Bhaskar Sen

Bhaskar Sen

Followers of Bhaskar Sen702 followers
location of Bhaskar SenBhandara, Maharashtra, India

Connect with Bhaskar Sen to Send Message

Connect

Connect with Bhaskar Sen to Send Message

Connect
  • Timeline

  • About me

    Assistant Manager, Mechanical for Beneficiation plant

  • Education

    • Oxford Public School, Ranchi, CBSE Board

      2004 - 2006
      High School Science
    • Surendranath Centenary School, Ranchi, CBSE Board

      2003 - 2004
      Secondary School Examination Science
    • Rajiv Gandhi Prodyogiki Vishwavidyalaya

      2007 - 2011
      Engineer's Degree Mechanical Engineering First Grade
  • Experience

    • Electrotherm (India) Limited

      Dec 2012 - May 2021

      • Knowledge of Hydraulics and Pneumatics.. Responsible for 6 power packs, Tap hole drill machine, Mudgun machine..Responsible for both the Stoves of Blast furnace 1& 2• Manpower handling, spare part Inventory management.• Knowledge of Preventive & Breakdown maintenance• Upkeep of equipment’s, ensuring 100 % availability for production• Prepare preventive maintenance schedules for major / critical equipment’s.• Regular maintenance of Belt Conveyors, gear box & regular preventive maintenance.• Planning and modifications for reducing Breakdowns.• Analyze each mechanical breakdown and plan for preventing not to reoccur.. Maintenance and errection of stove valves Hbv, chimney valve.. Successfully completed burner errection of hot Stoves during relining. Show less Past Job Responsibility as an Engineer -Area In-Charge {RMHS} (July 2013 till April 2017):• With over 4 years of hands on responsibility. Handling RMHS consisting of 27 Conveyor belts, 13 Vibrating Screens, 20 Vibro-feeders, 02 Tripler Trolley and 01 Shuttle Conveyor.• Responsible for preventive and breakdown maintenance of 02 skip car.• Making Day wise Maintenance Planning and Shutdown Planning.• Maintaining stock of material & preparing reports for the same.• Identifying the problematic areas through daily supervision & undertaking necessary actions for the same.• Ascertaining the overall equipment effectiveness of individual equipment & monthly maintenance cost of materials.• Reporting to GM-Mechanical.Past Job Responsibility as a GET - Shift In-Charge ( Dec 2012 till July 2013):• Area wise maintenance of Two Blast Furnaces of 128 m3 & 65m3 i.e. GCP, PCM, RMHS, Stoves, Cast House, EOT Crane, Blowers, Utility.• Planning for Preventive Maintenance of equipment’s.• Attending Breakdown in least possible time.• Planning of manpower and job on daily basis.• Planning and attending the Shutdown jobs.• Reported to Sr. Manager & GM- Mechanical.Noteworthy Achievements/Awards received at Electrotherm – • Letter of Appreciation by the Management and Mr.B.S.Sharma (Executive President) for highest contribution and excellent performance in achieving target oriented production during the year 2015-16 • Certificate of Achievement (Blast Furnace & Sinter Team) for outstanding performance and achievements during the month of March 2016 by Mr. Avinash Bhandari (Joint Managing Director) Show less

      • Senior Engineer - Mechanical

        May 2017 - May 2021
      • Engineer - Mechanical

        Dec 2012 - May 2017
    • Sunflag Iron & Steel Co. Ltd.

      May 2021 - Jun 2022
      Senior Engineer - Mechanical

      Responsible KPI holder for Hydraulics, Pneumatics and Raw Material Handling System of 452 M3 MBF ( BLT SYSTEM).

    • ArcelorMittal Nippon Steel India

      Jun 2022 - now
      Assistant Manager

      KPI Holder for Raw material handling system ( RMHS) , Hydraulics, Stackers and Reclaimer

  • Licenses & Certifications

    • 3 Level Skillset Development Program on Hydraulics & Pneumatics

      Electrotherm (India) Limited
      Aug 2016