
Artur Gulov
Drilling Manager

Connect with Artur Gulov to Send Message
Connect
Connect with Artur Gulov to Send Message
ConnectTimeline
About me
District manager
Education

Нижневартовский Нефтяной Техникум
1990 - 1993Техник-технолог Бурение Эксплуатационных и Разведочных НефтеГазовых Скважин
Тюменский Государственный Нефтегазовый Университет / Tyumen State Oil and Gas University
1996 - 2001Инженер Разработка и Эксплуатация Нефтяных и Газовых Месторождений
Experience

JSC Oil and Gas Company Slavneft
Jun 1996 - Dec 2004Drilling ManagerVarious positions including:Assistant Driller, Driller, Mud Engineer, MWD Engineer, DD Engineer, Assistant Toolpusher, Drilling Foreman (Toolpusher), Drilling Manager.

ТНК-BP
Jan 2005 - Sept 2008Technical management a few rigs Management drilling on the rig
Senior Engineer of Drilling at Supervision Group
Dec 2007 - Sept 2008Drilling Supervisor
Jan 2005 - Dec 2007

SAFMAR
Sept 2008 - Apr 2009Deputy Manager of subdivisionDrilling in Azerbaijan Republic - oilfields Mishovdag (Shirvan) and Zyh (Absheron)

ТНК-BP
Apr 2009 - Feb 2011Senior Engineer of Drilling & Side-Tracking, KPI Chief Specialist of Drilling and STBeginning as KPI Chief Specialist of Drilling and ST and then proceed as Senior Engineer of Side-Tracking, Drilling Supervision Department, “SNG” JSC, BU “Samotlor”, “TNK-BP.Job Description (as senior engineer): Technical direction of works by building wells during Side-Tracking (objects of BU “Samotlor”).Job Description (as KPI chief specialist of drilling): Complex analysis of basic factors by Drilling and ST on BU “Samotlor” oilfields, including analysis the efficiency service of Drilling Contractors and basic service Contractors (including bit service, engineering and telemetrically service, cementation and attendance of drilling solutions). Development and introduction reporting forms, also principles the calculation of KPI for estimate quality of drilling and service of Contractors. Development and introduction estimate methods of Technical bound in the time of drilling by different types wells on BU «Samotlor» oilfields. Creation and introduction formulas of algebra for formation different reports by working on-line at the System to Evaluate Performance of Suppliers. Introduction new methods of formation reports for estimate Contractors service. Own introduction more than 30 innovations & improvement STEPS programme. Conducting & support training by working at STEPS for BU "Samotlor" specialists and Contractors. Analysis results of introduction new technologies and exploitation measures to removal exposed faults for using existing technologies. Show less

Integra
Mar 2011 - Dec 2012Integra Drilling - Department of Integra Project Management.Ответственность за управление проектом в целом, его администрирование, техническую часть проекта и соблюдение бюджета проекта на всех стадиях его развития. Ответственность за инженерию проекта в целом. Управление и координирование ИТР по всем видам работ. Проведение оценки критериев выбора подрядчиков. Ответственность за ОТ, ПБ и ООС, контрактование и принятие решений по контрактам, закупку и доставку материалов и оборудования, контроль качества оборудования. Принятие решений в критических ситуациях.The successful drilling of second ERD wells in the Yurkharovskoye field (closure more than 5 kilometers). The 9 5/8“ casing shoe depth 5788 meters (TVD is 2820m), 6 5/8” liner depth is 6980 meter, a closure 5377 meters.Prepare and drilling unique design well with a planning depth 8282 meters and with closure about 6900 meters. Show less Сначала в компании Smith Production Technology INTEGRA Group, затем после реорганизации (слияния) в компании Integra Drilling INTEGRA Group.Управление и координирование инженерно-технического персонала по всем видам работ. Ответственность за инженерию проекта в целом. Участие в подготовке тендерной документации. Подготовка технических и коммерческих предложений. Оценка критериев выбора подрядчиков. Проведение тендеров с различными Подрядчиками. Анализ параметров и показателей бурения (буровые растворы, долота, наклонно-направленное бурение, крепление и цементирование). Внедрение передовых технологий при бурении скважин.2011 - The successful drilling of first ERD wells in the Yurkharovskoye field (closure more than 4 kilometers). It is multilateral well. The 9 5/8“ casing shoe depth 5577 meters, window is 5426-5431 meters, first 6 5/8” liner depth is 6390 meter, sidetrack (second 6 5/8” liner) depth is 6051 meters. Show less
Project Manager
Feb 2012 - Dec 2012Project Technical Director
Mar 2011 - Jan 2012

