
Guruvinder Singh
Civil engineer

Connect with Guruvinder Singh to Send Message
Connect
Connect with Guruvinder Singh to Send Message
ConnectTimeline
About me
Civil Engineer
Education

Rajasthan university
2008 - 2011Bachelor of Technology (B.Tech.) Civil Engineering First Class
Aligarh Muslim University
2000 - 2003Diploma civil engineeringDiploma in Civil ngineering with Honours
Experience

Khanna Builders
Jun 2003 - Oct 2003Civil engineerDetail of workAll civil Works Pertaining to the construction of civil engineering, Checking of Bills, R.C.C. framed structure , Over head water tank , Piling, Retrofitting of existing beams or columns ,structural Steel works for beams , Staircases etc., Miscellaneous Building works, architectural finishing works for Malls, Cineplex, Multiplexes buildings, etc.

M.S.G. Contractor
Nov 2003 - Nov 2006Civil EngineerCompany Profile: Contracting Firm for all kinds of civil works Project: Residential Project, Commercial Building & Industrial buildings In NCR Working as Civil Engineer.; Detail of workPreparing Estimates, Labor Handling ,Checking of Sub Contractors Bills, Preparing running bills, R.C.C. framed structure , Piling, Pile caps, ,structural Steel works , Staircases etc., Miscellaneous Building works, architectural works for buildings.

SACRED CONSTRUCTIONS
May 2006 - Nov 2006Civil EngineerPreparing Estimates, Reviewing Sub contractor Bills.• Handling Labor & Resources.• Execution of R.C.C. framed structure, Piling, Raft, Combined Footings, Brickwork, Flooring, False work etc.• Structural Steel works.• Finishing works for industrial building etc.

Ceacon Consultants
Dec 2006 - Jun 2007Civil EngineerCompany Profile: Consultant Firm for Roulunds Braking (Denmark), Bharti group, Trident Group, New Holland Tractor etc.Detail of work Site inspection for quality checks in industrial building, offices and school. Retrofitting of existing beams or columns, Structural Steel works for beams, Staircases etc. including architectural finishing works for buildings. Monitoring of progress, making daily reports and checking of contractor's running bills.

Parsons Corporation
Jul 2007 - Dec 2011Civil / Structural InspectorDetail of workWorking as STRUCTURAL INSPECTOR in all phases of construction of Elevated viaduct of Green line of Dubai Metro Project. ELEVATED VIADUCT OF DUBAI METRO: Carrying out inspection of rebar's and concrete as per approved method of statements, ITP's , Shop drawings, and BBS, Approved formworks and false works design, approval check of material sources and quality check of concrete, on site, monitoring and supervision of works in quality and safety manners of PILE of maximum Dia 2.8m with Permanent Sleeve, Pile caps for two span and three span bridges, mono piers construction , two span precast pier caps, and three span in situ diamond pier caps, pier cap secondary stage concrete, pier cap initial stage pre stressing of stands, pier caps tendons grouting.METRO STATIONS: Carrying out inspection of rebar's and concrete as per approved method of statements, ITP's , Shop drawings, and BBS, ASTM , Approved formworks and false works design, materials and work like water proofing, repairing , grouting of concrete structure, shoring of excavated area, approval check of materials sources and quality check of concrete, on site, monitoring and supervision of works in quality and safety manners of station pilling, station piers, spine beam, upper concourse, concourse slab and heavy steel structure for station cantilevers beam erection for concourse slab of stations, Internal steel structure above concourse & below platform slab, platform slab construction, Roof erection i.e., primary ribs divided in seven parts to make roof, sheeting of roofs including insulation, Platform screen Doors, Fire proof painting on steel structure of stations.FOOT OVER BRIDGES: Steel structure erection of foot bridges, fire proof painting, deck concreting, Building envelope works, Architectural works, Non Destructive testing of steel structure in all stages of Dubai metro. Erection of Bridges by Self Propelled Modular Transporter (SPMT) Show less

Hindustam Construction Company
Jan 2012 - Jun 2012QA /QC EngineerWorking in a Nuclear power project as a QA Engineer in Rajasthan India. Two units of eact 700 MW each. Indepently done all civil works inspection of one Reactor building as well as Non Nuclear Building works also. All type of testing of all materials and all technical things covered in the scope of work.

