HEINCE TANDEPADANG

HEINCE TANDEPADANG

Site Manager

Followers of HEINCE TANDEPADANG299 followers
location of HEINCE TANDEPADANGIndonesia

Connect with HEINCE TANDEPADANG to Send Message

Connect

Connect with HEINCE TANDEPADANG to Send Message

Connect
  • Timeline

  • About me

    QAC Manager at Balfour Beatty Sakti Indonesia

  • Education

    • 1999, Sarjana Teknik – Engineer, Civil Engineering of Hasanudin University, Makassar

      -
  • Experience

    • PT. Cipta Djaya

      Aug 2002 - Jan 2004
      Site Manager

       Assisted in the preparation of billing documents in various on-going projects Assisted in the preparation of pre-qualification documents Planned equipment for rental and project  Communicated setting out control and provide information to assist with the construction of works Evaluated the progress on site against the programme and agreed milestones.  Assisted in preparation of work method and job safety analysis

    • PT. Tamado Isaghy

      Dec 2004 - Oct 2006
      Site Manager

       Coordinating all local activities with the staff Verified the accurateness of the event schedules and reporting any discrepancies  Provided technical support to operation  Managed and allocated Heavy Equipment  Attended meeting which pertains to work progress

    • PT Testkonindo

      Oct 2007 - Jan 2008
      Senior Engineer

       Assisted in the performance of mapping and surveying Planned and allocated equipment Reviewed and assisted in the plan and design of access road, quarry, stock pile, and disposal.  Prepared monthly report including work progress report

    • PT Inco Tbk

      Apr 2008 - May 2009
      Quality Control Inspector

      PT. Inco Shutdown ProjectAs Quality Control Inspector Representative.- Managed planning of Inspection and Test Plan for quality of civil & mechanical jobs- Performed inspection for pre concrete, pre grouting, mechanical fit up and pre welding- As a witness for testing such as: Hydrostatic pressure test; NDT test (penetrate, magnetic test and monitor pre heating and post heating); Alignment of kiln and drier shell, gear and motor; and Bolt Tightening torque- Verified the contractor’s QC report- Prepared quality observation and daily report for performance of quality control- Attended meeting which pertains to quality control Show less

    • PT Perkasa Inti

      Jan 2009 - May 2009
      QC Engineer

      Design, Supply and Install A/C Water Cooling System at Switch Room, PT Inco Process Plan ProjectQuality Control Engineer, PT. Perkasa Inti- Prepared and managed planning of Inspection and Test Plan- Provided Standard technical consultation, QA/QC plan development and recommendation and evaluating effectiveness of total quality competency- Prepared inspection checklist- Assisted in Civil and Mechanical design to provide technical standard- Performed Inspection for pre-concrete, pre-grouting, mechanical fit up, edges preparation for welding work, anchoring, and other inspection related to C/M work. - Supervised and witnessed for testing such as slum test, hydrostatic pressure test, penetrate test, and bolt tightening torque- Prepared quality observation and reports for performance of quality control- Attended meeting which pertains to quality control Show less

    • Kajima-PP JO

      Jul 2009 - Jul 2011
      QAQC Engineer

      Karebbe Hydroelectric Project, 2 x 45MW Power Plant, PT Inco Project.As Quality Assurance/Quality Control Engineer, Kajima-PP J.O.- Responsible of inspection for monolith dam, intake, spillway, power house, plinth, plunge pool, slope or wall protection, dam face membrane installation and tunnel plugging.- Prepared available for inspection (AFI), checklist, approval drawing and specification recruitments prior to inspection in accordance with Inspection and Test Plan (ITP) instruction. - Monitored, verified and reviewed the sub-contractor performance and progress, delivery of materials, daily inspection report, and other pertinent with quality control matters.- Reviewed material certification for project material to ensure it meets project specifications and check that it corresponds to actual material supplied as per the material approval request. - Arranged for inspection by consultant for all activity- Conducted Inspection for the following :Installation of Carpi exposed geo-composite membrane system ; Pre-concrete inspections; Slope stability such as shotcrete, concrete anchor, and rock bolt installation; Various grouting work such as base plate grouting, crack injection, drypack, curtain grout, voids injection; All related building works include second stage concrete and architectural finishing work; Pre welding such as mechanical fit up and edge preparation; Grounding such as rebar tack weld and cadweld joint; Dam instrument installation such as inclinometer, piezometer, temperature thermocouple and crack meter.- Supervised/witnessed for testing such as hydrostatic pressure test, rebound hammer test, taking core drill, NDT, bolt tightening torque, slum test, taking specimen, coating thickness, and mechanical point stressing test.- Monitored the after placing concrete;M onitored the batch plant performance; Identified defect and submitted the work method for repairing.- Prepared quality observation and daily report for performance of quality Show less