Investgeoservis
Jan 2013 - Feb 2017Drilling ERD wells in Yurkharovskoe field.October 2013 - successful drilling ERD well with unique design in the Yurkharovskoye field (closure more than 5800 meters). The 9 5/8“ casing shoe depth 4867 meters, the 7” cementing liner depth is 5832 meter (a head of 7" liner hanger is 4354 MD), the 5” liner depth is 7274 meter (a head of 5" liner hanger is 5730 MD), a final closure 5839 meters.November 2013 - successful drilling a new record ERD well in Siberia with unique design in the Yurkharovskoye field (closure more than 7000 meters). The 9 5/8“ casing shoe depth 5626 meters, the 7” cementing liner depth is 6997 meters (a head of 7" liner hanger is 5121 MD), the 5” liner depth is 8497 meters (a head of 5" liner hanger is 6929 MD), a final closure 7059 meters. ERD rate is 2.43.June 2014 – multilateral (3rd level TAML) ERD well drilling completed with a record depth - 9 ⅝“ casing shoe depth is 5049m (TVD is 2471m, closure to the shoe is 3825m). The 7“’ cementing liner depth is 6119m (TVD 2807m and closure is 4835m). Section 155.6mm the first (primary) 5” filter liner completed in total depth is 7418m (vertical 2904m, 1299m length of the open hole, closure is 6065m). Successful cutting "window" in 7” casing in the interval 6054-6059m (TVD is 2777m and deviation in the window was 4780m). The use of whipstock system “Trakmaster Plus”. Sidetrack ø155.6mm with total depth 7438m and 5” filter liner RIH in two stages (length ST open hole from the window was 1379m, closure ST is 6155m, TVD is 2880m). Multiple joint (Multiple System completion “Rapid Tieback”) was RIH after removal of the wedge. The ERD ratio is 2.14. Show less
Director of Drilling Engineering Department
Dec 2015 - Feb 2017Project Manager
Nov 2014 - Nov 2015Technical Manager of Project
Jan 2013 - Oct 2014

Tesco Corporation
Mar 2017 - Aug 2019Deputy of General Director, District ManagerDevelop and implement comprehensive management plans for assigned strategic accounts, including directing and coordinating all sales and marketing activities for external and internal customers. Management of Tubular Services sales plans and new business development in applicable regions. In conjunction with Operations, direct sales forecasting activities and set performance goals with supporting metrics, scorecards and efficiency measures. Working with Business Development function and regional teams, develops and executes numerous BD plans to increase market share and operating income. Work directly with clients in key accounts to develop new business opportunities. Manage and control costs. Leads and constructs all TS tenders. Advise the planning and execution of projects when required: use technical experience and support to mentor regional resources; lead team in formulating corrective action. Show less
Licenses & Certifications

Extended Reach Engineering Design and Implementation Course
K&M SchlumbergerFeb 2012
Languages
- таТатарский
Recommendations

Cheryl fuchs lawrence
Owner at Priority Pro Management Services at Priority Pro Management ServicesIndian Rocks Beach, Florida, United States
Reza panahi
Senior Process Engineer at Pars Oil companyIran
Jesse stewart iv
Multifamily Investor | Multifamily Syndicator | Emerging Multifamily Developer | FHA Multifamily Loa...Detroit, Michigan, United States
Marcos aguiar
Analista Judiciario - Especialidade InformaticaSão Paulo, São Paulo, Brasil
Heysha zaveri
Student at OP Jindal Global UniversityCoimbatore, Tamil Nadu, India
Rosalie lessard
Strives to empower others attain their goals with an emphasis on safety.Beacon, New York, United States
Céline sophrologie
Sophrologue - SophrothérapeuteGranges-les-Beaumont, Auvergne-Rhône-Alpes, France
James mair
General Practitioner at Island Medical Centre. Chair of the UK Association of Aviation Medical Exami...St. Helier, St. Helier, Jersey
Glen fonseca
Director de Asuntos Jurídicos y Gobierno en Federación Nacional de Productores de Carbón - FENALCARB...Colombia
Budi risanto
Mineplan Superintendent at PT Petrosea TbkIndonesia
Éamonn ó caoimh
Senior Program Manager - Global MYAIrlanda
Ishaq muhammad
Graduate Student at Sarhad University of Science and I.T-Peshawar PakistanPeshawar District, Khyber Pakhtunkhwa, Pakistan
Francesco chiappalone
Project Manager at The Lane Construction CorporationSeattle, Washington, United States
Jaroslav louzensky
ACCA | Group CFO at Direct autoCzechia
Dustin mays
DevOps Engineer | Quality Engineering Lead | Promoting Operational Efficiency & Cross-Departmental C...Boulder, Colorado, United States
Rajesh muralidharan, pmp®
Chief Architect - Technical Project Management at Vitesco TechnologiesBengaluru, Karnataka, India
Ashish agnihotri
10+ years of consulting experience 🏅 |Delhi, India
Mohamed kadiri
RESPONSABLE SUPPLY CHAIN ONCFMorocco
Engr. md. amran bashar
Planning Engineer at IHI Infrastructure Systems Co., LtdBangladesh
Kumar vivek
HXM | SAP HCM for S/4HANA | SAP SuccessFactorsDelhi, India
...