Naresh Menaria

Naresh Menaria

Supervisor

Followers of Naresh Menaria699 followers
location of Naresh MenariaChittorgarh, Rajasthan, India

Connect with Naresh Menaria to Send Message

Connect

Connect with Naresh Menaria to Send Message

Connect
  • Timeline

  • About me

    Sr. Manager at Birla corporation Ltd.

  • Education

    • Rajasthan Vidyapeeth

      -
      Bachelor’s Degree Mechanical Engineering Ist
    • CTAE udaipur

      -
      Diploma in Mechanical Engineering Mechanical Engineering Ist
  • Experience

    • MM Engineering Works - India

      Feb 1998 - Jan 1999
      Supervisor

      Position: SupervisorDuration: 01Feb.1998 to16 Jan. 1999 • Quality control and operation planning of M/C shop • Planning of fabrication shop• To maintain Quality checking of Welding and dimension of fabrication shop

    • G.G.valve Pvt.Ltd.

      Jan 1999 - Sept 2002
      Production Engineer

      Position: Production EngineerDuration: 18 Jan.1999 to10 Sept. 2002 • Planning of Operation and work distribution of Machine shop • Routine Maintenance and major overhauling of different machine as well as also attend break down maint. • To maintain Quality checking component of different valve with different measuring eqpt. Also checking assembly sec. and testing sec. quality

    • J.K. Cement Limited

      Sept 2002 - Jul 2018

      25 MW TPP :- • 110 TPH CFBC Boiler with single drum ,make – Thermax Ltd., working Pr. 109Kg/cm² and temper-ature 545+/-5°C and designed for multi fuel • Turbine Supplied by Green Sol Power Systems Ltd. from HTC China. • Condenser-Air Cooled Condenser.(Make- Thermax- SPX)• Ash handling system- macgale Pvt Ltd• Coal handling system –70TPH (Bevcon Wayors Pvt ltd) 10 MW WHRB : -• 4 No’s Boilers (02 PH Boiler and 02 AQC Boiler) make –Thermax Ltd• Turbine Supplied by Green Sol. from HTC China. Rating of Turbine 10 Mw. • Condenser - Water Cooled.(Make – Thermax- SPX) 25MW Captive Power plant & 10MW WHR• Role : Project (Erection and Commission) 25MW CPP & 10MW WHR• Operation & Maintenance• Company: J. K. Cement works, Mangrol Show less 22 Mw Thermal Power Plants & 15 Mw Waste Heat Recovery Power Plants. • Role : Erection and commissioning of 25MW CPP & 10MW WHR• Operation & MaintenancePeriod : July 2005 to April 2013 Plant Details: 22 MW TPP :- • 89 TPH AFBC Boiler with single drum ,make – Thermax Ltd., working Pr. 88Kg/cm² and tempera-ture 515+/-5°C and designed for 70% pet coke & 30% Indian coal • Turbine Supplied by Green Sol Power Systems Ltd. from HTC China. 15 MW WHRP : -• 5 No.s Boilers from all 4 Preheaters of kiln & 1 from Clinker Grate Cooler of Kiln. • Turbine Supplied by Green Sol Power Systems Ltd. from HTC China. Department: Diesel power plant (14 Sept. 2002 to July2005)• Operation, Maintenance (Break down & schedule maint.) & overhauling of 20MW DG set (02X4MW Fuji, Japan made & 02X6MW Sulzer, Poland made).• Maintenance of Engine Auxiliary such as Separators, Pump, Heater, Coolers, Cooling tower, Filter & Valves.• Arrangement of spare part & Inventory of DG sets. Show less

      • Deputy Manager

        Apr 2013 - Jul 2018
      • Senior Engineer

        Sept 2002 - Apr 2013
    • Birla corporation Ltd.

      Aug 2018 - now
      • Manager

        Aug 2018 - now
      • Sr.Manager (TPP & WHRS)

        Aug 2018 - Dec 2023
    • RCCPL

      Dec 2023 - now
      HOD Power Plant-WHRS

      Power Plant - Cement 3

  • Licenses & Certifications

    • Internal Auditor for ISO 9001, ISO 14001, OHSAS 18001 and ISO 50001

      LRQA
      Jan 2016
    • B.O.E.(Boiler Operation Engineer)certificate

      Boiler Operation Engineers Baoard, Karnataka
      Feb 2013
    • Auto CAD Design

      Infopark udaipur
      Jan 1999