    • Leighton Contractors Indonesia

      Nov 2011 - Dec 2013
      QA.QC Engineer

      Engineer - Quality Assurance/Quality Control (Head of Department), PT Leighton Contractors IndonesiaProject: Freeport MSA Project: Design, Supply and Construction of Freeport facilities i.e. Barrack, Warehouse, Terminal and Superblock building. These work all include MEPF, HVAC,MATV and Integrated Security system, Take the following responsibilities:.- Preparation, implementation and maintenance of the Project Quality Assurance Plan.- Reviewed all inspection and testing requirements are fulfilled and work quality is achieved in order to meet client’s requirement as per the contract.- Reviewed all records are completed and compiled for submission to client with regards to completed work quality in order to meet client’s requirement as per the contract.- Reviewed quality of products/supplies/services by sub-contractors meets the specified requirement at source with regard to completed work quality in order to meet client’s requirement as per the contract. - Execute the project-specific QA/QC and Commissioning Plan in a manner that engages all project staff, subcontractors, vendors and consultants.- Supervised and witnessed testing and commissioning carried by subcont and third party for MEPF works i.e. Electrical, Mechanical Piping, Plumbing, Water service h/c, AHU, Air Heater, Fire Hydrant, MATV, Fire Alarm System, VDN.- Coordinated the continuous improvement process in order to meet the company’s internal policies and certification to international standards.- Enforced safe and environmentally friendly working procedures in order to ensure the excellent safety record and encourage employee participation in health and safety matters in order to comply with statutory requirements and HSE expectation.- Performed knowledge sharing in order to enhance the professional development within the organization.- Providing training for project execution personnel concerning the Project Quality Assurance Plan.- Performed QMS and QMS Essential Induction. Show less

    • Balfour Beatty Sakti Indonesia

      Jan 2014 - now
      QAC Manager

      I am presently working with PT Berca Buana Sakti (old name is Balfour Beatty Sakti Indonesia) as QAQC Manager with following project• 5/19 until now on Jawa-1Combined Cycle Gas Turbine Power Plant (1760MW), Cilamaya Karawang• 07/18 until 04/19 on Bungasari Mill Fase #2 expansion Project, Cillegon Banten• 02/16 until 06/18 on Word Trade center #3, High Rise Building Project, Jakarta Selatan• 01/14 until 01/16 on on GT Proving Ground Project, KarawangWith the following general responsibilities:-Head up dept of QA/QC at project-To Lead, Direct and Integrate Quality Systems across the organisation;-To develop and monitor Key Performance Indicators (KPI) across the organisation in accordance with Company and Project requiremets-Set up and develop PQP and ITP-Controlling the presentation and distribution of the company's documentation system to ensure standard and exchange of best practice.-Review all ins & test requirements are fulfilled & work quality is achieved in order to meet client’s requirement as per the contract.-Verify contractor quality requirements are specified to vendors & contractor doc submittals.-Review all records are completed and compiled for submission to client with regards to completed work quality in order to meet client’s requirement as per the contract. -Verifiy Sub-contractor quality requirements are specified to vendors & contractor doc submittals.-Coordinate all quality related correspondence with the customers representatives.-Controlling all achieve doc upon the completion of the project.-Coordinate all the quality site inspections through the site QC insp/Eng-Controll all achieve doc upon the completion of the project.-Controll all NCR & undertook remedial action-Oversight of project close-out & quality reports. Show less

  • Licenses & Certifications

    • Lead Auditor in Quality Management System ISO 9001:2008

      SAI Global
      Feb 2013