    Senior Project Manager @ MARC SURFACE COATINGS PRIVATE LIMITED | Mechanical Engineer, Project Management

  • Education

    • I.A.C.R. Engineering College , Rayagada.Orissa

      2004 - 2008
      Bachelor of Technology (B.Tech.) Mechanical Engineering 1st

      ). Project on “THERMAL POWER PLANT”.b) Project done on “MANUFACTURING ON PORTABLE -VICE” under the guidance On “CENTRAL TOOL ROOM AND TOOL DESIGNING(CTTC)”, Rayagada, Orissa.c) Seminar present on “ROBOTICS & MECHATRONICS” on state level(Orissa).d) Seminar present on “ROBOTICS AND ITS EFFECTORS” in college level Competition.e) Seminar present on “NUCLEAR POWER PLANT”.

  • Experience

    • S.M.ISLAM AND SON

      Aug 2008 - Feb 2011
      SITE ENGINEER (MECHANICAL)

      1) Design and detail engineering of different parts and of Boiler such as : Structural Parts :- Boiler Framings, Top suspension Members, Fire Burners ,Flues & Ducts, Galleries & Ladders, Buckstays and Overturning Posts, Sling Supports, Chimney, Base Plates etc. 2) Estimations as required.3) 2* 75 TPH Boilers.4) Refractory and Insulation of 2*75 TPH Boilers.5) Studying drawings, plans or patterns of structures.6) Maintaince of heay machinery( cranes,hydra).7) Execution works like billing, checking B.O.M. ,checking & verification of drawings as per sequence. 8) Men power Depolyment, Equipment development, Fabrication & Erection planning for future prospects.9) Types of refractory such as Tatacast AH-50, FH-45, FH-70, FH-14, AH- 70 and AH-60.10) Types of insulation such as Rockwools Blanket, Red clay and Glass Mineral Wool. Show less

    • Thermax

      Feb 2011 - Nov 2012
      PROJECT ENGINEER (MECHANICAL)

      a) Fabrication & Erection of mechanical structures. b) Studying drawings, plans or patterns of structures. c) Maintenance of the heavy machinery ( cranes, Hydra) d) Execution works like Project Schedule, Billing, Checking B.O.M., Checking & Verification of Drawings as per Erection sequence. e) Men Power Deployment, Equipment Development, Fabrication & Erection Planning for future prospects f) Erection Of Boilers with the Mechanical Structural Works. g) Design and Detail engineering of different parts and of Boiler such as : Structural Parts :- Boiler Framings, Top suspension Members, Fire Burners ,Flues & Ducts, Galleries & Ladders, F.D Fan ,I.D. Fan, Expansion cum Deareator Tanks and Chimney ( Steel Structure). h). Erection of different type of Utilities Boiler such as Steam Generators , Hot Water Generators, Thermic Fluid Heater, Furance, Heat Exchanger with APH with Hopper, Cyclomax with Hopper, Feed Water Pump, I.D. Fan, F.D Fan and Chimney. i) All Balance of Plant (B.O.P) works. k). Refractory & Insulation also. l) Making the Balance Of Quantity (B.O.Q) of the material. m). Manage the Client as well as Contractor & Sub- Contractors. n). Estimation as required. o). Erection of different size of Steam Pipeline and Thermic Fluid Pipeline. p). If required drawn ISOMETRIC drawing on site also. q). Hydro test of the Boiler. r). Pneumatic Test of different size Thermic Fluid Pipeline and Steam Pipeline. s) Making Project Schedule, compressed the Project schedule according the Client and responsibility. t). Maintain WPR, DPR and Near Miss Report with maintaining all Safety Precaution. u) Erection and Commissioning Show less

    • PARKER ENGINEERING (INDIA) PVT LTD.

      Dec 2012 - Nov 2015
      Asst. Manager (Mechanical)

      a). Design & Detail engineering.b) Installation of Pre-Treatment and Electro deposition Equipment.c) Paint Shop Engineering.d) P.T and E.D Tank and its Enclouser. e) Fabrication and Inspection of different types of Tank.f) . Quality Inspection.g). Installation of all the PT and ED equipment. i). Day to day meeting with client and Vendor.j). Make Fabrication report, Weekly Work Report, 15 Day Schedule and Daily Work Schedule.k). Tank Leakage Test and then rectify it and also make the report and submitted to Client.l). DP Test of the welding and make the excel sheet report.m). Maintain 5’S and 4’S in Paint Shop and maintain Safety.n). Installation and Maintenance in Bumper Paint Shop.o). Modification of Oven Chamber.p). Installation and Operation of the Spray Nozzle .q). Installation and operation of Chiller . r). Operation of Electro Depositing (ED)s). Installation Dorken Painting Plant. Show less

