Burak Ertas

Burak Ertas

Planning & Cost Control Engineer US EMBASSY PROJECT

Followers of Burak Ertas384 followers
location of Burak ErtasGökçeada, Çanakkale, Türkiye

Connect with Burak Ertas to Send Message

Connect

Connect with Burak Ertas to Send Message

Connect
  • Timeline

  • About me

    1915 Canakkale Bridge (longest span worldwide) Construction Engineer at Kwansoo E&C +longest subway extension in North America (Eglinton LRT, TORONTO) +largest cable stay in North America (Champlain Bridge, MONTREAL)

  • Education

    • Concordia University

      2016 - 2018
      Master of Engineering - MEng Civil Engineering

      Activities and Societies: Project Presentations; - North Angola Railway Project / Building Economics North Angola Railway project is analyzed by using building economics analysis. Detailed cost and revenue breakdowns is examined including long term loan payments. - Determining Soil Characteristics and Seismic Zone / Decision Analysis Decision Analysis based on unknown soil type and seismic zone regarding new 3 story building. Final decision is made by using six different analysis.

    • Istanbul Technical University

      2006 - 2011
      Civil Engineering Civil Engineering
  • Experience

    • Caddell Construction-Equatorial Guniea

      Jun 2011 - May 2012
      Planning & Cost Control Engineer US EMBASSY PROJECT

      Planning and Cost Control Engineer (US New Embassy Compound ) - USA NEC project, New Embassy Compound in Guinea de Equatorial); - Developed and maintained detailed product schedules.- Executes daily progress reports.- Developed and monitored project cost forecasts. - Ensured adherence to recommended best practices such as the critical path method based on PERT.

    • Yapı Merkezi

      May 2012 - Jun 2013
      Cost Control Lead Engineer

      - 23km double track railway project that links Zeralda suburbs to the capital city of Algeria. - Performed as cost control lead engineer.

    • SIS Ltd

      Jul 2013 - Jun 2015
      Contracts Manager

      Project Manager (Stadium pitch construction for European Olympic Games)

    • Signature on the Saint Lawrence

      Jun 2018 - May 2019
      Field Engineer - Cable Stayed Bridge

      -Performed as night shift field engineer at the main span of largest Cable Stay Bridge in North America-Supervised 13/15 segment installations which creates the main span. -Inspected steel segment connections and supervised night shift crew for splice plate connections.-Supervised bolting crew to follow critical bolting path during erection phase of box girders.-Supervised cable stayed installations and execute stressing records.-Supervised PT (post-tension) bar stressing for heavy lifting. -Performed daily/weekly progress report to pm.-Ensured all activities are met with Work Methods and HSE standards.-Issued NCRs and follow up RFIs. -Inspected concrete quality when required.-Executed a work method for temporary steel removal which weights tons each passing over a river. Show less

    • Crosslinx Transit Solutions

      Oct 2019 - Dec 2020
      Assistant Superintendent - Chaplin Station

      ECLRT will be the largest subway extension of North America.Chaplin Station will be an underground station located at the Chaplin Crescent and Eglinton Avenue West intersection. Chaplin Station’s design incorporates numerous elements tying it to surrounding green spaces such as the Kay Gardner Beltline Trail.KEY FEATURES Three station entrances: one on the northeast corner, one on the southwest corner, and the last on the southeast corner integrated into the old Toronto Fire hall.• 32 outdoor bicycle parking spaces• On-street connections to TTC buses• A redesigned Chaplin Parkette with improved greenery, meeting areas, and space for waiting and relaxing• Design integration between the station’s entrances and the Kay Gardner Beltline Trail, in consultation with the City of Toronto’s Parks, Recreation and Forestry DivisionCONSTRUCTION DETAILS• Chaplin Station is being constructed using the top-down construction method.• The western section of the fire hall is a designated heritage building, and has been protected and restored during construction. Show less

    • Kwansoo E&C

      Mar 2021 - Jan 2022
      Bridge Field Engineer

      1915 Canakkale Bridge Project is the longest suspension bridge in the world. Completed 1 year ahead of schedule with non-fatal injuries. Performed as a field engineer during cable installations, deck installations as well as supervised posttensioning on anchorage points prior to deck completion.

    • Balios Construction

      Mar 2023 - now
      Independent Contractor

      Building ecological living spaces with sustainable infrastructures.https://www.baliosconstruction.com/

  • Licenses & Certifications

    • French Language Certificate; intermediate

      EC English Language Centres - Montreal
      Nov 2016
    • B2 French Level Certificate; upper intermediate

      Concordia University
      Sept 2017