SDT JV (SAIPEM DODSAL TECHNIMONT)
Jul 2012 - Aug 2013Civil Engineer - Etihad Railway Projectworked in Etihad Railway project in UAE Abu Dhabi as a Civil Engineer & Reporting Directly to Construction Manager, Currently posted In Depot of the project.Depot Includec 16No. buildings including Structural, MEP , Architectural , track works including services in Depot & temporary Rail Head Area.RESPONSIBILITIES:-Reviewing all drawing prior to start of work.Co-coordinating with all sub contractors at site on daily basis as well as Weekly meeting.Co-coordinating with suppliers for materials delivery on time.Ensuring all works done as per Project & Government requirements. Show less

Egis
Sept 2013 - Mar 2017Civil EngineerWorking in Major station of DOHA Metro located at Downtown of Doha. Station consists of Three Metro lines ( Red , Green & Gold ) at Two different levels. RESPONSIBILITIES:-Construction Supervision of all activities i.e Traffic Diversion works ,Open cut Excavation up to 45m,Diaphragm wall , Steel anchors , GFRP anchors at TBM opening locations, Soil nailing, Secant piles, Working piles for station at Base slab raft level, Pile caps, Dewatering works , Composite columns , RCC framing & Thickness of Roof slab of station is 3meter. Coordinating with MEP team , Involved with TVF arrangements. Reviewing Method statements, ITP, Planning & Site meetings with Contractor engineer & Site managers etc. Show less
Licenses & Certifications
- View certificate

Construction Management: Reading Drawings & Specifications
LinkedInOct 2020 - View certificate

Inclusive Leadership
LinkedInMar 2021 - View certificate

Construction Management: Project Delivery Methods
LinkedInSept 2020
Recommendations

Romy fuchten-bergh
VerpleegkundigeNijmegen, Gelderland, Netherlands
James donovan
General Manager - People, Culture & SafetyHeatherton, Victoria, Australie
Deepak prem, phd
Manager Regulatory Advocacy and Scientific AffairsDelhi, India
Giang nguyen
Sales DirectorHanoi, Hanoi, Vietnam
Shri om kalra
Senior Art Director at VML, WPPNew Delhi, Delhi, India
Julia tzambazis
Senior Coordinator Business DevelopmentMelbourne, Victoria, Australia
Paul jr. jean marie, cgeit, crisc, cism, cdpse, cisa
IT Manager at Compagnie des Tabacs Comme Il FautHaiti
Carlos moran
Industrial/Organizational Psychologist. Training and Development specialist, Organizational Developm...Costa Mesa, California, United States
Piyush soni
Senior Engineer @ Samsung R&D Institute India || DTU ‘21Delhi, India
Gonçalo sousa
Informatics engineering student at Polytechnic Institute of Viana do CasteloPorto, Porto, Portugal
Mahboobeh mohammadi
HR DirectorTehran, Tehran Province, Iran
Jonah auvaa, gsp
Professional Rugby Player || B.S in Safety & Health ManagementPuyallup, Washington, United States
Kristin foster
Production Manager at ICIS | Shaping tomorrow togetherHouston, Texas, United States
Leon lombard
Property Practitioner NQF4 PPRE at Trafalgar Cape TownCity of Cape Town, Western Cape, South Africa
Ajith rajan
Director at Distributed Business SolutionsUnited Arab Emirates
Nicole april
Global Sustainability Standards & Policy Senior Manager at NikeBend, Oregon, United States
Krista kortelainen
Lead Programme & Project Manager at Wellcome Sanger Institute | AHOSPA (Cert RM), MScGreater Cambridge Area
Amr el gerzawy 🇵🇸
Site Operations Manager6th of October, Al Jizah, Egypt
Sue tang
A highly intuitive leader who thrives at a people-oriented environment. Equipped with the invaluable...Petaling Jaya, Selangor, Malaysia
Marius grønstøl
Project Manager hos Sunnhordland Mek. Verksted (SMV AS)Rosendal, Vestland, Norway
...