    • MULTI ENGINEERING SERVICES

      Nov 2015 - Apr 2017
      Manager (Projects & Design)

       Preparation of Daily Progress Report/ Work Schedule. Executing with Procurement department for various materials requirement at site. Preparing work list for individual unit as recommended by inspection, operation & project. Design and Installation of NG/LPG Pipeline. Design and Installation of Compressed Air Pipeline. Design and Installation of Industrial Water Pipeline. Design and Installation of Raw Water Pipeline. Design and Selection of Pumps. Stress Analysis and Deflection Analysis of Beam. Calculate the Design of 20 KL MS under Ground Horizontal Tank with Flat End, as per PESO requirement. Prepare all documents as per PESO requirement and Submit for approval and get approved by PESO for SMG. Design and Drafting as per PESO requirement. Calculate the Design of 20 KL SUS 316 under Ground Horizontal Tank with Flat End, as per PESO requirement. Design and Drafting as per PESO requirement. Prepare all documents as per PESO requirement and Submit for approval and get approved by PESO for MSIL Rohtak. Calculate the Design of 1.5 KL MS and SUS under Ground Horizontal Tank with Flat End, as per PESO requirement. Over Headed Equipment details are; 1). Conveyor 2). Piping 3). Structure 4). Cantilever Assembly 5). Over Headed Tank with Structure. 6). Over Headed Walk way and Many more.Project Completion:- Casting Shop Utilities Pipe Line Design and Installation in Maruti Suzuki India Pvt Ltd, Gurgaon. High Pressure Sprinkler Tank and Pipe Line Design and Installation in Maruti Suzuki India Pvt Ltd, R& D Plant, Rohtak, Haryana. 3 Nos. x 20KL under Ground HSD Horizontal Tank for Suzuki Motor Gujarat Pvt Ltd, Mehsana, Gujarat. Calculate PT & ED Piping BOQ for ISUZU Ltd, Ropar Punjab. 1 No. x 20 KL SUS Under Ground Horizontal Tanks for Maruti Suzuki India Ltd , Rohtak, Haryana Working on 2 No’s X 1.5 KL SUS under Ground Horizontal for Maruti Suzuki India Ltd, Rohtak, Haryana. Show less

    • Ashwath Infratech Pvt. Ltd.

      Apr 2017 - Mar 2022
      Project Manager

      1. Designing Assembly, Installation, Commissioning and Maintenance of Heavy Machinery. 2. Rehabilitation, Operation & Maintenance for 10 Years of 16 MGD Recycling Plant and WTP at Haiderpur.5. Technical Documents Submission in Tender Works.6. Attend the Pre-Bid Meeting and Bid Opening Meeting.7. Tender Processing Activities works with Technical Submission.8. Costing for Tender,9. Costing for Heavy Machinery, WTP, STP and Recycling Plant.10. Generate Pre-Bid Query for Pre-Bid Meeting.11. Reed Bed Technologies for STP. 12. Liaoning with Government and Semi – Government Agency.13. Design & Preparation of Equipment Layout, Piping Layout, Mechanical GA and Basic detailed Engineering Drawing with the help of or close interact with Process, Mechanical, Civil, Electrical and Instrumentation and Project Department.2. Handling all the Project Engineering activities.14. Designing & Preparation of BOQ for Pipe, fittings, Special Pipe, fitting & Valves and issue material requisition/ indent etc.15. Installation an Commissioning. Show less

