Kamran Gul

Kamran Gul

Captain – Field Engineer

Followers of Kamran Gul112 followers
location of Kamran GulPakistan

Connect with Kamran Gul to Send Message

Connect

Connect with Kamran Gul to Send Message

Connect
  • Timeline

  • About me

    Senior Manager (Civil Works) at FWO,Pakistan

  • Education

    • Military College of Engineering, NUST

      1980 - 1982
      Batchelor Civil Engineering First Division ( B +)
    • Government College University, Lahore

      1968 - 1970
      Intermediate
  • Experience

    • Frontier Works Organization

      Nov 1973 - Oct 1975
      Captain – Field Engineer

      Nature of Work• Team Leader of Survey for Road Construction in Hilly Areas in Marri Bugti Agency. • In charge Control Demolition on Construction of Kohlu - Maiwand Road in Baluchistan.• Site In charge on Construction of Road Sui – Dera Bugti.• H R Management and Administration.• Security Officer Camping Area.

    • Pakistan Army

      Oct 1975 - Dec 1979
      Captain – Instructional Duties in Military & Field Engineering

      Nature of Work• Preparation of Training Syllabi and Organization of Courses for Surveyors & Construction Tradesmen at Engineers Centre, Risalpur.• Combat Training to recruits.• H R Management and Administration.• Mechanical Transport Maintenance.

    • Frontier Works Organization

      Jan 1982 - Jul 1983
      Major - Project Engineer

      Nature of Work• Construction of Causeway 300 meters at Thub on Road Bhimber - Iftikharabad for AK Govt.• Development of Housing Scheme for Mirpur Development Authority, AK Govt.• Construction of Pre-stressed Concrete Bridge at Kuliari (Road Kohala - Kuliari) AK Govt.• Survey, Planning and Preparation of PC-1 for Thub Water Supply Scheme, • Survey, Planning and Preparation of PC-1 for Road Kuliari - Azad Pattan - Mirpur.

    • Pakistan Navy

      Jun 1983 - Dec 1986
      Major - Garrison & Project Engineer

      Nature of Work• As Garrison Engineer, at Karachi, I was responsible to maintain naval buildings and services at Karachi, Gawadar, Jiwani and Naval Dockyard. • Repair and Maintenance of Slipways and sea shore structures at Karachi.• Construction of Jetties and Allied Facilities at Gwader.• Construction of Aircraft Pens at Gwadar.• Standing Member for all Siting Boards for Proposed Naval Civil Works in the Fleet Command.

    • Pakistan Army

      Dec 1986 - Mar 1989
      Major- Staff Officer

      Nature of Work• Supervised the construction of Field Fortifications in Border Areas.• As Staff Officer of the Battalion carried out Survey, Planning and Layout of Buildings andFacilities for Proposed Cantonments.

    • Frontier Works Organization

      Mar 1989 - Apr 1992
      Major- Staff Officer in Headquarters FWO

      Nature of Work• Monitoring, Quality Assurance and Periodical Inspections of Projects under execution by FWO.• Preparation and Presentation of Ongoing and Proposed works for D.G. FWO , for Briefings at Cabinet Committee, Ministries, GHQ, NHA and other Clients

    • Pakistan Army - Corps of Engineers

      Apr 1992 - Jul 1993
      Lt Col –Project Manager with Frontier Works Organization (FWO)

      ProjectImprovement & Recarpeting of Runway at PAF ShahbazTime PeriodApril 1992 to July 1993OwnerPakistan Airforce / FWOConsultant DD&C-GHQ, RawalpindiNature of Work• Improvement, Widening and Recarpetting of Runways and Taxiways.• Construction of Taxiway.• Construction of Aprons and Blast Pads.• Construction of Roads, Bridge & Culverts. • Developed a Computer Program for Recarpetting of Runway to Improve its Geometry and Economize on its cost.ProjectConstruction of Road Rateo Dero- Ghauspur, N-55 (NHA)Time PeriodApril 1993 to July 1993OwnerNHA / FWOConsultant Pacific Consultants/ AA AssociatesNature of Work• As Project Manager Designate of Ratodero- Gouspur Section of Motorway, Prepared Item Rates for the purpose of Bidding.• Prepared the Methodology for Execution of the Project• Mobilized the Resources on Award of the Contract. Show less

