Mohamed Elsayed

Mohamed Elsayed

HVAC Site Engineer

Followers of Mohamed Elsayed371 followers
location of Mohamed ElsayedRiyadh, Saudi Arabia

Connect with Mohamed Elsayed to Send Message

Connect

Connect with Mohamed Elsayed to Send Message

Connect
  • Timeline

  • About me

    HVAC Senior Mechanical Engineer

  • Education

    • Mansoura University

      1996 - 2001
      Bachelor's of Engineering Power Mechanical Engineering
  • Experience

    • Refrigeration Industries and Storage Company

      Oct 2001 - May 2008
      HVAC Site Engineer

      Work Performed:-my duty is to follow several stages of implementation of HVAC works for more than 300 villas& high buildings starting before building construction till to handover to the client.the main obstacle is how to manage this huge quantity of tasks with required action in less time by:- 1-preparing very detailed and clear drawings for staff.2- make complete fabrication in the duct workshop to reduce the time of installation on the site.3- Always follow up with the client to push him to finish the other related trades like false ceilings, doors, windows,....etc.4- make modifications for drawings (if required) to reduce the time of implementation also cost. عرض أقل

    • First United Trading & Contracting Company

      Jul 2008 - Oct 2015
      Senior HVAC Engineer

      Work Performed:-1-Design & development for handled projects it is mean that my duties will be procced all tasks from(A-Z). started from the design stage till to project handover to the client.2- Getting quotations from suppliers for all main HVAC items also makes negotiating with them to have a less price for vendors which should be matching with specifications.

    • Al-Kharafi Construction Co.

      Nov 2015 - Oct 2020
      HVAC/MEP Manager

      New Jahra Hospital is a mega fast-track project in Kuwait with a total amount of 1.2 billion us dollars, and the volume of MEP trades is 300 million us dollars, it started in March 2015 and finished in May 2019.Work Performed:-this project was the biggest challenge in my life because it was so huge with tight time finished only in four years although the volume of trades need six years to be finished at least, I divided the project into one hundred small areas and consider each area as a separate small project with special manpower working 24h/7d. The challenge was how to coordinate between more than 15 MEP trades without any crossing in addition to medical layouts on site.professional time management and removing obstacles as fast led to the project being finished and delivered to the client as planned.https://youtu.be/PL6_OgSfb38 عرض أقل

    • Middle Delta for Electricity Production Co.

      Nov 2020 - now
      Senior Mechanical Engineer

      Performed Works make modifications for a few systems as follow:- 1- take some of the flue gases system to heat up the air intake to the gas turbine which saves energy and improves the efficiency system. 2- fabrication additional H.E for condenser.