Karthikeyan Krishnan

Karthikeyan Krishnan

Site Supervisor Civil

Followers of Karthikeyan Krishnan443 followers
location of Karthikeyan KrishnanCoimbatore, Tamil Nadu, India

Connect with Karthikeyan Krishnan to Send Message

Connect

Connect with Karthikeyan Krishnan to Send Message

Connect
  • Timeline

  • About me

    Manager @ Nippon Koei India Pvt. Ltd

  • Education

    • Anna University Chennai Area , Inia

      2007 - 2010
      BE Civil Engineering Civil Engineering 72 %

      Worked In the College Design and Consultancy Services at the Evening Hours.

    • Ramakrishna Mission Vidhyalam , Coimbatore

      2003 - 2005
      Diploma In Civil Rural Techonology Civil Engineering 94%

      Graduated with Honors was the Second Rank Holder in the Batch 2003-2005.

  • Experience

    • Saraswathi Engineering Construction Pvt Ltd

      May 2005 - Jun 2007
      Site Supervisor Civil

      Project Details : 420 Quarter Construction for CRPF AvadiClient : CPWDNature of Experience: Construction of 420 Quarters for CRPF Avadi. I was in charge of Six Block write from the site clearance to finishing. Works relevantly executed in each block. One block consists of 14 quarters one BHK. Cast in situ pile hand bore with single bulb up to a depth of 3.5m with single, double, triple, six pile group pile cap foundation. Along with pile load testing. The work also includes planning and execution. All other works related towards completion including finishing.• Worked as Site Supervisor in V.G.V. Construction Pvt Ltd. (May 2005 – September 2005) Individual housing. I was in charge of two buildings one 2BHK, and 3 BHK. The work also includes planning and execution. • Worked part time in College for the structural design and planning Work involved Portal frame analysis with the help of Stadd Pro. Preparation of plot plan and Structural Drawing for the same. Going out in the field for SPT Test and Surveying. Show less

    • Thyssenkrupp Industries India Pvt Ltd

      Jun 2010 - Nov 2011
      Technical Assistant Civil

      Project Details : 2x600 Mega Watt Thermal Power Plant – Construction of Coal Handling Unit Client : Coastal EnergenConsultant : TCENature of Experience: Design and Construction of Coal Handling Unit For 2x600 Mega Watt Thermal Power Plant. Power plant 2x48 Megawatts captive power plant In India Cements from July 2010 to January 2011.• I was in charge for the monitoring Water treatment plant unit, Cooling Tower and ACC Building. Got Deputed in Tuticorin 2 X 600 Megawatts Mutiara Thermal Power Project. • Our company deals with Coal Handling unit in this Project my responsibility held there is to monitor the civil work.• Provided necessary guidance in precedence of the work.• Make sure everything is executed as per the plan by Compiling data of both mechanical and the civil drawing.• Also monitor the site activities such that they go as per scheduled.• The Coal Handling Unit Comprises of the following Structures Track hopper, Conveyor Tunnels, Ground Conveyor, Conveyor trestle, Pent House, Crusher House, Stacker Cum Reclaimer, Junction Towers, Drive houses, Machine control room and Cable routing Trestle. Show less

    • Afcon Construction

      Dec 2011 - Oct 2014
      Site Civil Engineer

      Project Details : Design and Construction of Under Ground Station for Chennai Metro Rail.Client : CMRLConsultant : EMBY Nature of Experience: TOP DOWN METHOD OF CONSTRUCTION FOR THE UNDER GROUND STATION Main part of the job is to study the general notes and with respect to it see that work is executed as denoted. Correlate the Design Drawing with all Mechanical, Electrical, and Plumbing work accordingly. Guide Wall Construction. Looking after D- Wall Cage Fabrication for High Court Station. Construction of Diaphragm wall starting from grabbing, cage lowering and finally concreting the same. Preparation of RFI and Documentation related to rebar Fabrication and casting the same. Execution of all the level slabs namely Roof, Concourse and Base Slab (Which includes the preparation of area tying the rebar as per drawing and getting approval of the same with the Client for concreting.) Also maintain a good relation with both client and contractor to get the work done smoothly and properly. Preparation of Reconciliation statement and billing for the sub contractor. Verify the drawing received in site as per the design drawing and then distribute it to the sub contractor for execution and also monitor the same closely. Bring out our innovative ideas to fasten up our work and also get subjections from the experts to expedite the work. Monitor the time scheduled and work accordingly and stick to the time frame. Show less

    • ALYSJ JV GOLD Line Metro

      Nov 2014 - Dec 2017
      Site Engineer

      Project Details : Design and Construction of Under Ground Station for Qatar Metro Rail.Client : Q-RailNature of Experience: BOTTOM UP METHOD OF CONSTRUCTION FOR THE UNDER GROUND STATION Prior to the start of the works we need to coordinate with all the relevant Authorities to check for any services in side our premises If any found need to get the clearance and Divert if Required and Protect them Prior to start Works. Utility Identification and Diversion of the Same in Accordance to the Structure location and Design Approval from the Authorities. Main part of the job is to study the general notes and with respect to it see that work is executed as denoted. Correlate the Design Drawing with all Mechanical, Electrical, and Plumbing work accordingly. Preparation of all the relevant IRE (Inspection Request) and Relevant Documentation Works and Co-ordinate them with the QC and Document Control Team through Aconex. Execution of all the level Base Slab, along with the relevant structures (Which includes the preparation of area tying the rebar as per drawing and getting approval of the same with the Client for concreting.) Also maintain a good relation with both client and contractor to get the work done smoothly and properly. Once the Structural Works are Executed as per the DWG then closed the IRE check the Sub –Contractor Billing Quantity if Applicable. Show less

    • CMRL - Chennai Metro Rail Limited

      Dec 2017 - Dec 2021
      Site Engineer
    • AECOM

      Mar 2019 - Dec 2021
      Senior Engineer
    • Nippon Koei Co., Ltd

      Nov 2021 - now
      Station Engineer
  • Licenses & Certifications

    • UPDA

      Engineering and Consulting Offices Accrediting Committe ; Qatar
      Dec 2016