Miklos Tamas

Miklos Tamas

Followers of Miklos Tamas1000 followers
location of Miklos TamasGyál, Pest, Hungary

Connect with Miklos Tamas to Send Message

Connect

Connect with Miklos Tamas to Send Message

Connect
  • Timeline

  • About me

    | Maintenance Manager | Water Treatment Engineer | Production Manager |

  • Education

    • University of Public Service

      2002 - 2006
      Bachelor's degree Mechanical Engineering
    • Pannon Egyetem - University of Pannonia

      2017 - 2018
      Postgraduate Degree Water Quality and Wastewater Treatment Management and Recycling Technology/Technician
    • John Von Neumann University

      2011 - 2013
      Postgraduate Degree Alternative Energetics Engineer
  • Experience

    • Procter & Gamble

      Jan 1994 - Jan 2006

      Planned and implemented projects and maintained communication with other factories.Calculated project costs, create quotes, and issued purchase orders.Tested projects and documented results.Monitored production capacity and created solutions for increased capacity.Created training materials for operators and team leaders. Operated and modified the maintenance system, including the TPM system and other technologies.Analysed mechanical defects and created action plans to resolve them.Analysed waste and created action plans to reduce it; monitored progress.Conducted shakedowns for new lines and installations on site.

      • Project Leader

        Jan 2004 - Jan 2006
      • Maintenance Leader

        Jan 1999 - Jan 2004
      • Maintenance Technician

        Jan 1995 - Jan 1999
      • Operator

        Jan 1994 - Jan 1995
    • Bilfinger

      Jan 2007 - Jan 2008
      Site Manager

      Oversaw & managed all on-site activities. Conducted safety training for workers and supervised their exams.Key Projects:Leopoldov: Led installation of pipelines in a bioethanol factory with a team of 32 people.Antwerpen: Led installation of new pipeline systems at Bayer hydrogen replants.Vlissingen: Led installation of a new hydrogen module factory.Antwerpen BASF Oil Refinery: Led installation of new pipeline systems.Vohburg BAYERN OIL: Led installation of new pipelines.Irsching: Led erection of air intake system for CCGT Siemens. Show less

    • Metria-VTO

      Jan 2008 - Jan 2009
      Export Packaging Manager

      Identified transportation project opportunities and provided options to the requester.Determined appropriate type and conditions of packaging for transportation.Calculated required materials, organised packaging, and oversaw the main steps of various projects.Ensured compliance with standards and document completed work.

    • Opitiki Mechanical Services

      Jan 2009 - Jan 2010
      Diesel Mechanic

      All Mechanical Repairs, such as petrol & diesel mechanical, farming, and commercial vehicles, and trucksrepairs.

    • Nestle Purina

      Mar 2009 - Mar 2010
      Maintenance Planning Engineer & Lead Engineering Manager

      Led the engineering team activities to ensure smooth operations and project success.Directed and improved the Total Productive Maintenance (TPM) system to enhance productionefficiency.Improved the SAP database by creating Bills of Materials (BOMs) for production blocks/stations.Organised and built maintenance systems for various subunits such as:- Cooling-, water – and gas systems and other utility blocks.Installed and validated new production machines to improve production capabilities.Inspected standard rolls and modified them as necessary to meet safety standards (ATEX).Managed facility maintenance to ensure safety and operational efficiency. Show less

    • GE Power & Water

      Mar 2010 - Dec 2013
      Maintenance/Reliability engineer

      Managed maintenance team activities and improved process flow for CNC and NC machines.Drove root cause analysis for machine failures and defined bill of materials for machine repairs.Created training materials for technicians and led training sessions.Created weekly machine downtime reports and coordinate corrective actions.Led Six Sigma projects to improve machine reliability and reduce downtime.Analysed risk ratings for machines and evaluated spare external service availability and knowledge.Led a corrective action for DT analysing to improve machine reliability. Show less

    • Eastern Bays Motors

      Jan 2013 - Jan 2014
      Car Mechanical

      Provided services for cars, trucks, motorcycles, boats, and heavy machinery.

    • ProMinent Magyarország Kft

      Oct 2014 - Oct 2017
      Project Engineer (NPI Engineer)

      Installed and validated new water treatment systems.Led and organised subcontractor activities to ensure project success.Ensured technical compliance based on documentation.Validated required modifications with designers to meet project requirements.Approved extra work costs with clients to maintain the project budget.Maintained and set up system units such as sondas and metering pumps.Provided support to service team technicians to ensure customer satisfaction.

    • Beck and Pollitzer

      Oct 2017 - Sept 2019
      Senior Project Engineer

      Unloaded units from the truck and prepared them for installation.Installed machines and organised installation activities based on documentation.Created lifting plans for heavy units and provided them to the safety department.Led commissioning activities with OEM's superintendent.Created temporary solutions for fixing machine defects in agreement with Supervisor.Maintained contact between the client and the OEM's engineering team.Led and organised subcontractor activities for a team of 60 personnel.Followed the commissioning failure list and punch list to solve problems.Managed project costs and budget. Show less

    • Samsung SDI

      Sept 2019 - Mar 2021
      Maintenance Manager

      Executed tasks based on the Quality Management System to ensure quality standards were met.Kept job descriptions up to date to improve organisational efficiency.Ensured effective information exchange between team members and other departments.Motivated and improved subordinates to achieve company goals.Identified and implemented new projects to improve maintenance processes.Controlled and planned the maintenance budget to ensure efficient allocation of resources.Followed up on required quality issues and resolved them promptly.Followed up and improved technological instructions within the work area.Organised education and training sessions for engineers and technicians to improve their skills andknowledge. Show less

    • Rossi Biofuel Zrt.

      Apr 2021 - now
      Technical Engineering Manager

      Led project evaluation, including budget control, to ensure successful project completion.Built up the maintenance organisation system to ensure efficient equipment and facilities maintenance.Led the utility system operation by external contractors, ensuring uninterrupted operations.Managed the energetic contract with suppliers, ensuring cost-effective energy procurement.

  • Licenses & Certifications

    • Certified Fire Protection Specialist (CFPS)

      L&L Oktato Bt.
      Jan 2022
    • Pneumatics - finished all courses

      Festo
      Jan 1996
    • PACKAGING CONSULTANT (environmental compliance)

      Magyar Szabványügyi Testület
      Jan 2008
    • Light Machine Operator

      Csúcs 91. Oktatási és Vezetési Tanácsadó Kft.
      Jan 1997
    • Explosion Protection Technologies

      Budapest University of Technology and Economics
      Jan 2022
    • Welder Certificate (135 ,136 - MAG)

      TÜV Rheinland Group
      Jan 2009
    • Welder Certificate (141 WIG, 111 E)

      TÜV Rheinland Group
      Jan 2009