Khyzer Ahmed (P.E Geotechnical Engineering)

Khyzer Ahmed (P.E Geotechnical Engineering)

Intern

Followers of Khyzer Ahmed (P.E Geotechnical Engineering)893 followers
location of Khyzer Ahmed (P.E Geotechnical Engineering)Lahore, Punjab, Pakistan

Connect with Khyzer Ahmed (P.E Geotechnical Engineering) to Send Message

Connect

Connect with Khyzer Ahmed (P.E Geotechnical Engineering) to Send Message

Connect
  • Timeline

  • About me

    Senior Geotechnical Engineer ||Slope Stability ||Rock Engineering || Seepage Analysis ||Flood Protection Schemes

  • Education

    • IMCB, F-7/3, Islamabad

      2007 - 2009
      Intermediate Pre-Engineering
    • Sir Syed Public School, Rawalpindi

      1995 - 2006
      Matric Science
    • National University of Sciences and Technology (NUST)

      2009 - 2013
      Bachelor of Engineering (BEng) Civil Engineering 3.56/4.00

      Activities and Societies: • Nominated for Rector’s Gold Medal for best Final Year Project (among Top-5 groups) • Merit scholarship in BE Civil Engineering NUST • Managing skills: Class representative for six semesters (NUST). • Member ECA club of department, organizing various events. Final Year Project:Rehabitation of Murree Jhika Gali Landslide, proposing various possible solutions, using softwares like ROCSCIENCE SLIDE 6.0, PHASE 2.0.Providing the economical solution against Consultant’s design.Nominated for Rector’s Gold Medal for final year project.

    • National University of Sciences and Technology (NUST)

      2013 - 2017
      Master's degree Geotechnical Engineering 3.80/4.0

      Research thesis: Incorporating side resistance in 3D software analysis of translational slides Main Subjects Covered1. Design and Construction of Earthen Dam 2. Advance Geotechnical Design 3. Soil and Site Improvement4. Slope Stability 5. Rock Mechanics-I 6. Geotechnical Site Investigations7. Mechanical Properties of Soil 8. Pavement Design and Analysis

  • Experience

    • Frontier Works Organization, Pakistan

      Jul 2011 - Aug 2011
      Intern

      OPF Housing Society, Islamabad Highway, Islamabad.• Bridge construction,• Road construction.

    • Qavi Engineers (Pvt.) Limited

      Jul 2013 - Dec 2014
      Site Engineer

      Responsibilities:• Material Testing.• Site Management.• Batching Plant Operation.• Material Request Management.Tasks:• Construction of 6 (Ground+3) blocks with basement.• Testing of concrete cylinders, PCC blocks and bricks.• USCS classification of sand and gravel procured at site.• Soil compaction tests prior to foundation laying.• Quantity estimation of concrete of each activity.• Control of concrete quantity at batching plant during execution of concrete activity.• Quality management of steel from 3rd party test.• Operation of concrete batch plant.• T-walls concrete design. (retaining walls)• Design and manufacturing of concrete blocks. (1500Psi strength) Show less

    • Daelim Industrial Co., Ltd.

