Engr. Tahir ahmad

Engr. tahir ahmad

bookmark on deepenrich
location of Engr. Tahir ahmadSargodha, Punjab, Pakistan
Followers of Engr. Tahir ahmad1000 followers
  • Timeline

  • About me

    Manager Planning, Coordination, Contracts, Proposal & Estimation

  • Education

    • University of engineering and technology, taxila

      2004 - 2008
      Bsc engineering (civil) a

      Activities and Societies: Reading books, cricket... BACHLOR LEVEL PROJECT :-• Design of Pile and Raft Foundation of “Centaurus “Multi-storey Building Islamabad.

  • Experience

    • Descon engineering pvt. ltd

      Nov 2008 - Aug 2011
      Planning & costing engineer

      • Prepares level –III & IV plans through Primavera for all disciplines keeping in view time frame & available resources and monitor them according to site progress• Review of construction progress through critical path analysis by collecting and resolving bottlenecks from site to arrive at recovery plans to bring the progress back on track.• Generates 3-months and 4-week rolling look -ahead schedules based on Level-IV Plans and work front availability status. Monitoring the activities through DSTS and WSTS.• Identifies updated requirement and estimation of manpower, materials, consumable and equipment based on look-ahead plans and by preparing equipment and manpower deployment status for their economic and timely usage.• Prepare and update S-Curves to compare planned and actual progress.• Controlling the manpower of project through manpower Histograms• Preparation of Organogram to estimate the indirect staff.• Keeps a close watch on actual man-hours booking in GDMS and importing in Process software to appropriate cost-centers to make a comparison between cost center wise Planned, Earned and Actual man hours and to finalize the Schedule variance, and Schedule Performance Index (SPI) of the project. • Generates discipline-wise progress and efficiency reports from PCS on daily, weekly and monthly basis for Client and Head Office separately to monitor the overall progress and efficiency of project through man-hour analysis report and project top sheet.• Preparation of Project Presentations.• Assists construction team in identification of extra works and have a close check on scope of work to finalize the Variation Orders.• Keep costs on track according to project budget by updating on monthly basis and highlight deviance from budget to finalize Cost Variance, Cost Performance Index (CPI) and Percentage Overrun of the budget.• Preparation of Bid and Budget through proper rate analysis.• Prepared the claims for EOT for completion of the Works. Show less

    • Sambu construction co ltd

      Sept 2011 - Jun 2013
      Senior project/planning engineer

      • Dealt all contractual / claims and site administrative matters with the Employer related to EOT, land acquisition, disruption of works by the local community, contract interpretations• Prepared the baseline schedule including the Engineering, Procurement and Construction works and update on monthly basis.• Prepared presentations to the Employer for reasons of delays and recovery plans for timely completion of the project. • Prepared report for the Employer to approve an amendment for the payment schedule of Offshore Supply Contract to maintain the cash neutrality.• Prepared the commercial invoices for custom purposes and milestone schedule for the Employer’s further proceedings to pay custom duties and ownership of the equipment.• Monitoring the project schedule and presentation to the Employer in presence of the Contractor’s management and strategic mitigation to cope with the critical path for timely completion of the project.• Had an effective co-ordination with EM equipment Supplier for timely delivery of the equipment and ensure the timely readiness of civil works from site department to take up installation works by the EM Contractor. • Prepared IPC of Construction & Offshore Contracts subsequent to the issuance of Milestone Completion Certificates by the Employer• Prepared of cost estimate for the subject project at the time of Bid, Assistance to Project Manager and Technical Adviser in project schedule and contract administration, Involved in developing WBS of the project baseline schedule , Involved in developing the logic of activities in co-ordination with the Construction Manager, Monitoring the status of resources deployed in field for construction works• Prepared IPC and escalation payment certificates, prepared rate analysis and BOQs for additional works to be incorporated as variations in original scope of the contract.• Coordinated with CM regarding outstanding issues and progress of construction activities at site. Show less

    • Ekl- engineering kinetics (pvt.) ltd.

