Arun Shetty

Arun Shetty

Tooling Engineer

Followers of Arun Shetty56 followers
location of Arun ShettyChennai, Tamil Nadu, India

Connect with Arun Shetty to Send Message

Connect

Connect with Arun Shetty to Send Message

Connect
  • Timeline

  • About me

    Vice President - Corporate Technology Centre at Tube Investments of India Limited

  • Education

    • B V B College of Engg. & Technology, HUBLI

      1982 - 1987
      Bachelor’s Degree Mechanical Engineering First Class
    • GOVERNMENT TOOL ROOM AND TRAINING CENTRE

      1987 - 1989
      Post Graduate In Tool Design Tools Design and Manufacturing Distinction

      Course on design of Progressive press tool, Plastic molds, Pressure Die casting dies, Jigs and Fixtures

  • Experience

    • Escorts Limited

      Jan 1989 - Jan 1990
      Tooling Engineer

      Tool Room incharge.

    • Bosch India

      Feb 1990 - May 2003
      Manager- SPM Planning and vendor development Engineer

      Worked in various positions ranging from Process Engineering, Planning and purchasing, Vendor development for equipment building and tooling divisions of Bosch, India. These were the constructive years of my competencies in the Machine building and development. Helped in understanding all aspects of machine design, process planning, vendor management and development, Building vendor capability for complete machine design and manufacturing, various machine accessory development like feeding systems, conveyor, electrical cabinets, spindle and slide systems, guarding and fire extinguishing systems, machine packing systems etc. Show less

    • Bosch USA

      Jun 2003 - May 2008
      Senior Purchasing Engineer- Gasoline Systems

      Managed purchasing responsibility for various gasoline system products like Air Mass Flow Sensors, Oxygen Sensors, Throttle control unit, Fuel kit and Transmission control systems. The regions covered were USA, Mexico, Europe, Japan and Korea.The initial tenure of deputation was 3 years and further extended to 5 years. The challenging need to transferring a product line from Anderson, US to Eisenach, Germany was successfully supported in first 3 years with no disruptions and issues to customers (GM,Nissanetc). During next 2 years the main focus was supplier system development and capacity utilisation. Show less

    • Bosch India

      Jun 2008 - Jun 2012
      GM - Industrial Equipment Manufacturing and Assembly

      Part of leadership team for equipment building business of Bosch India. Headed SPM manufacturing responsible for component manufacturing, Assembly, tryout and commissioning of machines, test equipments and assembly lines. Also Responsible for Process planning for machine and tooling components. Also responsible for maintenance of SPM and toolroom machines. Headed a team of 112 employees (32 Engineers and 80 associates). Ex. Transmission gear box assembly line, high speed switch gear components assy and welding equipment, nozzle spray hole drilling spm, aqueous cleaning machine.During these four years apart from building critical machining, testing and Assembly equipments for Auto OEMs and Bosch, we ventured and successfully supplied equipment for electrical component making to a multinational resulting in repeated equipment orders. New systems for Lessons learnt capturing and using in future projects was implemented to avoid repeated mistakes and improve throughput time. Production data management system was implemented to analyse and improve productivity. Show less

    • Tube Investments of India Limited

      Jul 2012 - Dec 2022
      VP - Corporate Technology Centre

      Started and heading Special Purpose Machine (SPM) cell with output doubling every year. Based on the successes in last 3 years, the group's top management is highly appreciative of the SPM teams capability . Hence the division is slated for aggressive growth for up to 2020. The team is responsible for design and development of process, machines and tooling for 5 distinct product divisions of the company. Objective includes developing equipment to process newly developed products and processes, localisation of critical imported machines, providing technological support to SBU teams to achieve operational excellence and provide tooling development support for critical and new projects. Provide equipment sourcing support to SBU’s in terms of vendor selection, concept finalization and prove out of the machine. During last four years, starting from scratch, have groomed and developed a Machine development team including mechanical and electrical system designers, sourcing, assembly and prove-out teams. Have put in place a complete product realization system for Special Purpose Machines/Tooling . The team has designed and executed many high level projects resulting in high order of process capability improvements and process step eliminations there by ensuring high value addition/step and reduce waste. The Machine localization projects have enabled our designers to developed capability to global standards and enabled our businesses to add customized product features without having to depend on outside machine builders. The team was greatly appreciated and rewarded by the company on many occasions for these contributions. Some examples- Designed and installed Tubemills and related critical offline machines for high strength precision tubes, precision and high speed chain assembly machines with inline inspection, Automated lines for inspection of precision fine blanking parts Show less

  • Licenses & Certifications

    • Karass Negotiation Skills I and II in USA

      Karass Creative