Varun Sai Reddy Pagidela

Varun Sai Reddy Pagidela

HVAC Design Engineer

Followers of Varun Sai Reddy Pagidela832 followers
location of Varun Sai Reddy PagidelaGurugram, Haryana, India

Connect with Varun Sai Reddy Pagidela to Send Message

Connect

Connect with Varun Sai Reddy Pagidela to Send Message

Connect
  • Timeline

  • About me

    Sr.Engineer Technical Development & IGBC-AP

  • Education

    • Sri Chaitanya childerns academy

      2006 - 2007
      High School 10th 10th

      Activities and Societies: sports

    • CMR Institute Of Technology

      2011 - 2015
      Engineer’s Degree Mechanical Engineering

      Activities and Societies: sports

  • Experience

    • McD Built Environment Research laboratory

      Jul 2015 - Feb 2017
      HVAC Design Engineer

      Design of HVAC systems- Designed HVAC systems based on centralized cooling and heating, VAV air distribution systems, constant air volume, VRF / VRV system DX-Split system while maintaining the indoor air quality. - Designing of ventilation systems for industrial Kitchens, basements, staircase pressurization systems etc.- Making the cooling load calculations for HVAC Systems, Static pressure calculations, Pump head calculations for Pumping systems (Distribution & circulations) based on software and Manual calculations, as required by the project submissions documents.- Carrying out correspondence / negotiations with vendors/suppliers for procurement of HVAC material & equipment.- Preparation of the “Tender Document” including “Specifications”, “Schedule of Equipment”, “Bill of Quantities” & Engineer’s cost Estimate. Show less

    • LEAD Consultancy and Engineering services (India) Pvt Ltd

      Mar 2017 - Nov 2018
      HVAC Design Engineer

      • Managed load calculations, equipment selection.• Site supervision of Mechanical Services to ensure Quality assurance works and executed works is in accordance with design intent and provide solutions.• Ongoing coordination issues among various trades.• Performed site surveys as well as produced system evaluation reports and recommendations.• Designed various systems like centralized chiller plant, VRF / VRV system & DX-Split system based on loads.• VAV and constant air volume for air distribution system. • Calculated air changes and ventilation requirements based on standards & requirement.• Highest efficiency performance of the system while maintaining the indoor air quality. • Basement ventilation smoke exhaust compartmentalization as per NBC 2016 .• Heat load calculations with HAP 5. Show less

    • Larsen & Toubro

      Dec 2018 - Jun 2022
      Assistant Engineering Manager - HVAC

      •Estimation of Thermal loads by using HAP software.•Design, selection & installation of Air conditioning and Ventilation systems. •Interface with Electrical, Plumbing, Fire protection and Alarm systems.•Responsible for of technical documentation like Electrical load list, Fresh air calculation, AHU static pressure and Pump head calculations.•Lift lobby, Lift well & Staircase pressurization calculations.•Design of Chilled water and Air balance schematics.•Preparation of ducting and piping layouts.•Technical documents review & approval.•Preparation of Good for Construction drawings as per site conditions.•Modification and Up-gradation of existing building design works. Interface of new installations with existing building services.•Site supervision of Mechanical Services to ensure Quality assurance works and executed works is in accordance with design intent and provide solutions.•Ongoing coordination issues among various trades.•Estimation of Thermal loads by using HAP software.•Design, selection & installation of Air conditioning and Ventilation systems. •Interface with Electrical, Plumbing, Fire protection and Alarm systems.•Responsible for of technical documentation like Electrical load list, Fresh air calculation, AHU static pressure and Pump head calculations.•Lift lobby, Lift well & Staircase pressurization calculations.•Design of Chilled water and Air balance schematics.•Preparation of ducting and piping layouts.•Technical documents review & approval.•Preparation of Good for Construction drawings as per site conditions.•Modification and Up-gradation of existing building design works. Interface of new installations with existing building services.•Site supervision of Mechanical Services to ensure Quality assurance works and executed works is in accordance with design intent and provide solutions.•Ongoing coordination issues among various trades. Show less

    • Tabreed India

      Jul 2022 - now
      Sr.Engineer Technical Development
  • Licenses & Certifications

    • Competency Certification in Decision Making

      L&T ATLNEXT
    • Continuous Learning for Excellence

      L&T ATL NEXT
    • Mini MBA

      Swiss e learning institue
      May 2014
    • IGBC-AP

      CII - Indian Green Building Council (IGBC)
  • Volunteer Experience

    • Coordinator Of Volunteers

      Issued by lets spread love on Dec 2016
      lets spread loveAssociated with Varun Sai Reddy Pagidela
    • Volunteer

      Issued by Being social on Jan 2018
      Being socialAssociated with Varun Sai Reddy Pagidela