Rohit Barua

Rohit Barua

Summer Research Intern

Followers of Rohit Barua1000 followers
location of Rohit BaruaKolkata, West Bengal, India

Connect with Rohit Barua to Send Message

Connect

Connect with Rohit Barua to Send Message

Connect
  • Timeline

  • About me

    Deputy Manager @Schneider Electric | ME'23 @NIT Dgp

  • Education

    • D.A.V. Public School, Kolkata

      2008 - 2018
      88% in 12th

      Activities and Societies: Sports Captain, House Vice Captain

    • National Institute of Technology Durgapur

      2019 - 2023
      Bachelor of Technology - BTech Mechanical Engineering 8.31
  • Experience

    • Jadavpur University

      May 2021 - Sept 2021
      Summer Research Intern

      "An empirical examination/investigation of technical and managerial factors for the adoption of Electric Tractors in rural India"

    • CESC Limited

      May 2022 - Jun 2022
      Trainee

      Areas of training includes BOILER and it's types, Equipments of Boiler (Economiser, Boiler Drum, Riser and Downcomer, Furnace, Burners, Superheater, Reheater, Air preheater, Cyclone Separator, ESP, Hopper, Soot Blower, Stack), Safety Valve, Steam Turbine, Electric Generator, Demineralization (DM) Plant, Coal Handling Plant, Wagon Tippler.This training helped me to gain a knowledge on how a THERMAL POWER PLANT operates and the different types of equipments used.

    • Durgapur Steel Plant

      Jun 2022 - Jun 2022
      Summer Trainee

      Areas of training includes exposure to - 1. Raw Material Handling Plant (RMHP), 2. Sinter Plant, 3. Blast Furnace (BF) operation, 4. Sheet Melting Shop(SMS) and Continuous Casting Plant (CCP), 5. Merchant Mill, 6. Wheel and Axle Plant, 7. Medium Structural Mill (MSM) and 8. Central Engineering Maintenance (CEM).

    • Schneider Electric

      Jan 2023 - now

      ● Pioneered a cost optimization project, achieving annual savings of ₹60 lakhs through material optimization.● Resolved a critical customer complaint about a safety feature, enhancing customer satisfaction and trust.● Redesigned an assembly process, achieving annual cost savings of ₹4 lakhs and reducing manufacturing lead time by 20 days.● Collaborated with cross-functional teams to ensure a seamless brand transition, driving alignment across stakeholders and minimizing disruption.● Utilized FTA & DFMEA to implement proactive risk management, reducing the Risk Priority Number from 280 to 10 through Poka-Yoke in the design process.● Redesigned a component that improved ease of assembly while eliminating the risk of finger injuries during the assembly process, enhancing workplace safety and efficiency. Show less

      • Deputy Manager

        Apr 2024 - now
      • Graduate Engineering Trainee

        Sept 2023 - Mar 2024
      • Internship Trainee

        Jan 2023 - Aug 2023
  • Licenses & Certifications

    • Catia V5

      TECHHUB SOLUTIONS
    • Digitalisation in the Aerospace Industry

      Technical University of Munich
      Mar 2021