Kobus Venter

Kobus venter

bookmark on deepenrich
location of Kobus VenterPetaling Jaya, Selangor, Malaysia
Followers of Kobus Venter323 followers
  • Timeline

  • About me

    General Manager Hydropower & Dams, South East Asia at SMEC

  • Education

    • South african council for project managers and construction project managers

      -
      Professional construction project manager
    • Engineering council of south africa

      -
      Professional engineer registration
    • Stellenbosch university/universiteit stellenbosch

      -
      Bachelor's degree civil engineering
  • Experience

    • Dept. of water affairs and forestry, south africa – construction division

      Sept 1987 - May 1991

      Site and then Resident Engineer – Knellpoort Dam Project- Planning, co-ordinating and the construction of the water supply project consisting of Knellpoort Dam (45 m high Roller Compacted Concrete gravity arch dam), Tienfontein Pump Station, Pipeline and Canal (17 cubic metres/second), Novo Tunnel and Residential Area.- Planning and supervision of foundation grouting, mechanical and electrical contractors.Special Achievements:- Projects completed on time and within budget and the site obtained a 4-star NOSA safety rating as well as the prestigious Gold Plate Award for 1 million accident free man-hours worked. Show less

      • Resident Engineer – Theewaterskloof Water Scheme

        Nov 1990 - May 1991
      • Site and then Resident Engineer – Knellpoort Dam Project

        Sept 1987 - Oct 1990
    • Lesotho highlands consultants, lesotho

      Jun 1991 - Jun 1993
      Site engineer – ancillary structures and tunnels – katse dam

      Site Engineer – Ancillary Structures and Tunnels – Katse Dam (Katse Dam – 185 m high double curvature concrete arch wall, structures and tunnels.- Specialist advisor on the placing and testing of Roller Compacted Concrete used for a 25 m high river diversion dam.- Site supervision and quality control during the construction of two 8 m diameter river diversion tunnels, small diameter galleries and a 12 m diameter underground valve chamber at Katse Dam.Special Achievements:- Successful transfer of skills to colleagues in the use of Roller Compacted Concrete.- Managed to enforce a high level of compliance with technical and quality standards during construction. Show less

    • Dept. of water affairs and forestry - south africa - regional office

      Jul 1993 - Feb 1998
      Principle engineer – water resources

      Principle Engineer – Water Resources- Responsible for the technical, financial and legal support services to some 44 Irrigation Boards in the Province of KwaZulu Natal.- Specialist input as a Steering Committee Member investigating the feasibility to construct irrigation dams in KwaZulu Natal.Special Achievements:- Created and implemented financial controls to monitor the Government subsidies for irrigation projects (E.g. subsidy for the Paris Dam Project).- Through specialist input and assistance with the subsidy application document, the Paris Dam Project was approved. Show less

    • Stemele bosch africa pty (ltd) south africa

      Mar 1998 - Mar 2005
      Project manager - dam & hydraulic projects

      Project Manager – Durban Office- Responsible for the Programme Management of the Xoshindlala Development Programme (Implementation of 650 Agricultural Community Projects and assisted by 5 Regional Project Managers).- Project Management of the Paris Dam Irrigation Project (75 m high double curvature concrete arch wall) and the Simdlangenthsha Bulk Water Supply Scheme (Pump stations, reservoirs and pipelines).Special Achievements:- Resolved environmental objections against the construction of the dam and social problems surrounding the relocation of the affected communities. These matters were jeopardising the construction of the Paris Dam Project.- Negotiated and resolved several contractual claims and disputes through the appointment of a Dispute Adjudication Board, which resulted in a settlement. Also normalised stormy relations between client, consultant and contractor.- Implemented an Internet based information management system to centralise project reporting and enforce workflow, tight financial controls and create an audit trail. Show less

    • Pacific hydro chile s.a.

      Apr 2005 - May 2009
      Project manager - coya ii hydro project

      Project Manager – Santiago Office- Responsible for the Project Management of the feasibility studies for the Coya I Hydroelectric Project Upgrade. However, this project was found to be financially non viable and the scope of work was changed to then include the feasibility studies and final engineering design for the Coya II Hydroelectric Project (project development placed on hold).- Project Managing the feasibility studies and basic engineering design of the Nido / Las Lenas Hydroelectric Projects.Special Achievements:- Turned around the non viable Coya Upgrade Project into the financially viable Coya II Project that has a completely greenfield status compared to the previous extremely difficult to construct brownfield status.- Managing several International Engineering Consultants that are performing the studies and design for the above projects.- Successfully took over all the project management duties for the Nido / Las Lenas projects due to a resignation and continued with the work up to the end of basic engineering design. Show less

    • Pacific hydro chacayes s.a.

      Jun 2009 - Dec 2011
      Project coordinator/site qa/qc manager - chacayes hydro project

      Project Coordinator/Site QA/QC Manager – Chacayes Site Office- Responsible for all coordination between the Pacific Hydro Head Office and Site Office during the construction phase of the Chacayes Hydroelectric Project, and in particular for design and contractual matters. The Chacayes Hydroelectric Project entered into commercial operation at the end of December 2011.- Managing the Quality Supervision Team of the owner on site in order to ensure that the EPC contractor achieve the highest level of compliance with quality standards and technical specifications.Special Achievements:- Ensured the efficient flow and recording of information between Head Office and the Site Office. This information was invaluable and was used in the evaluation of contractor’s claims and presented to the Dispute Resolution Board.- Trained and led the quality team to identify and record all substandard work performed by the contractor. More than 500 non conformances were issued during the construction period and to date an 80% closure rate has been achieved through constant interaction with the contractor.- Managing and working with an International EPC contractor that is doing the construction of the Chacayes Project and Engineering Consultants that are doing the design. Show less

    • Pacific hydro

      Jan 2012 - Feb 2015
      Design manager - hydro projects

      Design Manager – Santiago Office- Project Managing the re-initiation of the feasibility studies and then the basic engineering design for the revised Coya II Hydroelectric Project (New Right Bank conveyance system and revised downstream Powerhouse location) and the project was renamed Los Arandanos Hydroelectric Project.Special Achievements:- Personally investigated and proposed for further feasibility studies a completely new Right Bank conveyance system and pond with a revised downstream powerhouse location. The previous project layout presented potential Environmental & Community concerns due to being close to a National Reserve, small village and town.- Managing Engineering Consultants that are performing the feasibility studies and basic design for the above project. Show less

    • Norconsult andina s.a.

      Apr 2015 - Dec 2017
      Project director

      Management of technical area that includes hydropower, hydrology, sedimentation, geology, structural, electrical, structural and achitectural design as well as environmental management and community services.

    • Smec

      Feb 2018 - now
      General manager hydropower & dams, south east asia
  • Licenses & Certifications

    • Registered professional engineer

      Ecsa