%2C_BSc(Hons)QS%2C_PMP%C2%AE%2C_MRICS-APC_(ADM%2C_DMT%2C_Musanada_Approved).webp)
Timeline
About me
Commercial and Contracts Professional/ Cost Manager/ Commercial Manager/ Sr. Quantity Surveyor/ Contract Administrator/ Commercial Specialist/ Commercial Audit
Education

Cadd centre
-Diploma project management
Technical college of sri lanka (dtet)
2006 -Nct quantity surveying
University of wolverhampton
2018 -Bsc (hons) quantity surveying
Birmingham city university
2024 -Msc (r) construction project management
Experience

Power construction
Jun 2007 - Jan 2008Junior quantity surveyor>>Reporting to Senior Quantity SurveyorProjects in Post Contract: Public Market, Community Center, Fisherman restroomsDuties and Responsibilities: Quantity take-offs, Material inquiries, and BOQ preparation. Preparation of Interim Valuation. Calling for Quotations from Suppliers & Sub Contractors, Checking sub contractor's valuation and preparing payment certificate Monitoring Construction planning. Updating the project schedules from actual site status. Mostrar menos

Farzan building construction
Jan 2009 - Jan 2011Quantity surveyor>>Reporting to Project ManagerProjects in Post Contract: Infrastructure works package (it covers the Road works, Pipe Laying for Drainage, Sewerage, Water Supply, Irrigation, Lighting Electrical cabling, and Telecommunication), South EasternUniversity Buildings, Residential Buildings, and Vocational Training CentersDuties and Responsibilities: Supervising the work & material quality Quantity take-offs for Valuation BOQ preparation Preparation of Interim payment application, Statement at completion & Final Accounts Checking sub contractor's valuation and preparing payment certificate Material and Rate Breakdown Estimating & Rate analyzing Preparing material requirement sheet at the end of every month Checking & inspecting the work according to the project planning Keep track of project as per planning schedule and coordinate with higher management Mostrar menos

Ncc limited
Jan 2011 - Jan 2012Quantity surveyorProjects in Post Contract: (Few are) Including Road, Infrastructure, Buildings, Utilities & Fit Out. CONSTRUCTION OF AL BATINAH COASTAL ROAD (66Km) at Oman - Project Value is UD $ 374.00 Million WADI ADAI – AL AMERAT ROAD (7.5Km) at Oman- Project Value is UD $ 134.00 Million (G+35) 2No’s NCC HARMONEY TOWERS at Dubio Tech, Dubai-UAE- Project Value is AED 1700.00 Million (Total Built up area is 4.00 Million Sq.ft)Duties and Responsibilities (in Post Contract): Prepare Interim payment application along with supporting documents Preparing the Measurement sheet/backup documents for IPA based on the Method of measurement/ CESMM3 in line with approved shop drawings and As-Built drawings for Re-Measurable contract works (it covers the Ground Investigation, Demolition & Site clearance, Earthworks, Road works, Soft Landscape, Concrete Structures, Removal & Rerouting of utilities, “Pipeworks – for Water supply, Storm Drainage, Irrigation, Fire Fighting Networks”, Fittings & Valves, Manhole, Supporting & Protection for pipe works, Structural Metalworks, Asphalt and paving, Signs & markings, Waterproofing, Etc..) Reviewing Sub-contractor payment applications, evaluation and issuance of payment certificates Monitoring and forecasting the project cost to complete Reviewing Variations, evaluation, and issuance of the Variations Orders Preparation of estimations and build-up rates for Variation Items Preparation of cost comparison of sub-contractor/Supplier quotations Attending the Negotiation Meeting with the Sub-contractorDuties and Responsibilities (in Pre-Contract): Taking off Quantity from the Tender drawings. Material Enquiries & BOQ preparation for Sub-contract packages Compiling inquiries for Sub-contractors and Suppliers to request quotations (RFQ) Preparation of the comparative statement. Estimating & Rate analyzing. Assessing the Rate Break Down. Involving in the Preparation of construction programs. Mostrar menos

