Sarath Syam

Sarath Syam

Mechanical Engineer

Followers of Sarath Syam103 followers
location of Sarath SyamTanur, Kerala, India

Connect with Sarath Syam to Send Message

Connect

Connect with Sarath Syam to Send Message

Connect
  • Timeline

  • About me

    Mechanical engineer

  • Education

    • Department of Mechanical Engineering at Federal Institute of Science And Technology

      2010 - 2014
      Bachelor of Technology - BTech Mechanical Engineering
  • Experience

    • Nasser Bin Ali Al Thani Contracting Company

      Feb 2015 - May 2017
      Mechanical Engineer
    • Premier International Projects LLC

      May 2017 - now
      MECHANICAL ENGINEER - PIPING

      I have been working as Mechanical engineer in various specific roles of QC Engineer, Mechanical engineer etc in different projects.

    • M/s Premier International Projects LLC

      Jun 2017 - Jan 2023
      Mechanical Engineer

      Worked as an In-charge of fabrication & erection of pipe spools (CS, SS, GRP. PP, HDPE),Rotary/Static Equipment’s installation & alignment inspection Prepared P&ID’s, Isometric Drawings, Structure Drawings & Plan Drawings Conducted incoming material inspection, inspection of fit-up, dimensional verification & weldvisual inspection, verification & monitoring of pre-heating, post heating and post weld heattreatment, hardness test, and NDE Coordinated NDT activities with third party NDT companies and RT film interpretation,Witness Pressure test (Hydro Test & Pneumatic Test) of prefabricated Pipe Spool, erectedspools, reinforcement pad, valves, PRVsWorked as a mechanical engineer in rolling shutter & steel door fabrication division, costing,planning, production & installation, maintenance works in various running plantPrepared MAS for mechanical package items & material inspection report and verified all therelated documents Planned & executed piping activities & installation activities related to process & fire fighting Performed installation, testing & commissioning of air compressor system, process, domestic& fire water system, ETP, chiller, cooling tower, rain shower LPG & Co2 system Prepared test package and attached all the necessary documents and review if required Performed the line checking pre-test punch, punch ‘A’, ‘B’, ‘C’ clearing and field changeIsometric drawing verification of the actual orientation of a pipeline construction with regardsto the line list of a package prior to hydro testWorking on coordination of MEP works, installation of sanitary fitting, pump installation,testing & commissioning, coordination of HVAC works, LPG service, kitchen equipment &final handing over of project Managing activities right from the conceptualization stage to the execution, involvingfinalization of technical specifications, procurement, erection, testing & commissioning, sitemanagement, manpower planning Show less

  • Licenses & Certifications

    • CSWIP 3.1 WELDING INSPECTOR

      TWI
      Jan 2020