotating equipment; to enable the diagnosis of trended data as part of the maintenance policy for condition based maintenance. Show less

      • Senior Mechanical Engineer

        Mar 2011 - Mar 2014
      • Condition Monitoring/ Predictive Maintenance Engineer

        Aug 2010 - Mar 2011
      • Planning Engineer

        Jun 2010 - Aug 2010
      • Utilities Supervisor

        Dec 2009 - May 2010
    • Arabian Sugar Company B.S.C.(C)

      Apr 2014 - Apr 2017
      Utilities Supervisor

      In charge of a sugar refinery Utilities department (Operation & Maintenance)(Boiler, steam turbine, compressors and water treatment unit, Gas letdown station).- Lead the Utilities operation team in order to achieve the required output targets with minimum down time.- Improve the power house efficiency based on technical studies and comparison between sugar factories. - Implement new projects to reduce the refinery water ,steam and energy consumption. - Order the required spare parts within a specified budget. - Generate technical reports to top management to assist in proper decision making.(Performance test reports, Root cause failure analysis ,Consumption reports ,Etc...)- Provide solutions to improve the power house cycle efficiency. - Apply latest technologies of Predictive/Preventive Maintenance activities to ensure reliable power house operation.- Waste water management by implementing new project for waste water recovery.- Planning ,scheduling and follow up plant shutdown Activities. Show less

    • Bechtel Oil, Gas, & Chemicals

      Apr 2017 - Feb 2020
      Mechanical Field Engineer (BP - West Nile Delta Project | Bechtel Oil ,Gas &Chemicals)

      My scope in BP-WND project relates to supervision on installation, testing, inspection of Mechanical equipment (Stationary equipment includes heavy lift Vessels ,Heat exchangers ,Gas/hot-oil fired heaters ,Slug Catchers, Re boilers & Rotating equipment includes Gas turbines ,Air fan coolers ,Multi stage pumps and gas compressors).- Perform inspections and documentation of all mechanical work in progress on a continuing basis, and completes the final P&ID checks prior to turnover.- Develop and implement Inspection and Test Plans for mechanical equipment installation and associated activities.- Initiate field change documentation(FCD) and non-conformance reports (NCR) as required by using PTR system.- Maintain overall responsibility for quality of mechanical installations .- Assist supervision and project controls in the preparation of detailed work plans and short-term schedules.- Responsible for the development of mechanical work packages in conjunction with supervision and project controls.- Interpret design and vendor drawings and interface with home office and vendor engineering to resolve design and constructability issues.- Work with procurement and suppliers to ensure compliance with project drawings and specifications.- Prepare field material requisitions for temporary facilities mechanical equipment and some permanant plant materials by using BPS (Bechtel procurement system)- Ensure mechanical equipment preservation.- Establishes and maintains the requirements and tracking system for the execution of preventative maintenance program.- Familiarity with Bechtel Standard Applications (BSAPs) including InfoWorks, TEAMWorks, BPS, PTR.- Completion of as-built documentation for mechanical installations. Show less

    • Bp

      Feb 2020 - now
      Mechanical Engineer (Process safety & Reliability squad)

      Hired directly to bp through IBS.Accountabilities:-Provide daily engineering support to WND project operations production and maintenance teams under the umbrella of BP Global operation organization (GOO).-Review and initiate modifications through Management of Change (MOC) system, to overcome design issues and provide solutions for major production issues. -Lead risk assessments to determine the risk ranking of temporary and permanent design changes to ensure the safety, financial, environmental risks are controlled and risk mitigation actions are addressed to improve safety barriers effectiveness.-Ensure plant production deferrals are documented and preventive actions are implemented to improve plant reliability through OPTIMA system. -Provide technical support for new projects, ensure smooth systems handover from commissioning to operation phase.-Assist in Safety barrier health management assessment, ensure the correct barriers are in place and either the barrier is effective or needs improvement.-Equipment class owner for Safety critical equipment (Pressure relief devices, check valves, boundary isolation valves, fired heaters, piping systems).-CAM (contract accountable manager), where we used to apply business ethical principles through providing bidders equal and fair changes to demonstrate their capabilities and assign successful Vendor or contractor according to certian purchase order conditions and quality requirements.-Conduct various type of fitness for service, as per API 579 part 5 criteria for metal loss assessment.-Conduct technical assessment for piping work using Ceasar II model to assess any design change in the piping arrangement. (flexibility analysis) Show less

  • Licenses & Certifications

    • ISO Category II + ASNT Level II

      Mobius Institute - Reliability Improvement and Condition Monitoring Training
      Dec 2010
  • Volunteer Experience

    • Organiser

      Issued by Bibliotheca Alexandrina
      Bibliotheca AlexandrinaAssociated with Mahmoud El Dakak