Alghurair contracting & engineering works - agcew
Jan 2012 - Mar 2019Client: NAKHEELReporting to PM & Director of Operation managed a team of 4 QS’s Projects (few are) Infrastructure, Buildings, Utilities, Road, External works, Fit Out, Hard & Soft Landscape DRAGON CITY HOTEL, EXTERNAL WORKS, ROAD, INFRASTRUCTURE & EXTERNAL PACKAGE (Phase-1) At Dubai-UAE - Project Value is AED 136.5M DRAGON MART FURNITURE SHOWROOM, ROAD & HARD LANDSCAPE at Dubai-UAE- Project Value is AED 117.5 CLUB VISTA MARE (33nr Studio Apartments with Restaurants and Cafes), ROAD, SOFT & HARD LANDSCAPE at Dubai-UAE- Project Value is AED 38.67M NEW KANOO COMPOUND 2 & 3 (5+8 Units of Townhouses) at DUBAI-UAE- Project Value is AED 34.00MResponsible for:Ensure prompt and regular submission of IPA and negotiation with ERC to get timely certificationCollects WIR, MIR, DO, Invoice, and shop drawing for IPC supportingdocumentsPreparation of monthly financial summary statementPreparation of cash flow forecastInvolve in the procurement of materials, especially which are long lead itemsAdvice and discussions with PM & CM on the cost implication of variationsMaintaining a VO log that tracks the current status of all VO's, substantiation, negotiationand agreement of VO with the ERCEstimate for extra work and preparation of variationNegotiating and follow-up VO's with consultantQuantity taking off from IFC drawings & BOQ preparation for sub-contractors worksCompiling enquiries for Sub-contractors and Suppliers to RFQFollowing up with sub-contractors and suppliers for quotationsPreparation of cost comparison of sub-contractors' quotationsRe/Site-measurementAnalysis of the changes of drawing for sub-contract payment based on actual progressField visits to evaluate and certify the quantity of work done before any PC of subcontractors and supplier paymentReview and evaluation of ssubcontractor'sPA and PCIssue the VO's to subcontractorsReview, negotiate & settle sub-contractors VO'sAchievement: Managed Variations to Zero dispute Mostrar menos •Preparation of BOQ & Tender documents for sub contract works and specialist suppliers•Quantities take off and Estimate•Collation of tender enquiry documents•Preparation of Preliminary Cost•Review and evaluation of sub-contractor quotations•Formal sub-contract agreements•Tender preparation, submitting, evaluation and value EngineeringProject Won in Bidding: (B+G+9+R) Dragon City Hotel, External works, Road, Infrastructure & External Package (P1) at International City, Dubai-UAE, Project Value is AED 136.5 Million Dragon Mart Furniture Showroom (18 Showrooms & Multi Story Parking) at International City, Dubai-UAE, Project Value is AED 136.5 Million Club Vista Mare (33nr Studio Apartments with Restaurants and Cafes) at Palm Jumeirah on Plot No: PJTR17 Dubai-UAE, Project Value is AED 38.67 Million New Kanoo Compound 2 & 3 (5+8 Units of Townhouses) at Umm Suqeim First, on Plot No: 356-243 DUBAI-UAE,-Project Value is AED 34.00 Million G+1 (11) Group of Villa & Service Block at Jumeirah Third, on Plot No: 3520511 DUBAI-UAE, - Project Value is AED 22.80 Million G+4 Labour Camp at DIP, on Plot No: 597-301 Dubai-UAE, Project Value is AED 13.69 Million Mostrar menos
Sr. Quantity Surveyor (Post Contract)
Jan 2012 - Mar 2019Senior Quantity Surveyor (Pre Contract)
Jan 2012 - Mar 2015

Silver coast construction & boring
Mar 2019 - Feb 2020Senior quantity surveyor/ cost engineerClient: PGC (Presidential Guard Command) Reporting to the Tender & Estimating Manager and Director of Operation and Managing a team of QSProjects (few are): Including Road, Infrastructure, Buildings, Utilities, Hard & SoftLandscapee PGC44-Construction Works for Reconnaissance Group at Zayed Military City Camp / 2nd Phase- Project Value is AED68.33M.PGC268-Construction Works of 2nd Phase for Presidential Guard Al Frsan Group Command at Al Taweela Camp–Project Value is AED60.90.M.PGC485-Construction Works of Different Facilities in Sas Al Nakheel and Sweihan Projects-Project Value is AED59.90MPGC522-Construction Works of Different Facilities Buildings in ZMC-Project Value is AED49.50MResponsible for:Ensure prompt and regular submission of main contract Interim payment application along with supporting documents and negotiation with a consultant to get timely certification Preparation of Statement at completion and Final Account along with supporting documents Advice and discussion with project manager and contract manager on the cost implication of variations Estimate for extra work, preparation of variation, negotiating and follow-up variations with a consultant Unit rate analysis and new rate build-up Maintaining a variation log that tracks the current status of all variations, substantiation, negotiation, and agreement of variations with the client/ consultantAttend monthly site meetings and internal site meetings Quantity taking off from IFC drawings & BOQ preparation for sub-contract agreementCompiling inquiries for Sub-contractors and Suppliers to request quotations (RFQ) Analysis of the changes of drawing for sub-contract payment based on actual progress Field visits to evaluate and certify the quantity of work done before any certification of sub-contractors and supplier payment and Re-measurement/ site measurement if required Review and evaluation of subcontractor's payment application and certified Mostrar menos