    • Pakistan Army

      Jul 1992 - Jul 1993
      Corps of Engineers

      WORKED IN THE POSITIONS DESCRIBED BELOW

    • Dynaforce Const Engg Pvt Ltd

      Jul 1993 - Jul 2011

      Projects Undertaken and Completed listed below ProjectConstruction of Khuzdar-Shahdadkot Road Project Sec IV- Contract Package V. Time PeriodFebruary 2010 to June 2011OwnerFWOConsultantACCNature of WorkRock Excavation for Highway Km 121 to Km 122, as per design, upto subgrade level. ProjectNaulang Dam ProjectTime PeriodFebruary 2009 to July 2009OwnerWapdaNature of WorkHired by M/S Marathon Construction Company, Karachi for preparation of bid for Civil Works of the Project Classified ProjectTime PeriodMay 2006 to June 2008OwnerFWOConsultantSPDNature of WorkRock Excavation for Access TracksPortal Excavations. ProjectBhit Pipe Line Project – ENITime PeriodJuly 2007 to December 2007OwnerENI / MarathonConsultantJ. P. KennyNature of WorkTrenching for 10 inch dia gas pipe line in 11 km hard rock. ProjectLakPass Tunnel Project on BOT BasisTime PeriodFebruary 2006 to June 2007OwnerFWOConsultantACENature of WorkExcavation in Rock for South Portal Access Road.Construction of North and South Portal.Drilling and Blasting for Tunnel.Roof Support and Stabilization.Planning and Advisory Services. Classified ProjectTime PeriodJuly 2004 to January 2006OwnerFWOConsultantSPDNature of WorkRock Excavation for Access TracksPortal Excavations. ProjectKarachi Northern By Pass ProjectTime PeriodOctober 2002 to July 2004OwnerNHA / NLCConsultantECI IntlNature of WorkExcavation of rock (150,000 cum) for 4 Lane Portion of the Highway.Construction of Rock Embankment for 4 Lane Portion of Highway (5 Km), up to sub grade level. ProjectRehabilitation and Improvement of Road Mansera-Naran-JalkhadTime PeriodFebruary 1999 to September 2000OwnerNHA / FWOConsultantNESPAKNature of WorkExcavation in Rock and Common Material for 2 Way realigned road in mountainous terrain.Rock Stabilization of slopes in water seepage areas. ProjectConsultancy Services - Kohat Tunnel ProjectTime PeriodNovember 1998 to December 1998OwnerYou One (Korea)Nature of WorkPreparation of Item Rates for Bidding for Tunnel and Access Roads for Kohat Tunnel Project. You One was engaged by Taisai Corporation (Japan) for preparation of the Estimates, and was awarded the contract. ProjectRashid Minhas Fly over Project – KDA, KarachiTime PeriodDecember 1997 to August 1998OwnerKarachi Development Authority / Rail CopConsultantJV Loya Associates-AA AssociatesNature of WorkProject Manager for M/S Rail Cop ( Prime Contractor) on 1.8 Km, 6 Lane Dual Carriageway Flyover on Rashid Minhas – University Road Intersection ProjectConstruction of Additional Carriageway Road Gothhi-Ubaro GOP No 4Time PeriodJuly 1993 to November 1994OwnerNHA / FWOConsultantEngineering AssociatesNature of WorkConstruction of Embankment in Different Sections Approx. 10 Km

      • Managing Director

        Jul 1993 - Jul 2011
      • Managing Director

        Feb 2010 - Jun 2011
      • Managing Director

        Feb 2009 - Jul 2009
      • Managing Director

        May 2006 - Jun 2008
      • Managing Director

        Jul 2007 - Dec 2007
      • Managing Director

        Feb 2006 - Jun 2007
      • Managing Director

        Jul 2004 - Jan 2006
      • Managing Director

        Oct 2002 - Jul 2004
      • Managing Director

        Feb 1999 - Sept 2000
      • Managing Director

        Nov 1998 - Dec 1998
      • Managing Director

        Dec 1997 - Aug 1998
      • Managing Director

        Jul 1993 - Nov 1994
    • FWO, Pakistan

      Aug 2011 - Jul 2012
      Senior Manager

      Project:- Construction of Additional Carriageway- N-55 (Sehwan–Ratodero)Owner:- Government of Pakistan - National Highway Authority (NHA)Consultant:- Nippon Koei (Japan)Position:- Senior Manager at PD Head Quarters, 494 Engineers Group, FWO Project Manager Section 3 ( K.N. Shah to Wagan ) 50 KM Nature of Work• Dewatering and Drying of the Right of Way affected due to unprecedented rainfalls in September 2012, in section 3.• Resuming Stripping, Clearing and Grubbing, Compaction and Embankment Work including Rock Fill Embankment in High Water Table Areas.• Supervision of Structural Works including Bridges, for Sections 2 and 3 (100 Km).• Preparation of Shop Drawings for all Structures for approval by Consultants.• Progress Monitoring and Liaison with Consultants & NHA• Advisory Services to Project Director. Show less

    • FWO,Pakistan

      Aug 2012 - now
      Senior Manager

      Project:- Construction of Nahakki Tunnel (600 m) on Road Ghalanai-Mohmand Ghat (FATA)Owner:- Government of Pakistan and Government of United Arab EmiratesConsultant:- NESPAK, PakistanPosition:- Senior Manager at 496 Engineers Group, FWONature of Work• Preparation of Estimates for Contract Bidding for Nahakki Tunnel.• Project Monitoring of Nahakki Tunnel during its execution phase.• Project Monitoring of Miscellaneous Projects and Site visits to resolve Technical Issues.• Advisory Services to Project Director and Project Managers on Excavation and Stabilization Issues in Tunnels and Ventilation Shafts. Show less

  • Licenses & Certifications

    • Member (Civil 15433)

      Pakistan Engineering Council.
      Dec 1984
    • Member (A/4605)

      Pakistan Institute of Engineers
      Jun 1984
    • B.Sc. Civil (First Class)

      Military Collège Of Engineering-Risalpur, Pakistan (Now Affiliation with NUST)
      Dec 1981