Ramil Ibragimov

Ramil Ibragimov

Polypropylene/LPG Plant : LPG Gas Utilization / Production,Polymerization - DCS/Process Technician

Followers of Ramil Ibragimov866 followers
location of Ramil IbragimovMexico

Connect with Ramil Ibragimov to Send Message

Connect

Connect with Ramil Ibragimov to Send Message

Connect
  • Timeline

  • About me

    Direct Pipe, HDD&Tunneling Mud Engineer [open to new work and opportunity]

  • Education

    • SCOMI Oiltools GRTC Training Center 2009, Malaysia KL

      2009 - 2010
      DWM & SC Engineering Relation Solids & Treatment in Drilling Fluids
    • College of Science & Technology Turkmenbashy,Turkmenistan

      2002 - 2003
      IT Technician Computer Science and Engineering
    • Oil&Gas Refinery Technical College Turkmenbahy,Turkmenistan

      2001 - 2002
      Polypropylene Production Plant - DCS/Process Technician Chemism of Polypropylene Plant Production
    • Marine Technical College Turkmenbashy,Turkmenistan

      1995 - 1999
      Navigator Marine Navigation
    • High-School

      1985 - 1995
    • Tula State University

      2012 - 2017
      Bachelor of Science (BSc), Mining/Civil Engineering Construction
  • Experience

    • TNPZ Oil&Gas Refinery Turkmenistan

      Mar 2000 - Jan 2005
      Polypropylene/LPG Plant : LPG Gas Utilization / Production,Polymerization - DCS/Process Technician

      Technical Process of LPG Gases (like Butane, Propane, Propylene), Chemism of Process, Gas Purification and Treatment, Property, Propylene Recovery, Degasation, Chemical Applications. DCS (Distance Control System) operation. Storage and distribution of LPG.

    • Transocean

      Jan 2005 - Oct 2005
      Transocean Offshore Deep Drilling - Deckpusher T-20

      All deck daily operation, uploading&offloading stanby boats,assisting drilling crew on daily basis drilling operation, managing works during rig moves and helicopter crew change etc.

    • SCOMI Oiltools Ltd.

      Oct 2005 - Jun 2010
      DWM/SC Engineer in Drilling Fluids, ScomiOiltools Ltd Malaysia

      All DWM&SC Equipment’s installation,running&maintaining. Crew supervision, drilling mud maintaining and treatment.

    • Tatco International Boring and Installation LLC, HDD&Tunneling, Peru South America

      Jun 2010 - Jan 2013

      HDD Engineering planning and drilling,HDD Crew field Supervision. HDD Fluids Engineering planning etc. HDD Fluid & DWM planning and treatment, crew supervision and managing, HDD Drilling planning and engineering for single shot of 2800m/32''SP, for pipeline safe installation with total pipeline weight of 1045 tons.

      • HDD Drilling Fluid & DWM Engineer, TATCO HDD'Horizontal Directional Drilling

        Nov 2011 - Jan 2013
      • HDD Drilling Fluid & DWM Engineer, TATCO HDD'Horizontal Directional Drilling

        Jun 2010 - Oct 2011
    • HDD INPAVIANCA Ltd, Venezuela South America

      Feb 2013 - Oct 2013
      HDD Engineer, HDD Drilling Fluid & DWM Engineer

      HDD Drilling Engineering & Planning. Crew field supervision and management. HDD Fluids Engineering planning etc.

    • HDD&Tunneling Mizat Al Khaleej Damam,KSA

      Jan 2014 - Apr 2015
      HDD Engineer, HDD Fluid & DWM Engineer

      HDD Planning, HDD Drilling planning and engineering for save drilling and pipe installation. Managing field HDD site operation and field crew supervision. Managing HDD Drilling Fluid planning and treatment for HDD projects.

    • Heliopolis Electric

      Mar 2017 - Mar 2018
      HDD Mud Engineer/Supervisor

      NDRC works supervision, pre-drilling preparation, bore design, drilling program, save service line installation, troubleshooting torque and force during drilling and pulling/ service line installation.Safety Coordinator on site as well during preparation and works process till the end of the project

    • Global Tunnelling Experts

      Mar 2018 - Sept 2019
      HDD, Direct Pipe&Tunneling Fluids Engineering, Mud Engineer
    • Herrenknecht AG

      Apr 2018 - Aug 2018
      Direct Pipe, HDD&Tunneling Mud Engineer

      Client: HDI Latam/ GDI MexicoProject: Direct Pipe Sea Outfall " Sur De Texas - Tuxpan" Pipeline, TransCanada.Country : MexicoMachine type: AVN 1200 (M-2250M) HK-500PTPipe Diameter: 56'' PipelineTunnel Length: 800m Max. Push force: 100-120t

    • ADNOC Drilling

      Mar 2020 - now
      Field Service Technician

      ADNOC IDS Drilling Fluids Completion-OFS,SCE Centrifuges Operation

  • Licenses & Certifications

    • Confined Space

      Transocean
      Feb 2006
    • Slinger/Banksman

      Transocean
      Oct 2005
    • HSE OJT

      Transocean
      Aug 2005
    • DWM/SC in Drilling Fluids

      Scomi Group Bhd
      Nov 2009
    • Volunteers Management

      USAID
      Jun 2003
    • Helicopter Safety Awareness

      Transocean
      Feb 2006
    • Pressure Test Awareness

      Transocean
      Feb 2006
    • DitchWitch HDD Course

      Ditch Witch
      Jul 2017
    • HAZMAT

      Transocean
      Feb 2006
    • Implementation Informational Resources of Internet

      USAID
      Jul 2003
  • Volunteer Experience

    • Teacher&Instructor of Internet Resource Centre

      Issued by USAID on Jan 2003
      USAIDAssociated with Ramil Ibragimov