Al ryum group of companies
Mar 2020 - Mar 2021Sr. quantity surveyorReporting to the Group Commercial Manager/Project ManagerProjects: Including Road & Infrastructure, Utilities, Buildings, Streetscape, Hard & Soft Landscape.RCTP0393-Rehabilitation and Development of Landscaping on Road Sides in Abu Dhabi Island (Model Project in Bateen Street)RCTP0388-Misc.. works for the Development & Rehabilitation of Landscape Assets & Local Irrigation Networks at the Municipality of the city center limits CCM200.RCTP0384-Presidential Place- Qasr Al Watan Abu Dhabi – Villa Package (CCP360) Zone-WRCTP0392-Miscellaneous works for the Development & Rehabilitation of Landscape Assets & Local Irrigation Networks ZMCResponsible forEnsure prompt and regular submission of main contract Interim payment application along with supporting documents and negotiation with a consultant to get timely certification Preparation of Statement at completion and Final Account along with supporting documents Advice and discussion with project manager and contract manager on the cost implication of variations Estimate for extra work, preparation of variation, negotiating and follow-up variations with a consultant Unit rate analysis and new rate build-up Maintaining a variation log that tracks the current status of all variations, substantiation, negotiation, and agreement of variations with the client/ consultantAttend monthly site meetings and internal site meetings Quantity taking off from IFC drawings & BOQ preparation for sub-contract agreementCompiling inquiries for Sub-contractors and Suppliers to request quotations (RFQ) Analysis of the changes of drawing for sub-contract payment based on actual progress Field visits to evaluate and certify the quantity of work done before any certification of sub-contractors and supplier payment and Re-measurement/ site measurement if required Review and evaluation of subcontractor's payment application and certified Mostrar menos

Khatib & alami
Mar 2021 - Feb 2022Sr. quantity surveyorClient: Musanada Reporting to Residence Engineer/ Commercial LeadProjects: Improvement of E11/E12 between Al Falah - Al Reef(Infrastructure) Including Roads, Utilities, Bridge, Hard Landscape.The Major components of the project are Bridge and Road Works described as follows: upgradation of the existing bridge (1 x1 lane to 4 x 4 lane) ~ Construction of new bridge and extension of existing bridges to cater for the additional lanes. The total no of lanes shall be 8 lanes which will form two carriageways. ~ Convert the existing dumbbell roundabouts to signalized junctions ~ Widening of E12 roads extends from the E11 interchange to AI Falah Community ~ The road E12 widening includes updating three roundabouts and one new roundabout on Majlis side. ~ Upgrade the link roads, which are connected to AI-Reef Community and Rawadat AI Reef Palace and ramps to/from the E11 highway.The project's scope also covers all associated Utilities and Landscaping Works. The project is located in the Shahama area of Abu Dhabi and the interchange is located on the E11 highway between E1 0 to the West AI Falah Community to the East and Rawadat AI - Reef Palace.Responsible (few are):•Ability to handle project independently for all commercial and contractual aspects of the project•Review contractor’s payment applications by Contract requirements•Review and report on cost submissions prepared by the contractor for completeness of all necessary information and supporting documentation to substantiate the cost. Identify and request any missing documents and review that all supporting documents are properly correlated and cross-referenced•Updating Dashboards, Cash flow projections, preparation of financial statements for monthly reports, Monitor contracts final cost estimates, and advising management of any cost overrun•Advise the PM’s and RE’s on measurement procedure and calculation of Interim and final quantities•Assures value for money on all works and services. Mostrar menos

