Pir Muhammad Ali Shah

Pir Muhammad Ali Shah

Assistant Engineering Manager

Followers of Pir Muhammad Ali Shah20000 followers
location of Pir Muhammad Ali ShahKarāchi, Sindh, Pakistan

Connect with Pir Muhammad Ali Shah to Send Message

Connect

Connect with Pir Muhammad Ali Shah to Send Message

Connect
  • Timeline

  • About me

    Manager, Kandhkot Gas Field

  • Education

    • Adamjee Govt Science College

      1995 - 1997
      Intermediate Pre- Engineering A

      Intermediate Examination

    • NED University of Engineering and Technology

      1996 - 2000
      Bachelor of Engineering - BE Mechanical Engineering First Division

      Completed my Bachelors Degree in First Division.

    • Institute of Business Administration

      2010 - 2012
      Master of Business Administration (MBA) Public Sector Organization

      Activities and Societies: Class representative and asscoiated with many extra curricular activities. Completed my Master's Degree in First Division (80%) 3.2 CGPA

    • NED University of Engineering and Technology

      2017 - 2019
      Master of Engineering - MEng Petroleum Engineering 3.5 GPA

      Subjects: PE-502 Advance Drilling Engineering (A-)PE-504 Applied Mathematics in Petroleum Engineering (A-)PE-304 Reservoir Engineering-1 (NC) (B)PE-503 Advanced Production Engineering and Flow Assurance (B+)PE-505 Health, Safety and Environment (A-)PE-501 Advanced Reservoir Engineering (B+)PE-515 Under-balanced and Managed Pressure Drilling (B+)PE-510 Enhanced Oil Recovery (B)PE-528 Applied Petroleum Project Planning and Management (B+)PE-600 Independent… Show more Subjects: PE-502 Advance Drilling Engineering (A-)PE-504 Applied Mathematics in Petroleum Engineering (A-)PE-304 Reservoir Engineering-1 (NC) (B)PE-503 Advanced Production Engineering and Flow Assurance (B+)PE-505 Health, Safety and Environment (A-)PE-501 Advanced Reservoir Engineering (B+)PE-515 Under-balanced and Managed Pressure Drilling (B+)PE-510 Enhanced Oil Recovery (B)PE-528 Applied Petroleum Project Planning and Management (B+)PE-600 Independent Study Project Show less

  • Experience

    • S. G. Fiber Pvt Ltd

      Jan 2000 - Jan 2003
      Assistant Engineering Manager

      Responsible for smooth operation of Twisting Dept. including arrangement of contractual employer, inventory management, preventive maintenance and maintaining optimum production level.

    • Pakistan Nuclear Regulatory Authority (PNRA)

      Mar 2003 - May 2010
      Senior Engineer

      PNRA is working to ensure safe operation of Nuclear Power Plants in Pakistan. Served as a Resident Inspector at Nuclear Power Plant for three years and responsible for Asset Integrity and finalization of recommendations for Long Term Operation of plant after completing operational design life. Responsibilities and Accountabilities: - Worked as Resident Inspector at Karachi Nuclear Plant to carry out planning, organizing and execution of baseline/special inspections. - Reviewed condition monitoring reports and carried out RCFA related to plant operation and maintenance issues. - Writing of Asset Integrity Reports on fitness-for-service of critical equipment for plant operation after completing design life of 30 years.- Conducted Integrity Audits pertaining to Pressure Vessels, Steam Generators, feed water piping etc to assess equipment health for operation beyond design life.- Assessment of damage mechanism and remnant life of steam generators, condensers, pipelines and other stationary equipment and develop recommendations in the light of international codes and standards. - Excellent command on basic NDT techniques; like Penetrant Testing, Magnetic Particle Testing, Radiographic Examination, Ultrasonic Testing, Thermography, etc. - Training of Technicians using computerized tests on ASME, NDTs, Arresting Cracks, Corrosion, Health assessment of pipelines & vessels, Welding Specifications, NDT Scope and PWHT were also completed. Show less

    • International Atomic Energy Agency

      Feb 2007 - Aug 2007
      Fellow

      Worked at International Atomic Energy Agency (IAEA) on special assignment for six month (February, 2007 to August, 2007) to develop Safety Analysis Review Report Plan (SARRP) for various expert missions of Agency (IAEA).

    • Pakistan Petroleum Limited

      May 2010 - now

      PPL is a leading and the oldest E&P Company in Pakistan and operator of six (06) gas/oil fields. I am responsible to ensure sustainable operation and effective business and financial planning so that all KPOs as per Balance Score Card can be achieved and development of Kandhkot Gas Field at optimum production level of 250 MMscfd. A part of core technical responsibilities, effectively involved in employee mentoring, conflict negotiations etc.Following technical and financial areas are directly accountable:a. Billing Dept. (Monthly billing to customer such as WAPDA, SNGPL, SSGCL & PRL).b. De-Hydration Plant Operation (Process plant in order to assure that free of moisture gas shall reach tocustomer)c. Well Operation Dept. (responsible for gas wells operations)d. Mechanical Maintenance Dept. (responsible for all field and plant maintenance)e. Electrical and Instrumentation Dept. (responsible for all field and plant maintenance) Show less PPL is a leading and the oldest E&P Company in Pakistan and operator of six (06) gas/oil fields. As a Senior Engineer Production, at Kandhkot Gas Field, I am responsible for smooth operation of Production Dept. having four (04) sections with overall strength of 25 heads directly reporting and 15 heads in-directly reporting. Following are my major responsibilities:• Operating and maintaining existing wells and facilities to high integrity standards,• Managing day-to-day operations, with a strong focus on safety and environmental issues,• Balancing day-to-day operational priorities with longer-term strategic objectives,• Asset management planning,• Workover design and execution,• Production equipment design,• Cost estimating and budgeting,• Interfacing with working interest partners, service companies and regulatory agencies,• Field development planning and project support,• Logistics for Major Projects and existing fields,• Managing contracts and the performance of contractors within an oil and gas field operation,• Implementing safe and environmentally sound practices in field operations and maintenance.• Determining appropriate equipment for facilities and construction operations.• Performing procedures in drilling, workover, snubbing and coiled tubing operations.• Determining and applying slickline, remedial and P&A operations of PPL. Show less

      • Manager, Kandhkot Gas Field

        Jul 2023 - now
      • Chief Risk Officer (CRO)

        Dec 2022 - Jun 2023
      • Chief Engineer (Sui & KDT Asset)

        Feb 2020 - Dec 2022
      • Chief Engineer (KDT Asset)

        Jul 2018 - Jan 2020
      • Deputy Chief Engineer (KDT Asset)

        Oct 2017 - Jul 2018
      • Deputy Chief Engineer KDT Field

        Jul 2016 - Sept 2017
      • Senior Engineer Production

        Oct 2014 - Jun 2016
      • Sr. Engineer (Monitoring & Inspection) Asset Integrity

        Jan 2013 - Sept 2014
      • Engineer (Monitoring & Inspection) Asset Integrity

        May 2010 - Dec 2012
  • Licenses & Certifications

    • Certified Asset Health Management Practitioner

      Institute of Reliability Centred Maintenance
      Aug 2013
    • Lead Auditor of QMS

      SGS
      Jun 2010
    • Certified Quality Manager / Organizational Excellence

      ASQ
      Oct 2010
      View certificate certificate
    • Certified Quality Professional

      NED University of Engineering & Technology, Karachi
      May 2011
      View certificate certificate
    • Certified Reliability Engineer

      ASQ
      Mar 2014
      View certificate certificate
    • Risk Based Inspection

      API
      Mar 2014
      View certificate certificate