      Nov 2015 - Dec 2019

      Responsibilities:• Technical Meetings with consultant and contractor for explanation of design requirements and concepts.• Stability analyses of rock and soil slopes.• Design of reinforcement for slopes and tunnels.• Transient/Time dependent seepage analyses of slopes.• Bearing capacity and settlement analyses.• Design of Earthen dams and dikes.• Scoping of Ground investigation and soil testing.• Consolidation and Curtain grouting design.• Preparation/review of design proposals and reports.• Design coordination and amendment of drawings. Construction support and coordination between Design team and Construction teams. • Inspection of site works, to ensure quality of construction works, implementation fo construction standards.• Preparation of technical reports, including basic design reports, detailed design report of dam seepage and rock slope excavations.• Assessment of foundation condition for Main Weir/Dam body, Intake structures, Powerhouse foundation. Show less 102MW Gulpur Hydropower Project. Responsibilities:• Design co-ordination• Design of temporary structures at site• Site queries and amendments in design according to revised site conditions• Check compliance of execution practices with international codes• Review of design reports• Site visits during execution of work according to design drawingsTasks:• Review of geological site data.• Analysis of site data.• Design and analysis of rock slopes on DIPS, Rocplane and Swedge.• Design and analysis of soil slopes on Slope-W and Seep-W.• Design and analysis of soil slopes on Slide and Phase-2.• Published guidelines for Maximum charge to be used while blasting at specified distances to ensure safety of nearby concrete. The research activity included measuring peak particle velocities data for 60+ blasts.• Issuance of design drawings to the owner’s engineers.• Design issue of consolidation grouting of Weir structure.• Site inspections and checking RFIs for design controlled construction.• Bearing Capacity calculations for CPB foundation and Tower cranes.• Design of perforated pipes for slopes.• Seepage stability analysis of cofferdam against piping failure.• Consolidation grouting technical review with Owner’s Engineer.• Design and analysis of downstream cofferdam according to design drawings and site condition.• Calculation of seepage quantity through cofferdam and provision of water-pumps for dewatering.• Design and execution of dike works for diversion tunnel construction.• Stability analysis of spoil tips for disposal of construction material.• Slope protection of diversion tunnels, powerhouse, intake, maintenance road.• Solving the matter of concrete lift thickness for mass concrete in cofferdam.• Making of monthly progress report of design department.• Design criteria for Hydro-Jacking test in waterway tunnels.• Design of filter scheme for batch plant waste water.• Design criteria for rockfill compaction at inlet area of diversion tunnels Show less

      • Assistant Design Manager

        Oct 2018 - Dec 2019
      • Geotechnical Engineer

        Nov 2015 - Oct 2018
    • China Three Gorges South Asia Investment Limited (C-SAIL)

      Dec 2019 - Jun 2020
      Senior Officer (Civil)

      • Review of Milestone Certificates of EPC contractor.• Manage OA system for incoming and outgoing letters.• Technical meeting with consultant and contractor for explanation of design requirements and concepts.• Managing Monthly Progress Reports, Quarterly Progress Reports, Consent Reports and ROV reports.• Official correspondence with Govt. Departments for approvals of Bridge Design and Construction, recommendation letter for explosives to PPIB.• Meeting with Govt. Officials for technical and community issues.• Site visits to Azad Pattan to monitor construction Progress.• Quality assurance of work as per International standards.• Technical evaluation of bids for CSR projects Show less

    • DL E&C Co., Ltd

      Jul 2020 - Apr 2021
      Technnical Construction Manager

      • Carrying out Field Engineering to ensure safe execution of site activities.• Milestone based construction activities for smooth disbursement of payments.• Technical reasoning for supporting the claims of milestone and clearance of Punch-list items.• Evaluation of community complaints related to project operation• Resolution of community complaints based on technical assessment and community needs.

    • MM Pakistan (Pvt.) Ltd.

      May 2021 - Dec 2023

      Responsibilities:• Preparation of Tender documents, including tender stage drawings, tender technical specifications and technical reports for calculations of parameters.• Detailed design of up to 150m deep Rock cut slopes of T5 Extension Project.• Slope stability analysis of Rock and Soil slopes, using Rocscience Dips, RocPlane, Swedge and Slide software.• Seepage analysis of rock and slopes using Geostudio Seep-W for development of phreatic lines, calculation of Pore water pressure, discharges, and efficacy of grout curtains.• Settlement and bearing capacity analysis of switchyard area, Tailrace canal and Dividing wall.• Design of excavation slope using Ground Anchors and Rock bolts.• Preparation of design and construction drawings and their management through Bentley’s Project-wise system.• Technical meetings with client and contractor for explanation of design requirements and concepts.• Site visits to Tarbela 5th Extension Site to monitor construction progress.• Data analysis of field and laboratory factual data.• Review of factual data reports and design reports from the Contractor and answering technical queries.• Drainage scheme for rain/storm water management system of Project site.• Report writing for stability analysis and design reports.• Design coordination and amendment of drawings. Show less

      • Senior Geotechnical Engineer at Diamer Bhasha Hydropower Project.

        Oct 2023 - Dec 2023
      • Senior Geotechnical Engineer

        May 2021 - Dec 2023
  • Licenses & Certifications

    • Primavera P6 Professional

      NUST Institute of Civil Engineering
    • Registered Engineer.

      Pakistan Engineering Council (PEC)
      Dec 2013
    • Professional Engineer (PE)

      Pakistan Engineering Council (PEC)
      Feb 2023