      Jul 2013 - Mar 2015
      Planning & costing manager

      • Preparation & implementation of PQAP• Having a close eye on project drawings, study their technical issues and conveying missing detail and clarification from Client through shop drawings submitted for approval and deliver at site after final verification from client. Check As built drawings at project hand over stage.• Rate analysis.• Preparation of project Budget and its revisions via BCTC• Preparation and implementation of project contract documents i.e. Contract, Technical Specifications, FIDIC, etc.• Preparation of VO's• Preparation of Claims• Preparation of Level-III Primavera schedule of the project, update the targeted current Schedule and prepare latest forecasts.• Preparation of resource based Level-IV Plan at site i.e. Material requirement plan, Equipment deployment plan & manpower deployment plan. • Prepare the monitoring module covering equipment utilization and efficiency reports• Preparation of work front availability status• Delay analysis analytical report. That is incorporated in Project Plans & Schedules. Revision is issued if required in the shape of Recovery /Catch-up plan• Preparation of Method statement for all activities and concrete pour & Lift plans for all structures• Invoices are generated on the basis of approved RIT’s• Correspondence with client and head office.• Attending meeting with client & Preparation of Minutes of meeting• Preparation of reports for both internal and external Audits• Handing over all the Dossiers, Cleared Punch Lists and As Built Drawings at closing stage to Client• Prepared the variation requests for approval of the Engineer / the Employer• Prepared the claim for EOT for completion of the Works along with prolongation cost related to EOT. • Prepared the rate analyses for additional / varied work items. • Overall control on the QS section for IPC's and coordination with the Engineer to expedite the payments. Certification of the Sub-contractor’s invoices. Show less

    • Urban planning & design islamabad

      Apr 2015 - May 2016
      Planning, proposal and contract manager

      • To control the QS department, Invoices, contracts, subcontractors.• Ensure timely execution of project by proper implementation of primavera schedules by proper monitoring and economically by having close eye on project BOQ, budget and checking BCTC time to time. Also by comparing with standards controlling the equipment efficiency and their proper utilization.• Completion of project as per IFC drawings.• Finalization of shop drawings.• Implementation of QA/QC Standards to work execution.• Store management by making comparison between design and as per site quantities of materials.• Working on earned value management (EVM) man-hour and cost based and comparing both time to time.• Having a close eye on “Revenue vs. Cost of the Project” to monitor the profit margins of the project.• Construction Supervision of infrastructure and structure works. Monitor the progress and quality of construction works carried out by the Contractor at site. • Dealt the contractual and technical matters at site, Verification of original BOQs of each project by calculating the quantities as per the construction drawings issued at site, Dealt the Contractor’s Cost and Claim matters with the owner.• Verification and recommendation of Contractor’s Invoices of work done at site.• Preparation of Weekly and Monthly Progress Reports to be submitted to owner, attending the meeting regarding progress review and technical matters. Show less

    • Maple leaf cement factory limited

      Jun 2016 - now
      Manager civil projects

      • Have monitored and controlled all the Construction Phase Studies and conveyed to designer to issue IFC drawings• Controlled the QS department• Bidding, CS and finalization of Contractors as per Project Time schedule and budget.• To control all the technical design correspondence with designer and contractor to be a part of decision meetings.• Have prepared and finalized the Level-III Base Line Schedule with the input of all stakeholders i.e. Client, Designer and Contractor• Keep an eye on BCTC time to time• Working on EVM both effort and cost based• Review and approval of PQAP of all contractors• Implementation of QA/QC Standards to work execution• Procurement of client supplied materials by preparing CS and 3rd party testing• Make liaison with contractors regarding resource availability, progress of works and invoices verification, reconciliation of client supplied materials and their final settlements• Preparation of reports for both internal and external Audits• Review and final approval of all the Dossiers, Cleared Punch Lists and As Built Drawings at closing stage submitted by all contractors.• Having a close eye on “Revenue vs. Cost of the Project” to monitor the profit margins of the project.• Key member of Project Management and Control Team, Leading role in EOT/Cost claims and disputes• Responsible to review and approve the Contractors’ schedules (Civil & EM Works), Monitor the Contractors’ progress against the planned completion date and inter-contract milestones, Pro-active approach to foresee bottlenecks / constraints in the schedule and critical work fronts, Monitor the Contractors’ resources (Manpower, Equipment and Material) in line with requirements of the schedule. Effective coordination with the contractors for recovery plans• Dealing the Contractors’ correspondence related to cost, schedule and EOT claims, Preparation of weekly and monthly reports for the Employer, Coordination between stakeholders• Preparation of presentations. Show less

  • Licenses & Certifications

    • Primavera project planner

      Descon engineering limited
      Nov 2009
  • Volunteer Experience

    • To save life through 1st aid

      Issued by Rescue 1122 Pakistan on Mar 2015
      Rescue 1122 PakistanAssociated with Engr. Tahir ahmad