Otak international
Mar 2022 - nowCost managerClient: Abudhabi City Municipality (ADM)Projects: Miscellaneous Works at Abu Dhabi Island Reporting to Sr. Project Manager/ Sr. Residence EngineerClient: Department of Municipalities and Transport (DMT)Reporting to Residence Engineer/ Project ManagerProjects: Al Maqtaa Police Museum.Responsible (few are):•Ability to handle project independently for all commercial and contractual aspects of the project•Prepare High-level cost estimates based on concept design and detailed cost estimates based on detailed design.•Review contractor’s payment applications (including review of compilation of all claimed items by agreed and or approved unit price and agreed quantity measurement and prepare Payment Certificate Report, all by Contract requirements•Evaluating Variation Orders, Value Engineering, Cost Savings, Claims, Prolongation cost for EOT, and recommendation of the Contractor's entitlement and issuance to the Client•Contractual Notification for all events (Variations, Delays, Completion, Handing over, EOT, Claims, etc)•Administration of all commercial & contractual Correspondences and prepare the responses•Review and report on cost submissions prepared by the contractor for completeness of all necessary information and supporting documentation to substantiate the cost. Identify and request any missing documents and review that all supporting documents are properly correlated and cross-referenced•Partake in the auditing of the Final Account with all supporting documentation and Check the measurement of completed work•Assures value for money on all works and services Mostrar menos

Azizi developments
Nov 2022 - Oct 2023Sr. quantity surveyorAzizi is one of Dubai’s leading real estate developers, renowned for flagship residential projects in desirable locations across the city.Project Involved: (Construction of Residential & Commercial building/ Tower and Infrastructure development)PROJECT 1: AZIZI RIVIERA PHASE 2-4 At Meydan/ MBR City, the Estimated project value is AED 3 Billion.PROJECT 2: CREEK VIEWS-II & IIICreek Views at Dubai Healthcare City. Blending in modern life with a nature-friendly lifestyle.The building features a total of 290 units including studios, one-bedroom, two-bedroom, and three-bedroom apartments, along with other lifestyle-centered amenities. BBQ area, a yoga area, and a kids’ play area plus a Sauna & Steam, a gym, and two rejuvenating pools. PROJECT 3: PARK AVENUE, MBR CITYUrban living at its best, Park Avenue is a low-rise residential community located on Meydan Avenue in Mohammed Bin Rashid City (MBR City). from Meydan Grandstand, the home of The Dubai World Cup, the world’s richest horse race and is surrounded by lush green surroundings and nature. Comprising of well-appointed one and two-bedroom apartments across three contemporary buildings, swimming pools and recreational areas, landscaped gardens, and fully-equipped gymnasiums. Mostrar menos
Licenses & Certifications

Project management professional (pmp)
Project management instituteFeb 2025
Languages
- enEnglish
- taTamil
- maMalayalam
- hiHindi
Recommendations

Deepamala mj
Deputy Manager| Six Sigma Green Belt Certified at DeloitteGreater Hyderabad Area
Daria wierzbicka
Senior Account Executive at Publicis Le PontWarsaw, Mazowieckie, Poland
Suruchi singh
HR Generalist in Ujjivan Small Finance BankPune, Maharashtra, India
Dena c. donald, mhr, phr
Director, ComplianceNashville, Tennessee, United States
Daniel schindler
Deputy Chief CFORio Vista, California, United States
Rihanna baldwin
Lead Manager at Eastman ChemicalUnited States
Ahmed mahrous
Honorary Doctorate In Food Industries-Food Industry Consultant-Director Of Quality and Food Safety M...Alexandria, Alexandria, Egypt
Della arsita
Human ResourcesIndonesia
Ketan singh
Software Engineer at OptumGurugram, Haryana, India
Lamisa alam
Barrister at LawToronto, Ontario, Canada
Ted snoddy
Owner at TWS PhotographyJulian, California, United States
Tapani syrjänen
General Manager at WärtsiläTurku, Southwest Finland, Finland
Vincent hill
Entrepreneur | Host of the MindsetJournaling Podcast | Life Insurance AgentBrampton, Ontario, Canada
Lyndie griffin
MS Business student with a strong passion for the field of veterinary medicineCollege Station, Texas, United States
Alfonso granati, ma
Fractional CMO @ On Hire | Strategic Marketing Planning | Innovation ManagerRome, Latium, Italy
Krzysztof zygulski
Steel Buyer | Director of Purchasing | Expert in Strategic Sourcing, Cost Reduction & Process Improv...Schiller Park, Illinois, United States
Anna marie gasienica
Technical Director/Men's Stylist at Van Buren Gentlemen's SalonGreater Chicago Area
Suresh kumar d
Seasoned Leader - F and A | Consulting | HR Transformation | Start up Lead & InvestorChennai, Tamil Nadu, India
Putthimongkol bamrungpipattanaporn
Security AnalystPathum Thani, Pathum Thani, Thailand
Khalil shaik
Professional-II Engineer at CapgeminiGreater Bengaluru Area
...