    • Enviromech Dredging India Private Limited

      Mar 2022 - Jul 2022
      Senior Manager - Projects

       Bidding / Tender Preparations (Attend the Pre-Bid Meeting, Pre-Bid Query, Finalizations of Bidding / Tender & Technical Section of Tenders including Methodology, Schedule, Datasheets etc. for Single & Two Part of Single Stage / Two Stage Tender)). Business Development and Proposal (Preparation of Invitation to Tender, Bid Evaluation, Preparation of Extension of Time (E.O.T), and also contribution towards Planning, Scheduling and Procurements). Estimation and Costing (Price Comparisons and their basis, costing with Contingencies including margins, overhead & non-billable). Project Execution Planning. Preparing estimate of Projects and forward the same to Purchase Team after getting approval from the Management. Contractor / Vendor / Supplier Mobilization. Preparing of Material requirement sheet for Project. Co-Ordination with H.O for Project Funding, Material. Submission of Drg’s and Documents for client approval. Coordination with client for solving the site related problems. Prepare Billing and get approval from the competent Authority.  Liaoning with Government and Semi – Government Agency. Preparation of Equipment Layout, Piping Layout, Mechanical G.A and Basic detailed Engineering Drawing with the help of or close interact with Process, Mechanical, Civil, Electrical and Instrumentation and Project Department. Assembly, Installation, Commissioning and Maintenance of Heavy Machinery. Responsible for Interact with Client, Consultant, Main Contractor (if any), Site In charge, Vendors & Suppliers, arrangement of Internal & External Meetings, Fixed the deadlines for documents / Drawing Submission. Handling all the Project Engineering activities.Project Completion:-1). Work under Afcon Infrastructure, Patna, Bihar.2). Work under National Thermal Power Plant, Raipur, Chatisgarh Show less

    • Vij Engineers & Consultant Private Limited

      Sept 2022 - Dec 2022
      Senior Manager- Projects

       Bidding / Tender Preparations (Attend the Pre-Bid Meeting, Pre-Bid Query, Finalizations of Bidding / Tender & Technical Section of Tenders including Methodology, Schedule, Datasheets etc. for Single & Two Part of Single Stage / Two Stage Tender)). Business Development and Proposal (Preparation of Invitation to Tender, Bid Evaluation, Preparation of Extension of Time (E.O.T), and also contribution towards Planning, Scheduling and Procurements). Estimation and Costing (Price Comparisons and their basis, costing with Contingencies including margins, overhead & non-billable). Project Execution Planning. Preparing estimate of Projects and forward the same to Purchase Team after getting approval from the Management. Contractor / Vendor / Supplier Mobilization. Preparing of Material requirement sheet for Project. Co-Ordination with H.O for Project Funding, Material. Submission of Drg’s and Documents for client approval. Coordination with client for solving the site related problems. Prepare Billing and get approval from the competent Authority.  Liaoning with Government and Semi – Government Agency. Preparation of Equipment Layout, Piping Layout, Mechanical G.A and Basic detailed Engineering Drawing with the help of or close interact with Process, Mechanical, Civil, Electrical and Instrumentation and Project Department. Assembly, Installation, Commissioning and Maintenance of Heavy Machinery. Responsible for Interact with Client, Consultant, Main Contractor (if any), Site In charge, Vendors & Suppliers, arrangement of Internal & External Meetings, Fixed the deadlines for documents / Drawing Submission. Handling all the Project Engineering activities.Project Completion:-1). Work under Himachal Pradesh Public Work Department (HPPWD), Shimla , H.P2). Work under Delhi Metro Rail Corporation (DMRC), New Delhi Show less

    • MARC SURFACE COATINGS PRIVATE LIMITED

      May 2023 - now
      Senior Project Manager

       Initiated development of project scope, requirements, and schedule, facilitate project team meetings and drive project deliverables to align with stakeholder's expectations.  Responsible for monitoring project progress, hiring and presented a contract to appropriate vendor. Maintaining detailed financial records.  Analyzed technical problems and assisted in not only providing recommendations but also involved in providing the solutions to Clients, Team Members and Vendors.  Coordinated with Clients, Vendors and Contractor for Project Activities.  Circulated Project Progress Report to Clients and Disciplines.  Approved Drawing and documents of drafting staff and ensure timely release of project drawing and documents.  Organized and participated in various meeting related to projects with Clients, Higher Management and Team Members.  Negotiated and issued purchase orders, terms and conditions as per the company's policy.  Raising invoices to client for services provided, recommended payment of suppliers and subsequently payment follow up.  Contributed significantly to achieve Project Progress as: Overall-86%, Engineering-99.6%, Procurement-99%, Site Construction-70%. Finalization of the clear scope of working during the kick-off meeting by consulting all the departments.  Preparation of Project presentation on monthly basis showing overall project progress report status.  Coordinated with Internal Department, Clients, Vendors, and Subcontractors for Project Activities.  Monitoring the project and trying to clear the obstacles through meetings and reviews. Follow up with vendors. Gathered project requirements, and develop detailed scopes of work.  Participation in the Tendering Procedure and Recommendation for ordering after discussion with technical and commercial departments.  Collected data during the site visit and resolution of site related issue.  Site coordination and settlements of Bills and expenses. Show less

  • Licenses & Certifications

    • MSME Business Skill.

      Ministry of Micro, Small and Medium Enterprises
      Sept 2007
      View certificate certificate