Mukesh Kumar

Mukesh Kumar

Electrical lead hand

Followers of Mukesh Kumar614 followers
location of Mukesh KumarCapital Governorate, Bahrain

Connect with Mukesh Kumar to Send Message

Connect

Connect with Mukesh Kumar to Send Message

Connect
  • Timeline

  • About me

    Director Of Engineering at Four Seasons Hotel Bahrain Bay

  • Education

    • Rajasthan University

      2001 - 2004
      Becholers of arts Public Administration

      Wireman License form Electricity Distribution Directorate, Kingdom of Bahrain in 2007OthersValid Driving license issued by General Directorate of Traffic, Kingdom of Bahrain.

    • CIStems School of Computing, Jaipur

      1999 - 2003
      Diploma in Computing and programming DOAECC “O” level and “A” level First Class
    • Govt. Vocational Education Institute, Sirsa

      1996 - 1998
      Diploma in Electrical Maintenance and Repair Technology First Class
  • Experience

    • Alkomed Engineering Services W.L.L., Potline 5 Extension ALBA

      Aug 2004 - May 2005
      Electrical lead hand

      In ALBA Pot Line 5 Extension Project Alkomed had few Systems to complete as MEP contractor. I was hired by Alkomed as an Electrical lead hand. There I was responsible for Installation of Cable trays, trunkings, conduiting, wiring, cable pulling and cable termination .After completion of this project I was transferred to BWTC where Alkomed was responsible for MEP Builder's work until EMJV was appointed as MEP Contractor.

    • Mercury Middle East W.L.L., Bahrain World Trade Center

      May 2005 - Jun 2007
      Electrical Supervisor

      Site Supervisor on a site with various nationalities, ensuring all aspects of the installation are carried out efficiently, safely & in accordance with the working schedule. As it was the construction of Bahrain's tallest building i deal with installation of vertical electrical services like Cable racks, tray, Bus Bars, cable pulling in vertical shafts etc. I deal with design queries on drawings & complete take offs to ensure the job has the relevant materials to make sure productivity levels remain & the completion of site inspections. Also I deal with all aspects of paperwork from design queries on drawings & Site, completing submittals then creating single line diagrams from the electrical drawings for installation & completing completion test certificates whilst liaising at all times with the client & suppliers. Show less

    • Mercury Middle East W.L.L., Arcapita bank headquarters

      Jun 2007 - May 2010
      MEP Coordinator

      On the above building in overall charge of the coordination of MEP services with other trades i.e. civil, interior etc. I was moved from Bahrain World Trade Center, Bahrain to this Project as Electrical supervisor but after a year I was promoted as MEP Coordinator because of my interest & good knowledge Mechanical & Plumbing services. As I came on this project at initial stage, I was fully involved in site mobilization, design, estimation, installation, testing & commissioning of various MEP Systems as described below:Under ground drainage, Water services, electrical Ducting, Electrical Earthing & lightning protection works. MEP builder's Works requirements like concealed Electrical, Plumbing Pipings & opening for MEP installations.Complete Electrical Take offs & Variation take offs for this Project. Offloading, moving & positioning of Heavy MEP equipments like Generators, chillers, transformers, Pumps, tanks, electrical panels, AHUs etc.Installation of MEP First Fix like Conduiting, cable racks, trays, trunking, cable Pulling, wiring, termination, installation of MS piping for HVAC & fire fighting, installation of PVC, HDPE, PPR & Copper pipe for water supply & drainage systems.Installation of MEP Second Fix Like Lighting, Wiring accessories, Security equipments Sanitary fixings, Grills, Diffusers.Assisting Commissioning team in Water & Air balancing, Electrical testing & commissioning. Show less

    • Cebarco - WCT W.L.L.

      Aug 2010 - Jan 2012
      Senior MEP Coordinator

      MEP Coordinator on Hotels construction responsible for MEP installations and duties are as described below:Attends and organize all site meeting with the engineer / Consultant for MEP and also Primary contact for JV partners and vendors for MEP works.In charge of following up of the MEP related changes, additional works as well as claims in accordance with the established procedure of the contract.Responsible for the analysis of works performed ( monthly report - final report) and the assessment of consequences where neededGive the proposal for allocation of sub-contractor to the Project Manager & Assists the CM in preparing the monthly reports.Preparing punch lists, snagging & Handing Over of MEP installations room by room floor by floor. Coordination of MEP services with other construction trades i.e. clashes of MEP with ceiling, furniture, kitchen & Laundry Equipments etc. Coordination of MEP first fix & Final fix installations for Kitchens, Bars, Spa, Pool, Laundry which includes various systems like Steam, LPG Gas, Jacuzzis, hydro sorbs kitchen hoods, washers, dryers, Pressing units etc. Mercury Bahrain Show less

    • Six Construction Company Ltd.

      Jan 2012 - Oct 2014
      Senior MEP Engineer
    • Four Seasons Hotel Bahrain Bay

      Nov 2014 - now
      • Director Of Engineering

        Aug 2017 - now
      • Assistant Director of Engineering

        Nov 2014 - Jul 2017
  • Licenses & Certifications

    • Psychological Safety: Clear Blocks to Innovation, Collaboration, and Risk-Taking

      LinkedIn
      Jun 2021
      View certificate certificate